Resume of
Marlan Govender
Personal details:
First name: Marlan
Surname: Govender
Identity number: 860-***-**** 083
Marriage status: Married
Nationality: South African
Languages: English and Afrikaans
Health: Excellent
Drivers licence: code 8 and advanced driving skills (defensive and evasive handling techniques)
Interests: The planning, building, installation and testing of high-performance race engines. And travelling to different counties and learning about different cultures and the local foods.
Criminal record: None
Contact details: Cell number 072******* cell
071******* alt
****************@*****.***
Address: 8 Browning Street, Vanderbijlpark, Gauteng,1911
Objective: Looking to expand and grow my work experience in a company which will challenge and help me grow mentally and financially.
Skills & abilities: Able to work well under pressure and with a deadline. I have successfully completed many projects even when running simultaneously. I do not require constant supervision as I work well as a team leader or by my own and can drive a team to achieving any goal set out for us. I have extensive experience in the development and implementation of hse systems, and site control and management including experience in investigating and reporting to the workman’s compensation fund and now also with RMA
Statement : over the years working with the number of people that I have been exposed to in the different sites and fields I have learnt a lot, and have used that and put that into my management qualities, and I am proud to say that I have never missed a deadline or had any fatalities or loss of limbs on any of the projects that I have run, I can truly say that I am an asset to any company that I have the opportunity to work for.
Education:
School: Belverton secondary (Tongaat, kzn)
Matric 2004
Subjects: English
Afrikaans
Mathematics
Biology
geography
metalwork
Tertiary Education:
1)I T E working skills (2003)
Concentration, motivation, goal setting memorization and recall, visualization and association, efficient thinking, problem solving team building and team leading
2)Ethekweni trade school (kzn) (2004)
N1, N2, N3 platters and fitter’s theory
3)Irca global (2006)
Health and safety representative’s course
Modules: legal aspects, general duties of employer and employees, rights and role of representatives, health, and safety meetings, causes and effects of accidents and incidents, accident and incident investigation, task observation, effective communication, risk assessments, emergency preparedness.
4)World best practice risk management systems (2007)
Safety management course (samtrac)
Modules: risk management, health and safety theory’s, principal sheq systems, legal legislation, technical safety, occupational health, environmental health, implementation and management of sheq systems
5)E T S, Emergency training solutions
First aid level 1
Basic fire fighting and handling of equipment
6)TWI CSWIP 3.0 2019
Level 1 visual welding inspection
7)Currently completing my NEBOSH international examination thru NOSA and currently busy with registration with SACPCMP
8)Cswip level 2 in progress
Work experience:
1)Multi serve engineering
Position held: apprentice boilermaker (February 2005 to December 2005)
Operation of the bore mill, band saw, lathe, pedestal drill, bending machine, and plate roller
Reason for leaving: Relocation to Gauteng
Contact reference: C Naidoo (director)
2)Grinaker lta meip: Sasol 3 secunda, octeen 3 (2006 March to March 2007)
Position held: junior safety officer
Was in charge of the pipe rack section of the plant for the duration on my contract
Reason for leaving: project complete
Contact reference: M Pillay (site superintendent)
V Govender (welding engineer)
3)Grinaker lta meip: Sasol 1 sasolburg,A.A.A plant (April 2007 to June 2007)
Position held: safety officer
Was assigned to the piping division for the duration of the project, and was in charge of all health safety and environmental aspects and compliance to Sasol spec and rules
Reason for leaving: project complete
Contact reference: M Pillay (site superintendent)
V Govender (welding engineer)
4)Grinaker lta: Anglo platinum Polokwane smelters (July 2007 to August 2007)
Position held: safety officer
Was in charge of the night shift team and all the health and safety compliance
Reason for leaving: end of project
Contact reference: P Pillay (site superintendent)
V Govender (welding engineer)
5)Nessa engineering projects (pty) ltd (September 2007 to December 2008)
Position held: senior site and workshop safety officer
Was in charge of implementing and enforcing a working and developing health safety and environmental system at the workshop and at the different sites.
