Post Job Free

Resume

Sign in

Senior Mechanical Engineer- Rotating Equipments

Location:
Chennai, Tamil Nadu, India
Posted:
December 02, 2021

Contact this candidate

Resume:

RESUME

NAME :Sadees Kannian

POSITION TITLE : Senior Engineer

LOCATION : Chennai, India

CONTINUOUS SERVICE : 17 years

EMAIL ID : adpi4l@r.postjobfree.com / adpi4l@r.postjobfree.com

MOBILE NO +919*********

EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS

Degree, Certificate, etc.

School/Company

Major (or Subject)

Date

Master of Technology in Energy Conservation and Management

School of Energy Bharathidasan University

Thermal Engineering, Fluid Mechanics, Power Plant Technology

2004

Major Project in MTech

Bharat Heavy Electricals, Tiruchirappalli

Performance Evaluation of 300 TPD Coal Based Combined Gas Turbine and steam turbine

2004

Bachelor Degree in Mechanical Engineering

Shanmuga College of Engineering, Bharathidasan University

Thermodynamics, Turbo Machinery

2001

OTHER SIGNIFICANT INFORMATION

PERSONAL:

DOB: 23-Mar-1979

LANGUAGES:

English, Hindi and Tamil

CAPABILITY:

Mechanical Engineer with 17 years experience in FEED and detailed engineering of Rotating equipment (Pumps & Compressors) for OG&C and Power sector

MEMBERSHIPS:

Certified Energy Manager and Energy Auditor (EA-5281), Ministry of Power.

Organizational Details

1.Enter Engineering PTE LTD, Tashkent. Uzbekistan

October 2020 to October 2021

Project Handled: Boysun Gas Processing Plant

The project envisages the construction of a new Gas Processing Plant (hereinafter named GPP) to process 5 BCMA of raw natural gas with high content of CO2 and H2S produced at gas field “Mustaqilligning 25 yilligi” located in the Surkhandarya region of the Republic of Uzbekistan, in order to produce a treated gas suitable for domestic use or export,.

GPP is fed by Raw Natural Gas, connected from gas field to GPP inlet battery limits through seven (7) dedicated gas pipelines (one from each of the gathering stations) connected to an inlet manifold and other four (4) gas pipelines (one for each two gathering stations) connected to a Test Separation Unit. GPP consists of two (2) parallel trains, each train designed for 2.5 BCMA and basically consisting of the following main units:

Inlet Gas Separation Unit

Acid Gas Removal Unit (AGRU) (licensed by Shell)

Dehydration Unit

Sulfur Recovery Unit (SRU) (licensed by Shell)

In addition to these, there are other main units common to both trains:

Formation water treatment (Sour Water Stripper)

Sulfur Solidification Unit

Sour Water (Chemical Oxidation) Unit (licensed by Shell)

Utility Facilities & Offsites (U&O)

Current Position and Responsibility

Assigned Mechanical Engineer (PMC) for the Mechanical Rotating Equipments and Packages in

Boysun Gas Processing Plant

Mechanical Data Sheets

Material Requisitions

Shortlisting the Vendors from the bunch of approved Vendors

Technical Bid Analysis and Evaluation with Ranking among the vendors

Selection of the best vendor Techno commercially

Vendor Document Review and Squad checking with EPC and Client

Approval of the final vendor documents and stamping for construction

Major Equipment Handled

MR for API 673 Blowers and API 617 Part-3 Integrally Geared Compressors

MR for API 612 Special Purpose Steam Turbines

MR for Gas Engine Generator packages

MR for API 610 Heavy Duty Centrifugal Pumps

MR for API 618 Reciprocating Compressors for Air Booster and Nitrogen Booster System

MR for API 619 Screw compressors for Plant Air and instrument air system.

NON LLI

MR for Medium Duty Centrifugal API pumps

MR for Small Duty Horizontal Water Pumps ISO 5199

MR for Small Duty Centrifugal API Pumps

2.Company / Division / Location: VADEL Engineers and contractors, Bangalore, India

February 2020 to October 2020

Project Handled: INEOS ATEWARP BELGIUM

Project details

Project ONE consists of 2 major installations: an ethane cracker and a propane dehydrogenation (PDH) unit for the production of ethylene and propylene. These are essential building materials to fabricate important chemicals and polymers amongst other applications in wind turbines (lubricants), solar panels, medication (blood bags, sterile packaging, MRI scans…), building materials (water and gas pipelines that last at least 50 years), textiles, light car parts, etc.

