** ***** ********** ** ******, Testing and Commissioning Projects For The Power Generation and Transmission Industry
Email: *************@*****.***
Ph: +919*********; +447*********
BRIEF OVERVIEW
Strong experience in managing commissioning and maintenance assignments with the power generation and transmission industry
Successfully handled and executed various assignments and projects
Keen learner, attended various training programs and seminars
Good team leader with effective communication and interpersonal skills
Holding GWO approved Offshore Certificates
Holding IOSH Health and safety Certificate
Holding BESC and NG Person Certificate
Holding Scottish power Renewables competent person Certificate
PROFESSIONAL EXPERIENCE
Scottish Power renewables (Iberdrola) March 2019- Present
Role: Protection, SCADA, Metering Manager (Design and Commissioning)
Direct Report: 9 Engineers
Indirect Report: 3 Engineers
Location: London, UK
Project : East Anglia HUB Offshore Wind farms(East Anglia North, East Anglia two and East Anglia three) – 3100MW
Review Supplier tender documents of GIS, Transformer, export cable, Shunt Reactors, Protection, SCADA, Metering and STACOM for both Onshore and Offshore Substations.
Technical Bid evaluations
Involve commercial negotiations with Suppliers ABB, SIEMENS, GE etc
Preparation of Employers requirements
Suppliers Drawings and documents review
Interface management with GIS, Protection, SCADA, Transformers, Shunt Reactors, Harmonic filters, export cables team.
Interface management with WTG suppliers.
Interface Management with electrical design and system studies.
Chair Design review meetings
Project: East Anglia one Offshore Wind farm- 714MW
Review of Onshore and Offshore Protection Drawings such as circuit diagrams, General arrangement drawings and wiring diagrams etc
Review of Protection and SCADA philosophy documents
Review of Grid code compliance documents.
Review of WTG Switchgear, Protection SCADA drawings.
Review of WTG Supplier interface engineering documents
Coordination with Protection, SCADA and WTG Suppliers
Coordination with Onshore and offshore Site commissioning team
Protection study report review
SLD review
Protection SLD and Trip matrix review.
SCADA Signals review
Provide technical expertise on system study, Protection, SCADA
Manage Protection, SCADA, Metering contracts
Involve commercial issues such as issue POs, process invoices, etc
Interface with WTG commissioning team
Interface with WTG SCADA team
Review National grid bilateral connection agreement
Coordination with WTG suppliers on grid code compliance tests
Technical coordination on OFTO divestment process
Coordination with OFTO Bidders.
Over reaching Design, testing and commissioning risk mitigation strategies
Review project quality documents
Prepare Protection, SCADA, Metering program
Onshore and Offshore SCADA Architecture Review
Onshore and Offshore SCADA NETWORK Review
Onshore and Offshore SCADA Specification review
Onshore and Offshore SCADA HMI Review
SCADA Remote access configuration review
Onshore and Offshore SCADA software interlocks review
Metering specification review
Metering drawings review
SCADA software list review
Coordination with SCADA supplier on Server redundancy testing, VRRP gate way redundancy tests, DTS signals testing, OFTO to GEN signals testing, GEN to OFTO signals testing.
Prepare overall commissioning program for both Offshore and Onshore
Review Health and safety Risk assessment and method statements
Coordinate commissioning activities with Onshore and Offshore commissioning engineers.
Review commissioning test procedure
Chair weekly Design Review meetings
Chair weekly commissioning meetings
Resource planning
Preparation of Project Program
Approving of Contractors invoices
Approving contractors time sheets
Providing technical training to internal staff
Project execution planning
Conducting team building events
Involve project contractual issues such as liquidated damages etc
Orsted UK Limited(Formerly Dong energy) Feb2014-Sep2015 and March 2016 – Feb 2019
Role: Design and Commissioning Manager
Direct Reports: 6 engineers
Indirect reports: 3 engineers
Location: London,UK
Project: Hornsea Offshore wind farm – 1200MW
Project: Walney Extension 03&04 Offshore Wind farm - 660MW
Below Design activities has been carried out as Design Manager
Review of 400kV and 220kV GIS/Protection SCADA signals list
Preparation of Protection SLD for Onshore 400kV GIS and 220kV GIS Substation
Preparation of Protection SLD for Offshore 220kV GIS and 34kV GIS Substation
Preparation of Technical requirement document.
Review of Protection schemes
Review of Protection relays Coretech
Preparation of CT/VT sizing document
Review of Onshore and Offshore Transformer technical specification.
Review of 400kV GIS Technical specification.
Review of 220kV GIS Technical specification
Review of 34kV Offshore Switchgear Schematics.
