Senior Surveyor
Mohamed Riyaldeen Mohamed Ibrahim
MSc in Executive Project Management, Malaysia
BSc (Hone) Quantity Surveying and Construction Management, UK
Licensed Surveyor and Leveller
Advance Diploma in Surveying & Levelling
adpjsv@r.postjobfree.com
Cellular: 009**********
Achievement
Registered licensed Surveyor and Leveller in the State of Sri Lanka since 2005. Field experience includes Top order Horizontal & Vertical control, Setting Out of structural locations, Supervising field survey crews of Express Highway Projects in overseas and Sri Lanka, Marina, Land Reclamation, Building and Boundary Survey using GPS LEICA system 500, Total Stations such as Topcon 7000 series, Leica 1900 series, Sokkia set 2c-11,Geodimeter system 400 with Leica digital Levelling and NAK 2 Auto level and for the reduction and calculation using the civil3d software and AutoCAD.
EXPERIENCE ( 35 Years in the field of Construction)
Key strength
Possess a creative, outgoing, and exceptionally positive personality.
Remarkable ability to effectively implement and accomplish assigned tasks in a timely manner without sacrificing quality
Outstanding talent for dealing with and coming up with solutions to unexpected problems with little difficulty
Highly self-motivated and results-driven, with the ability to work well with zero to minimum supervision
Extensive knowledge and experience in the field, with a proven ability to suggest improvements and produce perfection on negotiations and recommendations
Exceptional ability to strategize for minimum loss of man-hours related to unpredictable circumstances
Excellent ability to effectively juggle several priorities in a fast-paced work setting
Superb communication and interpersonal skills, with a unique talent for handling and resolving conflicts among the team
Ability and strengthen quick grab new ideas and technologies in order to maximize the production.
Work under challenging situations.
Quality of motivating others, Team work, dedicated, hardworking, sincere, Honest, with good communicating skill possessing great amount of patience with positive thinking, believing in doing best to achieve best in life & ability to deliver the good with punctuality.
Highly experienced in using various project management tools for scheduling, delegating responsibilities and collecting information.
Education
MSc in Executive Project Management, Malaysia 2017
BSc (Hone) Quantity Surveying and Construction Management, UK 2015
NEBOSH IGC2, IGC3 2014
Certified registered Licensed Surveyor and Leveller 2005
Aramco Qualified as Survey Party Chief 1996
ACAD R12, Colombo University, Sri Lanka, 1995
H.S. Diploma in Survey Technician (Advanced Level) 1986
Survey Department, Sri Lanka
Licensed Surveyor and Leveller Jan 2020 to Date
Local Road, Irrigation design and Execution
Sri Lanka
Engaging on precise measurements of land boundaries, geographical and man-made features, latitude and longitude, elevation, and other relevant data, as needed by the clients, in addition to that preparing all necessary calculations and generate reports, maps, etc. to help our clients in their engineering, construction, and development process
Supervise and conduct land survey operation including calculation of survey data for Irrigation system and Road
Checking Setting out Irrigation Side Drain and surface Drain
Checking Road Centre line and finish final Levels
Preparation of data, collect and assess for design and construction works
Determine and implement procedures to establish survey control
Verifying Accuracy of all survey data
Maintain accurate records and drawings on site
Assist in supervision and coordination of survey activities to specifications required
Assist in meeting with client, Consultants and Sub-contractors
Contact safety meeting within the crew and the site.
Senior Surveyor June 2017 to Dec 2019
Sothern Express Highway Extension Project Section -4
Hambantota to Mattala
Sri Lanka
Highway
Construction of Extension of Southern Express Highway Project (ESEP) from Mattala to Hambantota via Arabokka including 26Km Roadway, 1.8 Km viaduct, 3 span Box Culvert 7 Nos, 2 span Box Culvert 14 Nos, Single Box Culvert 23Nos, 6.5 Km Bridges (Ramp Roads), 24 Km of Diversion Roads, 53 Km of Elephant and ROW fences, 48 km of Guard rail, 47 Km of Earth, Berm and Cut side Drains and 70 Km of Dry Utility paths.
