Post Job Free

Resume

Sign in

Electrical engineer

Location:
Panruti, Tamil Nadu, India
Salary:
30000 to 40000
Posted:
November 13, 2021

Contact this candidate

Resume:

A.MURALIDHARAN

E mail: adpche@r.postjobfree.com Mobile: +91-950*******

Objective:

With the experience in the field of Testing and Commissioning of power system products, I look forward for an opportunity to display my skills in the field of Maintenance Engineering, Maintenance and Execution of projects related to power systems.

Professional Qualification:

Diploma of Engineering in Electrical &Electronics (June’2001 toApr’2004) Institute :Adhiparasakthi Polytechnic College, Melmaruvathur Tamilnadu, India.

Career Profile:

Present Exp : 1 Years 08Months

Organization :INDORAMA FERTILIZER LIMITED, Nigeria. Designation : Electrical Project Inspector

Period : Nov 2019 to Jul 2021

Previous Exp : 1 Years 08 Months

Organization :GLOBE KEY POWER EXPERTISE, Oman.

Designation : Electrical Project Engineer (ORPIC – Salalah) Period : Feb 2018 to SEP 2019

Previous Exp : 7Years 04Months

Organization : GK POWER EXPERTISE PVT LTD, India

Designation : Sr Testing & Commissioning andO&M Engineer Period : Sep2010 to Jan 2018.

Previous Exp. : 1 Years 03 Months

Organization : SHRI VAARI ELECTRICALS PVT LTD.,

Designation : Sr. Engineer Operation and Maintenance Period : May 2009 to Aug 2010

Previous Exp : 1 Years 07 Months

Organization : MADRAS CEMENTS, Virudunagar.

Designation :Sr. Engineer Operation and Maintenance Period : Sep 2007 t0 Apr 2009

Total Experience :13.08 Years

Field : Testing and Commissioning / Operation and

Maintenance of Electrical Systems / Electrical

Project Engineer.

Nature of Work:

Testing and Commissioning Engineer and Coordinator in the area of Electrical engineering Implementation, Deployment & Support.

Experienced in working as SPC ‘Single Point Contact’ between client, In- house team, project team, Site Engineer & Vendors to ensure delivery as per client Requirement and schedule.

Provided Full Technical support & Assistance for system operation and maintenance to ensure and complete client deliverables within schedule.

Testing and Commissioning of Switchyard &Switchgear equipment & protection relay.

Preparing & Co-ordinate Schedule for Cable laying and Termination work.

Preparing & checking of operation interlocks for C.B and isolator.

Various schemes checking for complete substation, trouble shooting.

Over all Substation Automation system co-ordination.

Preparing of pre-commissioning check list and as built drawing for the entire substation and get approval from customer.

Co-ordination and Commissioning of all Type of Motorized

Control, Motorized Valve and Pump motor.

Coordination with Consultant for the planning of Electrical

Systems, Utilities and machineries.

Coordination with Consultant for the tendering and finalization of the contracts for Electrical System.

Supervise and manage vendor engineering and equipment’s deliverable to ensure compliance with project standards and specifications.

Reviewing and reporting of the project status.

Execution of the project engineering involving Installation, commissioning & testing of electrical equipment’s.

Troubleshoots plant electrical problems to determine their cause and recommends options for eliminating such problems. Includes carrying out tests on equipment.

Capable of guiding/leading the electrical maintenance team and implementing the best maintenance strategy for the plant including High voltage systems.

Condition Monitoring and Predictive maintenance of critical equipment and corrective actions to avoid breakdown.

Planning for resources and manpower for planned shutdown of the plant and execution including start-up.

Daily Power monitoring, calculations and reporting at monthly basis.

Material procurement through SAP and maintaining minimum spares for attending breakdown and reducing breakdown time.

Awareness on Hazardous area classifications and selection of electrical equipment.

Coordination with various departments for smooth functioning of the equipment by feedback and suggestions from them.

ISO documentation, Quality Circle formation for detecting problems and solving from shop floor employees.

Conducting Safety audits within the department and ensuring the compliance from all the employees and updating the checklists and audit reports.

Imparting training to operation person

Regarding energizing method for isolation & de-isolation sequence.

Preventive measures during emergency condition.

Range of Power Equipment Handled:

Power Transformer up to 3 phase 500MVA and single phase Transformer up to 417 MVA with OLTC.

C.B,C.T, C.V.T, P.T, Isolator, Lighting Arrester for all Voltage level up to 765KV.

Various Protection Relays of ABB /Areva /Schneider/ Siemens/ L&T.

Control, Relay, Synchronization, Annunciation and Monitoring Panel for over all substations of various systems.

Scheme checking for Switchyard Single & Double bus, One & Half bus and T.B.C Scheme Switchgear Normal Changeover, Auto Changeover.

High Voltage switchyard panel equipment up to 400 KV.

Medium Voltage Switch gear panel (33kV GIS, 11kV, 6.6KV).

Low Voltage (440 Volt) distribution panel with change over scheme.

D.C Distribution Board (24V, 48V, 110V, 220V).

Battery Charger and Battery (24V, 48V, 110V, 220V).

Earthing System of Substation.