Review of Plant layout Drawings
Review of 400kV NG Bay Local control panel drawings.
Preparation of Transformers and HV components technical specification
Coordination with Transformer and Switch gear suppliers.
Coordination with Design, installation and commissioning team
Review of Health and safety documents
Support the procurement team in the coordination of tendering process and evaluation of suppliers
Review of Transformer control panels schemes
Review of protection setting calculations.
Review of 400kV GIS SLD Onshore Substation
Review of 220kV GIS SLD Onshore Substation
Review of 220kV& 34kV GIS SLD Offshore Substation
Review of 34kV GIS Local control panel schematics
Review of 400kv GIS Local control panel schemes
Review of 220kV GIS Local control panel schemes
Witnessing Protection FAT and SCADA signals
Witnessing 220kV GIS FAT
Witnessing 34kV GIS FAT
Review of Circuit breaker, Disconnector, Earth switch control panel drawings.
Managing team of Commissioning engineers as Commissioning Manager to carryout below site commissioning activities
Onshore Substation Site integration tests
Protection end to end test for Onshore and Offshore Substations
Offshore site integration tests
400kV GIS BCU SCADA signals testing
Protection SCADA signals testing
220kv GIS BCU SCADA signals testing
Software and hardware interlocking tests
400kV and 220kv GIS SCADA functional tests
400kV and 220kv GIS analog measurements checks
500MVA Transformer testing
250MVAR Reactor testing
Onshore and Offshore SCADA Functional tests
Onshore 400kV and 220kV GIS testing
Offshore 220kV and 33kV GIS Testing
Protection stability tests such as Transformer differential, REF, Burbar protection etc.
400kV, 220kV GIS CT/VT Primary injection tests.
Project: West of Duddon Sands Offshore Wind farm (108X3.6MW)
Preparation of commissioning test plan
Preparation of 240MVA Transformer test procedure
Preparation of Transformer Differential protection Test procedure
Review of Protection philosophy document
Preparation of Trip test procedure
Testing of 240MVA Transformer
Review of Protection schematics
Review of Protection settings
240MVA Transformer Primary injection test carried out
240MVA Transformer Differential protection stability test carried out
CT/VT Ratio test
SCADA signals test
CT/VT Secondary injection test
240MVA Transformer Automatic tap changer testing and commissioning
MICOM protection relays P443,P543 secondary injection test
34kV Busbar protection P132 relay testing
Busbar protection stability test
240MVA Transformer Insulation resistance test with 5kV Megger
Protection scheme checks
Implementation of IEC61850
Parameterization of relays signal
Mapping of GOOSE signals for switchgear and protection relays
Testing of SCADA signals
Review of SCADA communication network
Trouble shooting of GOOSE errors
Preparation of Software interlocks and implementation through IEC 61850
ALSTOM GRID UK Sept 2015- March 2016
ROLE: Lead Design Engineer
Location: Stafford, UK
Project: Wimbledon National Grid 16 bays 400kV GIS Substation, 275kV Mesh corner Substation, 31 Bays 132kV Substation
Preparation of 400kV GIS Substation Local control panel schematics
Preparation of Cable schedules for 16 Bays 400kV GIS Substation
Preparation of key line diagrams
Review of cable routes and plant layout drawings
Preparation of SCS I/O schedules
Preparation of interface schematics
Battery sizing
DC volt drop calculations
Preparation of cable block diagrams
Review of Transformer supplier drawings
Review of Protection supplier drawings
Preparation of electrical interlock drawings
Preparation of LVAC drawings
Preparation of DC distribution drawings
FREEDOM AGRILEK,UK Jan 2013- Feb2014
Role: PRINCIPAL DESIGN ENGINEER
LOCATION: Bothwell,SCOTLAND,UK
Project: Todmorden Onshore Wind farm (20MW 8X2.5MW) Grid Connection
Project: Barlockhart Onshore Wind farm Project(8MW 4X2.05MW)
Project: Middelmoor Onshore Wind farm Project(54MW 18X3MW)
Review of Protection SLD
Review of Protection logic diagrams
Preparation of CT sizing calculations
Review of Equipment Layouts
Review of Cable trench layouts
Preparation of 33kV XLPE Cable rating calculations
Review of 33kV Switchgear Drawings
33kV Protection Design Solker, MFAC34, P341, P122
Review of equipment schedules
Review of 33kV Protection Schematics
Review of 33kV Protection General Arrangement Drawings
Review of 33kV Protection wiring diagrams
110V and 24V DC Battery sizing calculations.
