Post Job Free
Sign in

Power Plant Co Ltd

Location:
Dharmapuri, Tamil Nadu, India
Salary:
1.5 lac BD
Posted:
November 15, 2021

Contact this candidate

Resume:

December **** - Still date

April **** - November 2018

November 2010 - April 2016

KAMALAHASAN.K

***************@*****.***

978-***-****

*/****, ***************, ***********,

Pennagaram, Dharmapuri, Tamilnadu, India.

OBJECTIVE

Want to involve myself in a challenging environment offering scope for growth & development and an opportunity to apply my learning to effectively contribute towards the achievement of the organizational Objective .

EDUCATION

Post Diploma In Thermal Power Plant Engineering (Regular)-1st Class-2010 National Power Training Institute, Neyveli Minister Of Power Govt.Of India Diploma In Electrical & Electronics Engineering(Regular) -1st Class- 2009 S.M.Arumugam Polytechnic College, Dharmapuri, Department Of Technical Education, Tamilnadu EXPERIENCE

SITE : BIBIYANA III GAS BASED POWER PLANT, BANGALADESH 400 MW Designation : DCS/ Control Room - Commissioning/Operation Contractor:Navsar Engineering International Pvt.Ltd(L&T Power India) SITE : INDUSTRIE CHIMIQUE DU SENEGAL,WEST AFRICA

Designation : DCS/ Control Room -Commissioning/ Operation Contractor:Enmas O&M Services Ltd,Chennai

SITE:VALUTHUR GAS TURBINE POWER STATION,TAMILNADU,INDIA 190MW Designation : DCS/ Control Room - Operation

Contractor : Sarweshwaran Enterprises Ltd, Tamilnadu, India PROJECT

BIBIYANA III 400MW COMBINE CYCLE POWER PLANT, BANGLADESH GASTURBINE:Make Mitshubishi Hitachi Power System,Model M701F,Capacity 285.06 MW, Speed 3000 rpm, Lube oil & control oil system, Closed & auxilliary cooling water sysytem, Plate heat exchanger. GT generator - seal oil sytem, Hydrogen cooling systems.GBC make Man Diesel turbo,Germany-based.

HRSG : One Natural circulation horizontal type from CMI Belgium, Unfired water tube boiler, auxilliary equipments BFP, LLP circuit cum Deaerator, Manitaining of drum level operations. STEAM TURBINE : Model Fk H130/6.3-50-AX, Make FUJI Electronics, Japan. Capacity 133.25MW,Speed 3000rpm.Lube oil,control oil sysytem,CT fans,Condenser,Cooling tower fans & cooling water pumps,Vacuum pump.Dcs ABB symphony plus INDUSTRIE CHIMQUES DU SENEGAL 20 MW, SENEGAL, AFRICA STEAM TURBINE: 20 MW Make HTC, Water cooled condense, Lube oil system, MOP, AOP, EOP, OVEF, Gland sealing system, GSVC, Ejector, Main & Auxiliary cooling water pumps, Deaeration system, LP extraction (Bleeds).

BOILER MAKE: Wuxi Guolian Hauguang Power Engineering Co Ltd Capacity 150 TPH VALUTHUR GAS TURBINE POWER STATION 190 MW, TAMILNADU, INDIA GAS TURBINE : GE 6FA DLNII Combined Cycle Power plant having Starting motor,Emergency lube oil pump,Hydraulic supply pump,lube oil Mist separator,Operation through GE SPEED TRONIC Mark V Auxiliaries,Software,Gas Turbine controls,Gas booster compressor operation. HRSG:Natural circulation,triple pressure,Horizontal,Unfired water tube,HRSG and Auxiliary equipment,BFP,Condensate system, Deaerator, Maintaining of from level operation.

STEAM TURBINE:Make BHEL,HNK712.8/4 having 3000RPM Steam turbine and Lube oil systems MOP,EOP,JOP,Gland sealing system and air cooled condenser, Closed cooling water system and Air cooled heat exchanger system, Vacuum wystem, HP, IP

& LP Bypass control valve system operation. Steam turbine is controlled with Pro Control 33 ABB DCS

TECHNICAL SKILLS

Experience in Commissioning and operation of Gas Turbine,Boiler,SteamTurbine,Generatorand all its auxiliaries. Experience in hydrotest,alkali boil out,steam blowing,sefty valve settings. Having complete knowledge in the logic and principles,behind the operation and troubleshooting of GasTurbine,Boiler,HRSG, Steam Turbine andGenerator. Executing cost saving and energy saving techniques/ measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget. Cold, Hot & Warm start up, Normal Operation, Emergency Handling and Safe shut down of Unit. Line up of the unit and its auxiliaries,Change over of equipment,routine testing of protection system,valve freedom testand annunciation system.

Supervising the functions of trouble shooting & predictive/preventive/shutdown maintenance for identifying are as of obstruction/breakdowns.

Maintenance of power plant auxiliaries like Boiler feed pumps,Condensate extraction pumps,Oil Centrifuges,Centrifugal fans, Cooling Tower Fans, Cooling Water pumpsetc. BOP equipment’s like ATLAS COPCO make Centrifugal Gas compressors,Chillers,Boiler feed water pumps and Atlas Copco make Air compressors and N2 Generator. Reducing machinery down time to minimum Emergency Equipment Trial and restoration of process.

SAFETY SKILLS

Issue and cancellation PTW system, safe isolation, Personnel safety and equipment safety. Strictly follow permitte work(PTW),Job safety analysis(JSA)procedure,Lock out tag Out(LOTO).

Knowledge about all types of personal protective equipment(PPE)and their usage. PERSONAL PROFILE

Father's Name. :Mr.Krishnan

Date of Birth :15/04/1989

Marital Status :Unmarried

Nationality :Indian

Passport No : K723090

Gender :Male

DECLARATION

I hereby declare that all the information given in this form is true to the best of my knowledge



Contact this candidate