Irrigation System
Localized irrigation, Drip irrigation, Surface irrigation water is distributed over and across land by gravity no mechanical pump involved, Sprinkler irrigation, Sub-surface irrigation Drain, Aqueduct, Case Cade Drain and Side Drain Constructions along and a cross Express Highway.
Checking and Approving Horizontal and Vertical control such as Primary Control based on the approved Surveyor Department controls, secondary and treasury completed by Contractor and Sub Contractor).
Random checking field observation during inspection the inter monument survey.
Interdicting new Traverse loops and checking Traverse adjustment of vertical and horizontal.
Following shop drawings for design changers as adopted the site condition, providing detail survey data for modification for diversion road and channels.
Interviewing and approving prior to recruiting surveyors by Contractor and sub-Contractor and approving their CVs for site work activities.
Following site safety procedures and arrangement especially for site surveyor personals safety on site.
Reviewing proposed drawing and specifications and ensure the correctness of transfer of drawing details to ground.
Level implementation in the Road junction and intersections.
Checking formation level prior to back filling works, checking concrete bedding and top raised kerb level, formation of side walk, corridor for utilities.
Checking quantities for interim payment of contactor.
Following site meeting with client, contractor and sub-contractor.
Monitoring Excel sheet preparation of Wearing, Binder and ABC surface level for finding thickness prior to final approval of acceptation criteria.
KEO International Consultants, Doha, Qatar July 2012 to Mar 2017
Senior Highway Surveyor
Express Highway enhancement and link road improvement project, the vision of QNV 2030, 16 KM of single dual carriageway to four lane dual carriage way included four colour light intersection providing sufficient access for RASLAFFAN Industrial City and the farms with all the Dry and wet utilities.
Selecting and approving control monument location prior to control survey
Random checking field observation during the monument survey.
Checking Traverse adjustment Vertical and Horizontal control.
Review engineering drawing and specifications and ensure the correctness of transfer of drawing details to ground.
Checking Shop drawings prior to start site activities.
Supervision of four lane dual carriageway 38KM Road Construction and related Utilities with eight intersections with colour lights.
Supervision of Construction of Six Numbers of 2x600 Pipe Culverts, 16Km Road Project
Swale both side along the Road for flash water
270 No’s Gully Location for rain water.
MV LV, ITS, DSS Cable routing along the proposed road
Supervision and checking Grade levels, alignment of road and side kerbs top levels, base course levels prior to Asphalt pavement.
Supervision and checking of existing asphalt road level in order to remove or accommodate prior to start back filling activities.
Checking of Side Drain level, size and the Alignment.
Checking U/Ground Utilities routes and formation prior to pulling the cables.
Supporting to monthly payment certificate.
Attending site meeting with contractor and sub-contractor.
Checking weekly monthly progress in order to follow the schedule.
Consultant Surveyor Oct 2010 to July 2012
JICA Project, Road Development Department,
Eastern Province
AKKARAIPATTU 25KM internal Road improvement Project including construction of RC side drain LHS and RHS, 17Nos of (1.0x1.0) box culverts and 7 Nos. of 400 Diameter twin pipe culverts.
As built survey of existing road for demolition
As built survey of Side drain along the road for demolition and repair.
Demarcation of ROW in order Identify limit of proposed road.
Establishing horizontal and vertical control point every 100.0 m interval along the proposed road. Checking and marking critical location for design purpose.
Review engineering drawing and specifications and ensure the correctness of transfer of drawing details to ground.
Checking Grade levels, alignment of Road and side kerbs including levels, base course levels prior to Asphalt laying activities.
Checking of Culvert location, Upstream, Downstream levels for box culvert and the Alignment.
Checking of Side Drain level, size and Alignment.
Supporting to monthly payment certificate.