Review of LVAC change over scheme
Review of Protection coordination study
Review of Earthing study report
Review of Transient overvoltage study report
Review of Remote control panel schematics
Review of Cable schedules and core terminations
Review of Protection setting calculations
Testing and commissioning of ALSTOM relays P341,P142
Review of 60MVA Transformer protection schemes
Review of SCADA Drawings
Review of AVC Schematics
Coordination with installation and site commissioning team
Review of interlocking scheme
Review of LAVC drawings
Review of LV cables volt drop calculations
ENTERPRISE PLC, UK Jan 2012- 2013
Role: PRINCIPAL ENGINEER (PROTECTION AND CONTROL)
LOCATION: High Blantyre,SCOTLAND,UK
Reported to : National Engineering Manager
Direct Reports: 4
Indirect Reports: 2
Responsibilities: Took position as Lead Engineer of Mybster 132/33kV AIS Substation Design
Below mentioned works has been carried out independently.
Preparation of DID for Mybster 132/33 kV AIS Substation of Scottish and Southern Energy Project
Preparation of Hazard elimination report
Preparation of Protection &Control Relay schedule
Preparation of 240MVA 132/33kV Transformer protection Schematic diagrams, General arrangement drawings and wiring diagrams
Preparation 132kV Feeders protection Schematic diagrams, General arrangement drawings and wiring diagrams
132kV CVT, CB, Post insulators, Disconnectors Technical bid evaluations.
Preparation of specifications for plant and Protection &Control equipment
Preparation of SLD and Protection SLD
Preparation of Substation Main connections Protection Diagram.
Chairing of monthly Engineering review meetings.
Preparation of Project schedule
Coordination with Client on Protection &Control and Plant issues
MITSUBISHI ELECTRIC EUROPE July 2008-2012
ROLE: PRINCIPAL ENGINEER (PROTECTION AND CONROL)
LOCATION: London, ENGLAND, UK.
Reported to : Deputy General Manager
Direct Reports:4
Indirect reports: 5
RESPONSIBILITIES: SWANSEA 400KV GIS, 275/132KV AIS SUBSTATION DESIGN
preparation of enquiry documents
Preparation of stage by stage specifications/documents/drawings.
Witnessing Protection (NICAP) FAT.
Design of Operational tripping scheme and interface engineering.
Substation control system Interface engineering.
Technical bid evaluations.
Preparation of design documentation including sizing calculations for major electrical equipment, load schedules, supplier’s documentation review.
Interfacing and coordination with other Disciplines.
Approval of drawings, calculations, and specifications where appropriate.
Design Protection scheme modification for 275kV Swansea Existing Substation
Design of Battery and load calculations
132KV Bus bar protection modification drawings preparation
Preparation of Engineering drawings for removal of old Protection panels, control panels, CTs, CVTs for three 132KV bays and four corner 275KV mesh Substation.
Initiation of the production of General Arrangements, Circuit Diagrams and Wiring Diagrams and the final approval of same
Initiation of the modification of existing interface drawings and final approval of same
Specification of protection and control equipment deemed necessary to fulfill the panel design
Specification of ancillary equipment for project, i.e. batteries, LVAC, metering, etc.
AC / DC loading calculations
Trip circuit volt drop calculations
Specification of instrument transformer requirements and light current detail of any plan mechanism, etc.
Initiation of front end cable design taking due account of access for cable routing
Initiation of electrical interlock design and final approval of same
Initiate the preparation of I/O Schedules and control system interfaces
Review subcontractor Risk Assessments and Method Statements
400kV GIS Local control cubicle Design
400kV GIS Substation Protection (NICAP) Design
TOSHIBA CORPORATION T&D, ABUDHABI, UAE Nov 2005-June 2008
ROLE: LEAD ELECTRICAL ENGINEER
Reported to : Site Manager
Direct Reports: 3
Indirect reports: 5
Project: 400KV/132kv substation Fujairah Grid Station, UAE
Location: Fujairah, UAE
HV 400/132kV substation Design, testing and commissioning for the new Fujairah Grid Station, UAE
Design of SIEMENS Fault monitoring system I/O signals for 400kV GIS
Design Review of Protection schemes of 400kV GIS Substation
Design review of Cable schedules for 400kV GIS Substation
Design Protection tripping/inter tripping and control schemes between FWPP1 600MW Gas Power plant and 400kV Fujairah Grid station.
Preparation of weekly/monthly schedule of work.
Generator Protection relays testing in FWPP1
132kV main -1&2” feeders protection relays (GRL100) testing.
Generator transformer CTs testing.
Commissioning of Generator control panels
Commissioning of Transformer control panels
Generator transformer differential protection stability test.
Fault Monitoring system (FMS) commissioning at 400kV/132kV Fujairah Grid station.
DCS Interfacing signals verification.
