AKHONA LWAZI MASIZA
***** ******* ******, ** *******, Delft 7100
078-***-****/ 076-***-**** ********@*****.***
PROFILE
A committed and well-motivated young person who aspires to secure a position at a company where he can bring immediate and strategic value and develop his current skills set further. Akhona is a reliable, hardworking person who is eager to expand his skills in any organisation he becomes part of, and he is not shy in making new trends. He takes pride in his ability to work accurately in a fast paced and pressurized environment. He responds timeously to learning new information and adapting to new tasks.
EDUCATION Falsebay College 2018
Electrical engineering level 1-3 practical
Trade test
Durban University of Technology 2012
S3 in Electrical Engineering
College of Cape Town 2006
Electrical Eng certificate (NQF level 5)
Computer college of South Africa 2008
International business computing
Port shepstone international 2007
Grade 12
WORK EXPERIENCE _
Protocor Twenty two (20 Sept 2021-20 Nov 2021) Electrician
•Termination of Motor Control Center Panels and Local Control Panels
•Pulling and Strapping Cables
•Termination of Valves,Sensors
•Termination of flow, level, Pressure and Temperature measurements
•Termination of Level Transmitter, Flow Transmitter
Power plant electrical technologies ( May 2021-Aug 2021) Electrician
•Termination of cables of the backup generator.
•Wiring of Motor Control Center Panels, VT’s and CT’s.
•Wiring of panels and actuators.
•Install lights and wire air conditioners.
M-Telecoms May 2020- Oct 2020 Electrician
• Maintenance on Vodacom towers.
• Replace old lead acid batteries with new lithium batteries.
• Testing of comms cables and battery alarms.
• Camera installations.
• Rectifier swaps.
•Configure the rectifier.
Eskom April 2016 – April 2020 Apprentice
• Maintenance on live lines (220kv- 765kv).
• Replacing broken insulators and vibration dampers.
• Cramp conductors with sleeves.
• Splacing damage conductor.
• Replace spacers on the line.
Siyavuya power project February 2013 – January 2014 Semi skilled Electrician
• Build an 11kv line to supply the houses.
• Connecting the meter to the pole box using Airdac.
• Test meter if it's operating accordingly.
• Administration work and filling.
SKILLS
•Excellent verbal and written communication skills
• Team player
• Prioritising work
• Goal oriented
• Time management
• Flexible
REFERENCES
•Mr I Mailola
Team Leader M-telecoms
•Mr P Van Tonder
Supervisor Eskom
•Mr Carl Nel
Supervisor Power plant electrical technologies
•Mr Marius Cloete
Site Supervisor Protocor Twenty Two