Equipments Handled

MR for API 610 Heavy Duty centrifugal Pumps

3 nos boiler feed pump of 750 kW rated power, starting electric motor and running by general purpose steam turbine API611 with pressurized lubrication. Complete with machine monitoring and vibration measurements

MR for ISO 5199 General Purpose Centrifugal Pumps

3nos Cooling water circulation pumps for condenser cooling 2 MW motor .

MR For API 676 Progressive Cavity and Lobe Pumps

3.Company / Division / Location: Technip FMC Chennai, India Through Prathmetix Consultant Chennai

Period of Work: September 2018 ToFebruary 2020.

Position Held: Lead Machinery Engineer

Summary of Projects / Responsibilities / Significant Accomplishments:

A)Formosa Sunshine- HDPE/LLDPE FEED Project - ST. JAMES PARISH, LOUISIANA, UNITED STATES

1)MR for API 610 Heavy Duty Process Centrifugal Pumps

2)MR for API 685 Seal less Process Centrifugal Pumps

3)MR for ANSI B73.1 Process Pumps

4)MR for ISO 5199 Water Pumps

5)MR for Twin Lobe Blowers for Hydrocarbon gas

6)MR for Vacuum Pumps

B)Amur Gas Ethane Cracker plant, SIBUR Russia

1)Boiler Feed Pump- 500 m3/hr,170 bar, 2.8 MW Electrical Motors 2nos and 1 no Steam Turbine Driven 3.1MW with all Condition monitoring and Machine Monitoring System.

2)Circulating Water Pumps, 25000 m3/hr, 70 m head and 3.8 MW Driver Power. 3nos (1no Steam Turbine Driven and 2nos electrical Driven).

3)Large Centrifugal Pumps- De ethanizer feed Pumps-Hydro carbon-770m3/hr,410m head and 760kW motor power with necessary condition monitoring devices.

C)HURL – Urea and Ammonia Fertilizer plant, Barauni and Sindri.

1)API Special Purpose Centrifugal Pumps & Reciprocating Pumps

2)Non-API Process Centrifugal Pumps

3)API 674 Reciprocating Pumps

4)API 610 Urea Melt Pumps

D)IOCL Gujarat Refinery and IOCL Mathura Refinery India.

Equipments Handled

API 618 Reciprocating Gas Compressors:

2X100%, 8000 Nm3/hr, 35 bar, 225 KW HT Motor Driven gas compressors complete with Machine monitoring systems BN3500 series.

1)Frame Vibration Monitoring Sensor

2)Piston Rod Drop sensor

3)Bearing Temperature Sensor

4)Motor Bearing Sensor

API 617 Part-2:

1X100%, 120000Nm3/hr, 2 stage 18 bars, 40 MW Gas Compression power and 50 MW special purpose

API 612 Steam Turbine Driven Gas compressors complete with all condition monitoring devices.

API 671 Special purpose couplings

API 612 special purpose Steam Turbines

4.Company / Division / Location: WABAG MUHIBBAH JV, KLANG SELANGOUR, MALAYSIA

Period of Work: March 2017 To March 2018

Position Held : Mechanical Engineer

Summary of Projects / Responsibilities / Significant Accomplishments:

Engineering Coordination and Execution of RAPID project, Pengerang (Refinery and Petrochemical Integrated Development) PETRONAS

32 MLD Effluent Water Treatment Project

I)API and Non-API Horizontal Centrifugal Pumps

II)API 675 Controlled volume pumps

III)Vertical Turbine Pumps

IV)Compressed air system and packages

V)EOT cranes and Hoists

Engineering review and site coordination.

Inspection and receipt of Mechanical equipments.

Installation and erection of Mechanical equipments.

Alignment and final checking of individual components for Mechanical equipments.

Preparation and participation of SAT procedures for all mechanical equipments.

All other functional tests as necessary for Commissioning and startup to be performed.

5.Company / Division / Location: Petrofac Engineering services India Ltd, Chennai

Period of Work: June 2014 To March 2016

Position Held : Senior Mechanical Design Engineer

Summary of Projects / Responsibilities / Significant Accomplishments:

Reganne NORD Development Project for GroupmenttReganne, Algeria.

1)Centrifugal API pumps

Preparation of Material Requisition for API 610 Centrifugal pumps (Including 1 nos High energy pumps – 1.5 MW & 350 Kw) with NACE Compliance and necessary Condition monitoring devices.

