SUMMARY OF EXPOSURE:-
PMP certified Mechanical Engineer with 14 years of GCC experience in Complete Infrastructure works
(Sewerage, Storm, Potable water, Irrigation, Fire hydrant, Electrical, Telecom & NDRC works), Water Transmission Pipeline works, Sewage rising mains, Chilled water network, Electro Mechanical works of Chiller plants, Pumping stations (TSE/Irrigation/Firefighting), Lifting stations, Water & Sewage Treatment plants, including HVAC, Fire protection/ Fire alarm and associated building MEP works etc., and expert in the following areas
Detailed engineering & Shop drawings development
Tender Costing, Proposal preparations, Technical specification Compliance and detailing
Procurement, Project co-ordination & execution, Resource & Project management
Site inspection, Factory Inspection, QA /QC, Approval process and Consultant/ Client handling
Testing & Commissioning, trouble shooting and shutdown management
Operation & maintenance and Facility Management
M/s. RANCO GENERAL CONTRACTING LLC - AJMAN, U.A.E. (From June 2020 to June 2021) Construction Manager for FEWA (Etihad WE) pipeline projects Responsible to Lead and manage the project site execution with client and authority management holding the following key Roles & responsibilities.
• Preparation and management of Shop drawings for the projects
• Technical meeting & correspondences with Client for availing approval on shop drawings,
• Technical assistance in procurement of piping materials and stock management at site
• Suppliers & Sub-contractors management
• Availing approval from Ajman municipality for the Dewatering works, Road crossing works and other NOC from relevant authorities
• Scheduling and management of site daily, weekly and monthly activities
• Project Execution and project management for the complete pipeline works to achieve the schedule
• Management and compliance of site safety requirements
• Management of Site inspection with client and handing over of completed zone to FEWA O&M department
• Management of site progress and report submission to client and management
• Management of progress meeting with client
PROJECTS HANDLED:
Replacement of Distribution network project in Ajman city area (106w2016)– (FEWA)
- Complete pipe laying (160 to 400 Dia HDPE) and house connection works for Potable Water (FEWA) with all Valve Chambers (BFV, GV, AV, WO), Flow meter chambers, Road crossing by Open cut and NDRC, Shutdown, Tie in connections with Existing 600dia DI pipe lines & disconnection of existing AC pipe lines & MOV replacement in Ajman WDC.
DI transmission pipe lines (600Dia) for Al Helio area, Ajman (68w2014)– (FEWA)
- Managed successfully the FTOC of Civil and Mechanical works, PTOC of Electrical and I&C works with FEWA Project/O&M division for the completed pipeline works, all Valve Chambers, FCV chambers, Flow meter chambers & solar powered RTU system to communicate with Al Zorah plant. KEY ACHIEVEMENTS:
Proposed with the client FEWA for changing the construction Type of AV chambers to suit the site condition of high ground water level & implemented at site successfully on approval.
Successfully completed the pipeline works by proposing & implementing alternative solutions to the areas where the project progress struck due to site obstructions/ approval from authority for road crossings etc., and currently the project PTOC works initiated with client FEWA. PROFESSION:
Construction Manager/
Project Manager/
Sr. Project Engineer/
Sr. Mechanical Engineer
EDUCATION:
Bachelor of Science (BS) in
Engineering & Technology
from Birla Institute of
Technology & Science.
(BITS – Pilani), (CGPA: 7.56)
Diploma in Mechanical
engineering (DME) from
DOTE (Tamilnadu - India)
(89.8%)
PMP Certified (2908471)
DOB: 15 July 1980
LANGUAGES KNOWN:
Tamil, English, Hindi,
Malayalam
COMPUTER PROFICIENCY:
Windows 10
MS office, AutoCAD
DRIVING LICENSE #:
UAE : 1427508
Qatar : 280********
PASSPORT # : U 0832705
Valid Till : 15.09.2030
VISA STATUS:
Personal Resident Visa
(Transferrable)
NATIONALITY:
Indian
AVAILABILITY TO JOIN:
Immediate
EXPECTED SALARY:
Negotiable
REFERENCES:
Available on request
RESUME
VADIVEL MURUGAN.T Mobile: 056-*******
Dubai, UAE. +91-971*******
www.linkedin.com/in/muruganv1507 E-mail: ************@*****.*** CV of Vadivel Murugan- 2 of 4
Previous Employment History:
#1. M/s. FLORA BORING EXCAVATING LLC - Dubai, U.A.E. Projects Control Manager in Infrastructure division (From March 2014 to May 2020) Responsible to Lead and manage multiple projects (Tender to successful completion & hand over) SUCCESSFUL TENDERS & PROJECTS HANDLED :
Complete infrastructure works including Potable Water (DEWA), Sewage, Storm water, TSE and Irrigation (DM), Fire Hydrant, Firefighting & LPG network (DCD), Chilled water network, all Valve Chambers, Flow meter chambers, DM
& DEWA metering RTU & SCADA system, Shutdown and Tie in connections etc., for the following major projects with various pipes (uPVC, GRP, HDPE, CARBON STEEL, DI)
2x2500TR Chiller plant & CHW (upto1000dia Carbon steel) network- execution, T&C for Souq warsan project including HVAC and other MEP works of buildings – (Nakheel)
2x250 Dia CHW pipe lines Extension with NDRC works for Aloft Hotel project – (WASL)
Development of emirates Flight academy plots, Dubai. Client: M/s.Dubai South
Includes 2 x 2500T Chiller plant & pumps for Souq Warsan Project, Dubai. Client: M/s.Nakheel
Sharjah Water front city, Includes Sewage lifting station (Sun Island), Client: M/s.Al Hanoo
Night market (Palm Deira) project includes condensate water Lift station Client: M/s.Nakheel
Residential development for Nad al Shiba third. Client: M/s.Nakheel
Green community – Motor city Phase 2 & 3. Client: M/s.National properties LLC
Includes Fire & irrigation Pump station for Dubai City walk development project. Client: M/s.Meraas
Complete infrastructure works of Al Furjan, Warsan villas Client: M/s.Nakheel
Muhaisnah Residential Development Project, Dubai. Client: M/s.Al Wasl Asset management.