Sites included: Highveld Steel and Vanadium, Assmang Chrome, Iskor, Mittal Steel,Assmang Ferrochrome,Extratta Steel,Mogale Alloys,Nessa worshops 1 and 2
Reason for leaving: end of contract
Contact reference: A J G De Agrela (director)
6)Grinaker lta meip: Caltex Shevron,January expansion shutdown,Cape Town
(January 2009 to March 2009)
Position held: safety manager
Controlled and enforced the health safety and environmental requirements on the site
Reason for leaving: shutdown complete
Contact reference: P Pillay (site superintendent)
V Govender (welding engineer)
7)Grinaker lta meip: Sasol Temane expansion shutdown, Temane Mozambique
(April 2009 to June 2009)
Position held: safety manager and site co-ordinator
Controlled and enforced the health safety and environmental requirements on the site and co ordinated the shifts allocated to the areas
Reason for leaving: shutdown complete
Contact reference: P Pillay (site superintendent)
V Govender (welding engineer)
8)Grinaker lta meip: Necsa Uranium Power Plant, Pellindaba (July 2009 to December 2009)
Position held: safety manager and site operations co-ordinator
Controlled and enforced the health safety and environmental requirements on the site and co-ordinated the shifts and man power allocated to the areas and had to report to the head office with progress reports and time cards.
Reason for leaving: project complete
Contact reference: P Pillay (site superintendent)
V Govender (welding engineer)
M K Gramani (qc engineer)
9)Grinaker lta meip: Sasol Meerkat Project, Sasolburg (January 2010 to February 2010)
Position held: Safety manager
Controlled and enforced the health safety and environmental requirements on the site
Reason for leaving: shutdown complete
V Govender (welding engineer)
M K Gramani (qc engineer)
10)Nessa Engineering Projects (pty) ltd (march 2010 to october 2019)
Position held : HSE manager
Reason for leaving : retrenched end October 2019
Develop maintain and enforce an evolving health safety and environmental management system for the workshops and the sites,all reporting and investigations of accidents to workmans comp and now currently with RMA
Sites include:Kusile power station,air liquide,Medupi power station,assmang chome,assmang ferrochrome,evraz steel,cape gate,mittal steel,sasol,petra diamonds,just to name a few
Contact reference: A J G De Agrela (director)
11)Stefanutti stocks oil and gas: Elandsfontein fabrication shop (November 2019 to end December 2019)
Position held: welding co-ordinator
Receiving and verifying of all welding consumables, hot boxes, baking ovens, holding ovens, clamp meters, tong testers and thermometers. Verification of isometric mark-up with weld positions, capturing of the necessary data on the weld control system. Issuing of work packs to the supervisors, dimensional/fit-up inspection pre and post welding. Witnessing of welder performance qualification tests
Contact reference: V Govender (welding engineer)
12)Temi Mechanical and Electrical : Sulphur Degassing Project Sasol (July 2020 till present, limited time contract December 2020)
Position held: Safety officer
Level 1 Q.C
Receiving and verifying of all welding consumables, hot boxes, baking ovens, holding ovens, clamp meters, tong testers and thermometers. Verification of isometric mark-up with weld positions, capturing of the necessary data on the weld control system. Issuing of work packs to the supervisors, dimensional/fit-up inspection pre- and post-welding. Witnessing of welder performance qualification tests
Witnessing of hydro testing/pressure testing and flushing of lines. Compiling of relevant data packs and ensuring accuracy and traceability. Allocating, reviewing and co ordinating ndt requests and results.
Contact reference: M K Gramani (Q.C Manager)
J Fernandes (Construction Manager)
13)KSR Project Consultants and trading specialists (March 2021 to present,limited time contract)
Position held: QA/QC and Safety Officer
Review update and compilation of iso 3834 procedures,and application for certification
Review and inspect material according to AFC drawings and relevant codes and standards
Review welders and ensure their qualifications are updated
Review welding consumable certification
Ensure all fabrication is carried out according to relevant AFC drawings and codes
Carry out visual inspection prior and post welding
Co-ordinate with NDE technicians for the relevant testing
Review of NDT reports
Compilation of data dossiers
Endure weld defects are recorded and repaired in a timely manner
Liaise with client’s inspectors and third party inspectors for signing off of QCP intervention points.
Material and consumable traceability inspections
Internal safety and quality inspections and monthly audits
Completed projects for KSR:
Temi Mechanical and Electrical
Water Filers, Barrick Lumwana uranium plant
Contact reference: M K Gramani (Q.C Manager)
MEI Construction and Services
1479E1 Tharisa Minerals Vulcan Plant
Michael Premanathan (Client QC)