Attending site meeting with contractor and sub-contractor.
Checking weekly monthly progress in order to follow the schedule.
Associated Consulting Engineer, Doha, Qatar Oct 2006 to Oct 2010
Senior Surveyor Road and Utilities project
Construction of Energy City part of LUSAIL development QNV 2030, Business Centre Identifying individual plots and preparing internal standard access, Monitoring and Controlling Main contractor and Sub-Contractors’ daily activities in order to achieve estimated schedule.
Selecting and approving control monument location prior to control survey
Random checking field observation during the monument survey.
Checking Traverse adjustment Vertical and Horizontal control.
Review engineering drawing and specifications and ensure the correctness of transfer of drawing details to ground.
Level implementation in the Road junction and intersections
Checking formation level prior to back filling works, checking concrete bedding and top raised kerb level, formation of side walk, corridor for utilities.
Checking as built for Road, Sewer line, Strom water line, Electrical and Telecom Line, Potable water line, and Irrigation System for Energy City for Qatari DIAR(QD) at LUSAIL
Connecting to main header of sewage system.
Checking level and alignment during back filling in progress.
inspection with contractors level and alignment
Supporting to designers and schedulers.
Checking quantities for interim payment of contactor.
Following site meeting with client, contractor and sub-contractor.
For Lanka Hydraulic July 2005 to Sep 2006
Coastal Road and seabed Reclamation Feasible study Project
Licensed Surveyor and Leveller
Tsunami rehabilitation project in eastern coastal area form KALMUNAI to THAMPADDAI for refugee resettlement providing temporary Access and demarcation earlier boundaries.
Establishing vertical and horizontal control along propose road and detail survey across the line.
Providing longitudinal and Cross Sections every fifty meters interval in the propose roadway.
Setting out proposed main roadways.
Following inspection with road designers.
Review engineering drawing and specifications and ensure the correctness of transfer of drawing details to ground.
Provide Detail Survey Plan for possible junctions.
Provide extra spot levels as per requirement.
Attending meeting with the Client and Security services along coastal area.
Demarcating original road way on ground as requirement.
J&P (O) Ltd., Tripoli, Libya June1998 to June 2005
Senior Project Surveyor
Man Made River Project (GMMR) Tazerbo well field.
Providing Asphalt road for 52 water wells Tie in to main approach and involve as consultant surveyor for Faregh field development Project. Including prepare access road parallel to proposed 250Km crude oil flow lines to GOSP (25 oil wells) & 63 Km of Trunk line Tie in to loading main header for WAHA OIL COMPANY.
Selecting control monument location prior to control survey
Cross country traversing over the Control monument for vertical and horizontal control survey.
Review engineering drawing and specifications and ensure the correctness of transfer of drawing details to ground.
Adjusting traverse and establishing value for monument and get approval from third party survey.
Setting out ROW along the proposed corridor.
Topography for entire roadway to produce 20m interval cross sections and longitudinal section.
Checking level and alignment during back filling in progress.
Following inspection with engineers.
Supporting to designers and schedulers.
Preparing quantities weekly basis for claim.
Delivered status reports to senior management regularly (weekly/monthly/yearly).
Coordinated work with clients and client-related departments
Computed geodetic measurements and interpreted survey data to determine position, shape, and elevations of geomorphic and topographic features
Certified survey work, directed engineers of survey control along proposed roadway for double check levels and control by sub-contractor.
Ocean Quarry, Brunei January 1997 to January 1998
Senior Site Surveyor
Surveyed water bodies to determine navigable channels and to secure data for construction of breakwaters, piers, and Locating storm water drainage system, Reclamation by Dredging and preparing islands and access way with asphalting Construction of Jerudong beach protection phase-1 and phase-11
Review engineering drawing and specifications and ensure the correctness of transfer of drawing details to ground.
Coordinating with Design & Construction team.
Ensure the quality of the materials used for construction and also the completed member of the structure.