GRP & uPVC Drainage pipe network for Golf drainage and Lakes with Penstocks & weir chambers for lake water control – MBR Golf course project, Dubai. Client: M/s.Emaar properties KEY ACHIEVEMENTS:
Key member of management for the core development & success of newly launched infra Division for the company and achieved the promotion from Sr.Engr to Manager in a very short span.
Key member of management on decision making in Vendors & Sub contractors selection and finalisation
Developed & implemented procurement strategy & Stock control of materials at site by implementing internal documentation and material request authorization system in the company
Developed & implemented strategy for shop drawings internal approval system prior to client submission
Successfully handled the conversion of major tenders into projects and managed its execution till hand over
#2. M/s. BELHASA PROJECTS LLC - Dubai, U.A.E.
Sr. Technical Engineer (Electro Mechanical) in Infrastructure division
(From May 2012 to Feb 2014) & (From July 2007 to Nov 2009) MAJOR PROJECTS HANDLED:
2x10 MIG (FEWA project #14W) & 2x4MIG (FEWA project #15W)Pre-stressed & post tensioned RCC water storage tanks projects and its associated DI, GRP & HDPE piping works with Hydraulic study, Stress analysis, major steel structured pipe rack, Valve chambers and Tie in connection works with TRANSCO - RAK & Shouka, Kalba Sharjah- UAE. Client: M/s.FEWA (Federal Electricity & Water Authority)
Water transmission mains of 600 & 800mm dia DI pipeline network (32 & 17 Kms) with various valve chambers
(IV, AV, WO & FM) in Umm al Quwain city (FEWA project #8W) & from Thouban Pumping station to Masafi WDC of FEWA with major NDRC (HDD & Micro tunneling) works (FEWA project # 11W). Client: M/s.FEWA
District cooling chilled water external pipeline network (Carbon steel pre insulated pipe diameter ranges up to 1050mm) with Valve chambers, Vent, drain risers and NDRC (Micro tunneling) works for DIFC Network Extension along Road 312 to Zabeel with Connection to WTC, Duabi, UAE. Client: M/s.Empower CV of Vadivel Murugan- 3 of 4
Positioned as Commissioning Manager and successfully completed the Testing & Commissioning of 6,000 m3/Day STP & sewage Tanker reception facility of Al Baraha STP works for Trucks parking zone 52, Doha, Qatar. Client: M/s.Ashghal
2 x 52 Lps Sewage lifting station with odour control Unit for down town Jebel Ali zone, UAE (as per DM- DIN specification). Client: M/s. Limitless.
2 x 50 Lps Sewage lifting station with screen & odour control unit for Abu Dhabi golf Club Project, UAE (under ADSSC specification) Client: M/s.TDIC
12,000 m3/Day STP – with sewage tanker reception & Pumping facility, extended aeration type with sludge dewatering & foul air odour control unit, Doha – industrial zone 52, State of Qatar. Client: M/s. Barwa Al Baraha – under M/s. ASHGHAL – PWA, State of Qatar
3 x 565 m3/hr Sewage & 1 x 435 m3/hr TSE based irrigation water pumping station and associated pipe works at Al Raha Beach Development Project - Abudhabi, UAE Client: M/s. Al Dar’s Al Raha Beach Resort (under ADSSC)
1,900 m3/Hr Sewage pumping station at Nad al Sheba Race Course, Dubai, UAE. Client: M/s. Meydan LLC
(Under Dubai Municipality)
2 x 280 m3/Hr TSE based irrigation water booster pumping station Projects, Dubai, UAE. Client: M/s.Emaar Properties (Under Dubai Municipality)
2 x 1,500 m3/Day STP (SBR type) and 2 x 220 m3/Hr - TSE Irrigation water pumping stations, at South of Doha city & West Sailiya, Qatar. Client: Barwa Real estate
#3. M/s. Stanley Consultants Inc., Doha, Qatar
Mechanical Inspector – at PS 70, Pumping Mains & associated works for Doha north STP
(From Dec 2009 to Apr 2012)
Roles & Responsibilities:
• Review & approval of material submittals, shop drawings, method statements & FAT reports.