Preparation of Mechanical Datasheets for API 610 Pumps in API 610 11thEdition.

Technical Bid analysis for the Centrifugal API pumps.

2)Positive Displacement Pumps

Material Requisition for Positive Displacement Pumps.

Preparation of Mechanical Datasheets for Positive Displacement pumps based on API 674 and API 675.

Technical Bid analysis for the API 675/674 pumps.

6.Company / Division / Location: Dodsal Engineering and Construction India Pvt Ltd. Chennai Mechanical Engineering

Period of Work: Oct 2012 To February 2014

Position Held: Senior Engineer – Rotating Equipment

Summary of Projects / Responsibilities / Significant Accomplishments:

Responsible for:

1.Material Requisition for the following Rotating Equipments.

API 610 Centrifugal Pump

API 674 Reciprocating Pumps,

API 675 Reciprocating Controlled Volume Pumps

API 617 Centrifugal Compressors

API Seal Flushing Piping Plans as per API 682 4th edition.

2.Preparation of Datasheets for API Pumps and Compressors.

3.Review of bids for pumps and compressors and Technical Bid Evaluation.

Projects Handled

1)Kuwait Oil Company- Effluent Treatment Injection Plant

Nutshell Filter Pumps- API 610 – BB5-NACE MR0175 with 9MW HT Motor Driven.

Booster Pumps With all Machine monitoring and condition monitoring devices.

Internal Deputation: Deputation to Worley Parson- Ranhill Joint Venture office in Kualalumpur, Malaysia

Period of Work: May 2013 To July 2013

Position Held: Senior Engineer – Rotating Equipment

Summary of Projects / Responsibilities / Significant Accomplishments:

Technical Proposal Engineering and preparation of BOQ for 300 MW Gas Turbine Based combined cycle power plant for SABHA Power Plant, SDN-BHD.

3Nos Methane fired Closed Cycle Gas turbines 80 MW each

3 Nos HRSGs producing 240 TPH steam.

2 Nos Steam Turbines 30 MW each along with condensers, cooling towers and other balance of plant equipments to full fill the requirement.

7.Company / Division / Location: Hindustan Dorr Oliver Ltd

Period of Work: August 2011 To September 2012

Position Held: Senior Engineer – Rotating Equipment

Summary of Projects / Responsibilities / Significant Accomplishments:

2x40 MW COG based Power and Blowing station for NMDC.

COG Boosters

Vertical Kilns

Steam Blowers

Cooling Towers

Cooling Water Pumps

8.Company / Division / Location: BGR Energy System Ltd

Period of Work: May 2008 To July 2011

Position Held: Engineer – Mechanical Design

Summary of Projects / Responsibilities / Significant Accomplishments:

Packages Handled

Fuel Oil Handling Systems.

Compressed Air System.

CW and ACW System.

Raw water intake system design from river

Sea water intake system design for condenser

cooling in thermal power plant.

Projects Handled

600 MW Mettur Thermal Power Project, Tamil Nadu.

2x600 MW Kalisind Thermal Power Project, RRVUNL, Rajasthan.

2x 500 MW BOP of Chandrapur power project.

2x500 MW BOP of Chapra thermal power

Water Pumps

General Purpose Centrifugal Pumps ISO 5199/ ISO2858.

18000 m3/hr (6x33%) vertical turbinepumpsVS1 Configuration.

Horizontal Centrifugal Pumps with concrete casing (BB1)

9.Company / Division / Location: Cethar Vessels Ltd.

Period of Work: August 2004 To May 2008

Position Held: Engineer – Mechanical Design - BOP

Summary of Projects / Responsibilities / Significant Accomplishments:

Packages Handled

Fuel Oil Handling Systems.

Compressed Air System.

CW and ACW System.

Review of HMBD.

Projects Handled

2 x 300 MW Meenakshi power Ltd.

1x 150 MW IndBharath Thermal Power.

1 x 50 MW Shree Cements.

2 x 25 MW Dalmia Cements.

1 X 30 MW Bindal Papers.

Pumps Handled

Main Cooling Water Pumps

Chilled water pumps

Circulation water pumps

Condensate Transfer pumps

LDO/HFO Pumps Screw Compressors

OTHER INFORMATION:

Passport No : N8260253/2016 and valid up to 10 may2026 Certificate stamping for UAE Employment and Kuwait Employment Done

Joining Time : one Month



Contact this candidate