Supervision and Quality of structure works as per drawing & specifications & ensure no rework.
Maintain Quality Records.
Ensuring timely resource availability.
Ensuring Safety on site.
Pursue the contractor for progress with quality.
Preparation of Bar Bending Schedule.
Checking level and alignment during back filling in progress.
Following inspection with engineers.
Supporting to designers and schedulers.
Preparing quantities weekly basis for claim.
RGME, Saudi Arabia (Saudi Armco) December 1995 to January 1997
Survey Party Chief, Crew # 0703
With pipe line route survey grope in ABQAQ division Saudi ARAMCO, Planned ground surveys designed to establish base lines, elevations, and other geodetic measurements and determined appropriate and economical methods and procedures for establishing survey control. Drafted and directed others to draft maps of survey data.
well location survey for drilling purpose
Establishing top order controls Horizontal and vertical.
Topographical Survey for extension of existing plant
Flow Line routing and corridor Survey for final design and estimation
Leading for new survey crews as per the instruction by the supervising officer
Following Safety Training for restricted area survey.
Following demonstration for new invention in modern survey method.
Doing calibration of survey Equipment.
Al osais, Saudi Arabia July 1991 to July 1994
Survey Party Chief
Planned ground surveys designed to establish base lines, elevations, and other geodetic measurements and established fixed points for use in making maps using geodetic and engineering instruments.
Providing Setting Out and the level for Excavation for the concrete Structures.
Establishing Temporary Bench Mark around Proposed construction Area.
Construction of sewage lines, cabanas, Road and pavement and Marina for Saudi Aramco
Checking with Consultant Surveyor prior to casting Activities of Concrete Structure.
Following Tool Box meetings and the safety Trainings.
Maintaining Record for the all Survey Inspections.
Providing detail for Quantity Surveyor for interim Monthly Claims.
Survey Dept., Sri Lanka January 1986 to July 1991
Govt. Surveyor
Assist engineering design team in site development for utilities, storms, detention, paving, lakes, drainage studies, grading, and roads. Coordinated with construction firms involved in building structure. Designed and prepared proposals for construction costs, estimates, and specifications. Gained experience in site development, storm water detention, drainage, utilities design and skills in manual drafting, as well as AutoCAD.
Involve Land for land less program to issue Grants for new settled allotments
Channels trace survey for GALOYA by channels.
Involved LUPP survey in AMPARA Town area.
Involve for high Land and Paddy Land survey for issuing Grants.
LICENSES AND CERTIFICATE
Registered Licensed Surveyor and Leveller, Survey Department, Sri Lanka 2005. Registration number 20050972. Can be produce a survey plan in state level which is valid legal document in Democratic Socialist Republic of Sri Lanka
Completed Survey Party Chief Examination (written and practical) in Surveying Services Division Saudi Aramco, Saudi Arabia in 1995
Completed Safety module in Libya in 2002
Affiliation
Associate Member, Government Survey Association, Sri Lanka, and 1986 to 1991. Register in land ministry
Associate member, Survey Institute, Sri Lanka, 1991 to 2004. Keep on Following up Morden Technology in Survey field
Member, Land Survey Council, Sri Lanka, From 2005. Introducing Land Registration system all Island
Date of birth
15 Jun 1965
Nationality
Sri Lankan
Driving Licence
Sri Lanka, Libya, Brunei, and Qatar
FAMILY: Married and one son
Permanent Address: 209/2, Fiscal Road, AKKARAIPATTU-02, Srilanka
Referees
Mr. Abedeera
Project Director (PD)
Sothern Express Highway Extension Project Section - 4
Hambantota to Mattala
TP: 071*******
Mail: adpjsv@r.postjobfree.com
Mr. T.J.Bandula
Deputy Team Leader (DTL)
Sothern Express Highway Extension Project Section - 4
Hambantota to Mattala
TP: 077*******
Mail: adpjsv@r.postjobfree.com