Project Handled

M/s UPRVUNL 2*500MW (AIS 765/400KV S/S Operation and Maintenance)

RESPONSIBILITY:

Responsible for maintaining and repairing heavy equipment required in the day to day working

Analysis of machine failures

Estimation of maintenance costs

Assessing the needs of equipment replacements, spare parts

Assessment of the required tools for the maintenance of the equipment

Adopt and implement a detailed maintenance plan to minimize failures resulting in stoppage of work

Recruit and train the maintenance staff

Keep updated with the upcoming versions or latest machinery required in the organization

Replacing the spare parts of the machines as and when required

Responsible for performing routine maintenance

Prepare PM Schedule for equipment’s daily, weekly, monthly and yearly basis

Ensure safety requirement for equipment’s and manpower’s

Responsible for maintaining an inventory for the requirement of the supplies and spare parts

SF6 Breaker 400kV and 800kV GL316, GL318 & GL318D Box erection and complete commissioning activities done. Project Handled

Project Completed:

Role Act As

Sr Engineer Operation and Maintenance (SAS)

GE T&DIndia Ltd. (Period May 2015 to Sep 2017)

Project Handled

M/s UPRVUNL 2*500MW (AIS 765/400KV S/S Operation and Maintenance) RESPONSIBILITY:

Responsible for maintaining and repairing heavy equipment required in the day to day working

Analysis of machine failures

Estimation of maintenance costs

Assessing the needs of equipment replacements, spare parts

Assessment of the required tools for the maintenance of the equipment

Adopt and implement a detailed maintenance plan to minimize failures resulting in stoppage of work

Recruit and train the maintenance staff

Keep updated with the upcoming versions or latest machinery required in the organization

Replacing the spare parts of the machines as and when required

Responsible for performing routine maintenance

Prepare PM Schedule for equipment’s daily, weekly, monthly and yearly basis

Ensure safety requirement for equipment’s and manpower’s

Responsible for maintaining an inventory for the requirement of the supplies and spare parts

SF6 Breaker 400kV and 800kV GL316, GL318 & GL318D Box erection and complete commissioning activities done. Role Act As

Senior Testing Commissioning Engineer –

GK Power Expertise Pvt Ltd

(Period Sep 2012 to Nov 2014)

Project Handled

M/s

ONGC(HT&LTpanelsTesting &

Commissioning)

URAN (NaviMumbai)

RESPONSIBILITY:

Coordination with Consultant for the planning of Electrical Systems, Utilities and machineries.

Coordination with Consultant for the tendering and finalization of the contracts for Electrical System.

Supervise and manage vendor engineering and equipment’s deliverable to ensure compliance with project standards and specifications.

Reviewing and reporting of the project status.

Execution of the project engineering involving

Installation, commissioning & testing of electrical equipment’s.

HT switchgears consist of VCB breakers, PMCC/MCC, HT/LT Motors with HT cable

400kV/24kV Power Transformers, 6/0.38 kV /Distribution Transformers.

UPS, Battery charger, UMPS, VFD with battery bank.

Protection system include Microprocessor based relay, Numerical relay.

Role Act As

Senior Testing and Commissioning Engineer

(Period Sep2010 to Aug 2012)

Projects Handled

M/s Adhani Power Plant 2*660 for 400 kV SS in Kawai

(Rajasthan) 2010-2011

M/s KJS Cements Ltd power plant (Madhya Pradesh) 2011-2012

M/s PGCIL for 400 KV SS in Thiruvalam( Tamilnadu )

M/s Madras Sugars for 220KV SS and HT & LT Panel Commissioning ( Tamilnadu )

M/s IMFA for HT and LT Panel Testing and Commissioning (Orissa)

M/s RRVPNL for 400 kV SS in Merta City (Rajasthan)

M/s RRVPNL for 400 kV SS in Jodhpur (Rajasthan)

M/s Reliance Project (H.V&L.V switchgear) Gujarat.

M/s Vedanta Alumina Ltd (H.V&L.V switchgear) Orissa.

238.5 MW M/s IOCL Naptha Cracker Project CPP, PANIPAT

(Power plant and switchgear).

M/s Star Panel Boards Ltd (HV Switch Gears and 66Kv Switch yard) Malur DT, Karnataka.

M/s BSES for 110KV SS Testing and Commissioning ( Delhi )

M/s B.K.Saini Engineer Power Projects P Ltd,Pathankot-H.P Testing and Commissioning of 2*750KW HEP

Role Act As

Sr. Engineer Operation and Maintenance –

Madras Cements, Virudunagar.

(Period Sep 2007 to Apr 2009)

Project Handled

HT & LT Switchgear Operation and Maintenance

Role Act As

Electrical Engineer Operation and Maintenance –

Shri Vaari Electricals Pvt. Ltd.

(Period May2009 to Aug 2010)

Project Handled

M/s Manali Petrochemical CPP 4MW (11KV S/S Operation and Maintenance)

M/s Chennai Airport HT & LT Switchgear Operation

and Maintenance

RESPONSIBILITY:

Responsible for maintaining and repairing heavy

equipment required in the day to day working

Analysis of machine failures

Estimation of maintenance costs

Assessing the needs of equipment replacements,

spare parts

Assessment of the required tools for the

maintenance of the equipment

Adopt and implement a detailed maintenance

plan to minimize failures resulting in stoppage of work

Replacing the spare parts of the machines as and when required

Responsible for performing routine maintenance

Prepare PM Schedule for equipment’s daily,

weekly, monthly and yearly basis

Ensure safety requirement for equipment’s and

manpower’s

Responsible for maintaining an inventory for the requirement of the supplies and spare parts

VCB Breaker 11kV and 800kV Operation &

Maintenance activities done.

Personal Details:

Name : A.MURALIDHARAN

Date of Birth : 28/09/1984

Nationality : Indian

Religion : Hindu

Sex : Male

Marital Status : Married

Blood Group : ‘O’ Positive

Language Known : English, Hindi and Tamil

Mobile : 950*******

Current Location : India

Permanent Address : 28/103, GST ROAD, SBI BACK SIDE MADURANTHAKAM,

KANCHEEPURAM,(DST) TAMIL

NADU,INDIA-603306

I declare that the details furnished in this resume are true to the best of my knowledge

Place : Yours truly

Date:

A.MURALIDHARAN



Contact this candidate