Generator Synchronizing circuits verification
SCADA operation and interfacing signals verification.
400KV/220KV New Substation ADCO/TRANSCO Power Network M/S TOSHIBA project at Madina Zayed, ABUDHABI in UAE
Design review of cable schedules for 220kV GIS Substation
Testing of D.C change over scheme from old battery to new battery for existing 220kV substation which is in service.
The following relays of M/S TOSHIBA make has tested.
1.GRD110 O/C Protection relay
2.GRZ100 Distance protection relay
3.GRT100 Transformer Protection relay
4.GRL100 Line differential Relay
5.GRR100 Auto reclosure Relay
6.GRD140 Directional O/C Protection relay
7.GRB150 High impedance Differential relay
8.GRD130 Under/Over Voltage protection relay
9.GRB100 Bus bar protection relay.
Successfully carried out Testing and commissioning of 33KV GIS for six Bays.
Testing and commissioning of 220KV, 33KV Remote control panels.
Testing and commissioning of INX5 Bus bar Protection panels of M/S ABB make.
Testing and commissioning of 33KV Tariff metering panels of M/S Landis and Gyr make
Testing and commissioning of OLTC, AVR for 140MVA Transformers.
Testing and commissioning of 220KV/33KV Distance Protection relays.
Testing and Commissioning of FMS (Fault monitoring system) of M/S ABB make.
Testing and commissioning of SER(Sequential Event Recorder) of M/S SEIMENS make
Testing and Commissioning of Auto Synchronizer of M/S ABB make.
Testing and commissioning of M/S TOSHIBA 220KV GIS, 33KV GIS.
Functional checks for Protection panels, end to end test for OHL feeders.
Preparation of cable schedules for Substation/Power station and Designing of Protection and control schemes etc.
Primary Injection tests for CT/PT.
Power transformer Differential stability and REF stability test
Protection scheme checks.
Andhra Pradesh Power Generation Corpn. (APGENCO)
Assistant Divisional Engineer June 1994 – Nov 2005
Reported to : Divisional Engineer
Direct Reports: 3
Indirect Reports: 70
Project : 7X110MW Hydro Electric Power plant (Srisailam Right Bank)
Project : 6X150MW Hydro Electric Power plant (Srisailam left Bank )
Involved in construction phase of Electrical Equipment Such as Generator, Turbine installation and commissioning.
Involved in automation and controls testing and commissioning
Involved Generator and Transformer Protection panels installation, testing and commissioning
Installation and commissioning of Electro hydraulic governor
Installation and commissioning of Firefighting system
Installation and commissioning of SCADA for 220kV Substation
Installation and commissioning of DCS System
CT/VT Primary injection tests
Testing and commissioning of Synchronizing Relay
Generator AVR Testing and commissioning
220V DC Battery installation and commissioning
Supervision of Control cables laying and terminations
150MVA 11kV/220KV Generator Transformer testing and commissioning
220kV Substation Feeder protection(Distance, Differential) Testing and commissioning
CBF/Busbar Protection testing and commissioning
220kV AIS CVT/CT Installation and commissioning
220kV AIS SF6 Circuit Breaker installation and commissioning
Station auxiliaries LVAC panels installation and commissioning
Plant Hydraulic system testing and commissioning
EDUCATION
GITAM College of Engineering, Visakhapatnam 1994
B. E. – Electrical and Electronics Engineering
GMR Polytechnic, Visakhapatnam 1991
Diploma in Electrical and Electronics Engineering
PROFESSIONAL DEVELOPMENT
Completed course on Static Excitation Equipment ay BHEL, Bangalore
Completed course on Advanced Power System Protection at Power System Training Institute, Bangalore
Undergone training on Distance Protection of latest numerical version at ABB factory works, Bangalore.
Completed course on Energy Meters at Secure Meters, Udaipur
Delivered seminars at various power stations on topics such as AVR, Governor, and Protection Relays
Obtained competency certificate from TRANSCO,HSE,Abudhabi,UAE
COMPUTER KNOWLEDGE
Proficient with the use of Windows, MS Office, Micro station, Auto Cad.
STRENGTHS
Hardworking and dedicated with an ability to deliver assignments on time
Keen and quick learner with an ability to imbibe new knowledge with ease
Ability to execute and carry out projects with positive results
Strong leadership, communication and interpersonal skills
PERSONAL DETAILS
Name : Padega Vara Prasad
Date of Birth : 15.06.1972
Nationality : British
Sex : Male
Marital Status: Married
Languages Known: English, Hindi and Telugu
Home Address: 33 The Durdans, Langdon hills, Basildon, SS16 6DA, UK
REFERENCES
Available on request