• Technical & progress meetings with contractor, Project management consultant and clients
• Monitoring the contractors for compliance with project specification (QCS - Standards)
• Interacting with Contractor for Quality issues & project execution as per QCS/ Project specs
• Providing technical support, advise & instruction to main contractor for any execution difficulties arise
• Inspection & approvals of materials received at site Pumps, Equipment, pipeline & associated installation
• Witnessing the pressure test of pipes, Load test of lifting equipment, Performance test of pumps & equipment Project Details:
38,000 m3/hr - Sewage Pumping Station (10x1316 Lps Pumps, 2x4 Duty + 2x1 Stand by), Sewage pumping mains (3x1600mm Dia DI pipes for 24 Kms) & its associated works for Doha North STP, Qatar. Client : M/s. Ashghal – PWA, state of Qatar,
#4. M/s. Hydromagx Technology Group, Sharjah, UAE. Project Engineer - in the Water & Wastewater treatment division
(From October 2006 to June 2007)
Responsibilities:
Design & detailed Drawings Preparation, BOQ preparation for entire MEP works, Material purchasing as per the BOQ, Inspecting materials, sub -contractor Finalizing, Project schedule preparing, planning and progressing of the scheduled work, Erection and Commissioning etc. Projects Completed Successfully:
Client: Ministry of Regional Municipalities Environment and Water resources, Oman. Erection & Testing of 2 x 180 m3/Day STP at Al Hamra Near Ibri & Al Jaza Near Sinaw, Oman. CV of Vadivel Murugan- 4 of 4
#5. M/s. VA TECH WABAG Ltd., Chennai, India.
(From March 2005 to Sep 2006)
o O & M - Manager in 62,500 m3/Day capacity semi-automated DCS operated Sewage Treatment Plant - RUIDP, Delawas, Jaipur - Rajasthan, India. From Feb 2006 to Sep 06. o Maintenance Engineer in 4 x 5,000 m3/Day capacity Common Effluent Treatment Plant - Kolkata Leather Complex, Kolkata – west Bengal, India. From Mar 2005 to Jan 06. ROLE HIGHLIGHTS:
• Client management with regular meeting, Correspondences, submitting O&M reports & Periodic invoices etc.,
• Ensuring of smooth trouble free operation of plants & keeping the TSE results within the limit
• Over all operation & maintenance of all equipment like Mechanical Coarse & fine screens, Grit remover, Screw Classifier, Air Blowers, Clarifiers, Agitators, Centrifugal pumps, Screw pumps, Chemical dosing pumps, Digester system, Sludge dewatering Filter press, Centrifuge, Control panel, D.G etc
• Maintaining history for each and every equipment
• Preparing Shift charts, monthly reports inclusion of power consumption & chemical consumption, Operation cost report, Preventive maintenance schedules, Preventive and breakdown maintenance reports and maintenance forecast reports.
• Purchasing of Spares and lubricants, Stock monitoring of chemicals, lubricants & spares and taking care for an optimum usage of the same.
#6. M/s. VISION ENGINEERING Pvt. Ltd, (Associate of M/s.Thermax India - Pune.) Chennai, India. (From Oct 1998 to Feb 2005)
o Senior Engineer - Sales and Service in Water and Wastewater Treatment division looking after Sales, Erection & Commissioning, Revamping and Servicing of RO plant, DM plant, Softeners and All type of Filters and Sewage Treatment Plants, etc. from Feb 2004 to Feb 2005. o Operation & Maintenance in-charge looking after IBR Boilers, Cooling Towers, Effluent Treatment Plant, Water Treatment Plant with DM plant and Utility Compressor House at Tamilnadu Petro products Ltd.(TPL), Manali, India – July 2003 to Jan 2004.
o Operation & Maintenance in-charge looking after non IBR Boilers, Cooling Tower, Sewage Treatment Plant, Water Treatment Plant with RO plant, Fire fighting system and Swimming Pool at The Trident (group of EIH hotels), Meenambakkam, India - Oct 2001 to June 2003. o Engineer - Services in the water treatment division looking after erection & Commissioning, revamping and servicing of RO Plant, DM Plant, Softeners, Activated carbon filters, Sand Filters, multi grade filter & iron removal filter - from Oct 1998 to Sep 2001.
DECLARATION:
Here by I declare that the information furnished above is true to best of my knowledge and belief. Place :
Date : VADIVEL MURUGAN.T