Post Job Free

Resume

Sign in

Saudi Aramco Engineer Civil

Location:
Al Masfalah, Makkah, Saudi Arabia
Posted:
February 20, 2022

Contact this candidate

Resume:

Mohammad Masood Ali

MOBILE-++966*********

E-MAIL : adp97a@r.postjobfree.com

12.16.2021

KSA

Dear Sir,

I am eager to show my best performance, where my abilities and qualifications can be fully applied to our mutual benefit. My resume is enclosed for your review and consideration.

The enclosed resume will provide you with further on contributions that I have made to my current and previous employers. I will be happy to use my creativity and energy. I am accustomed to a fast-paced environment where deadlines are a priority and handling multiple jobs simultaneously is a requirement. I enjoy a challenge and work hard to attain my goals. Constant communication with all levels of management has strengthened my interpersonal skills. I believe that my organizational skills and my outgoing personality will enable me to contribute to achieve high standards that you must have set for your works. I am confident I can provide many valuable contributions to your company.

My Character, personality, and the ability to work in a team environment can be evidenced as we work together. I am certain that I can be a contributing member of your company.

Thank you for your time and consideration.

Sincerely,

Mohammad Masood Ali

PERSONAL

Date of Birth:

17thFeb1983

Nationality:

Indian

Marital Status:

Married

Passport number:

T9284627

Expiry: 17/08/2030

Driving License:

Saudi Arabia

India

SEMINAR ATTENDED

Negotiation technique

Health, Safety & Environment (HSE)

Emergency Safety (First Aid Training)

Scaffolding Safety

Team Management

PMP PMI Modules

Building Finishing Work

SKILLS&STRENGTHS

Excellent Communication Skills in

English

Arabic

Urdu

Marathi

Hindi

Efficient Management and Leadership ability.

Expertise with latest tools and techniques.

Extensive knowledge of Codes and Design.

Effective quality checking of final deliveries.

Excellent Time Management to finish the work scheduled on time.

Ability to interact with various levels of management.

INTEREST

Career Counseling

Teamwork, Public Speaking & Socializing.

Playing Cricket.

Travelling

PROFESSIONAL PROFILE

I am an enthusiastic, results-driven and Professional Civil Engineer with 16+ years of experience in managing all aspects of engineering construction projects with Royal commission, Saudi Aramco, Sabic and Sadara. Experience in execution of Airports, Building & Infra structure development, Water supply, Sewerage networks and Storm Water Drainage System, Water supply and underground electrical pipe. Involved in the construction wall lining,CABC,CTBC, Apron PCC, Runway Asphalt laying, testing, and commissioning of Pipelines of different types of Pipes like (CS, SS, M.S, R.C.C, GRP, UPVC, FRP, DI, GI, and VC Pipe etc.) and liquid-retaining structures and Pump stations RCC Valve Chambers, RCC Manholes Culverts and concrete protection works. and hands-on experience in construction & supervisions of commercial and Residential Buildings high rise building above 10 story, Oil and Gas, I am enjoys being part of, as well as leading, a successful and productive team. I am quick to grasp new ideas and concepts, and to develop innovative and creative solutions to problems. I can work well on my own initiative and can demonstrate the high levels of motivation required to meet the tightest of deadlines. Even under significant pressure, I possess a strong ability to perform effectively.

KEY TECHNICAL SKILLS

Excellent written and verbal communication skills along with the strong interpersonal skills.

Rich experience in Construction & supervision of Airport, oil & Gas field Brown field as well as green field projects with Sabic & Saudi Aramco Projects like Oil & Gas well head and well pad construction with fence and Flow line.

construction laying, testing, and commissioning of Pipelines of different types of Pipes like (CS, SS, M.S, R.C.C, GRP, UPVC, FRP, DI, GI and VC Pipe etc.) and liquid-retaining structures and Pump stations RCC Valve Chambers, RCC Manholes, Culverts and concrete protection works.

Having good experience in all Buildings finishing work, Passionate to work in Building’s all finishing work

Enthusiastic, self-motivated and self-starter. Proficient in management and organizing the things. Ability to interact with various levels of management

Worked in different type of projects Buildings, Oil and Gas, Sewerage networks, Water supply & Earth works. Best understanding of Drawings.

Prepare As-Built quantity, Material take-off and Cost Estimate.

Preparation of payment Certificates for Sub-Contractors.

Supervision of Architectural, Structural and all Civil Works. Quality Control works. Co-ordinates with Sub-Contractors.

Commitment to exceptional services

Codes and Standards (working knowledge)

ACI 318, ASTM, Saudi building codes, IS codes, BS standards

AWWA C950-01 - Fiberglass Pressure Pipe

AWWA D120-84 (R89) - Thermosetting Fiberglass-Reinforced Plastic Tanks

AWWA F101-02 - Contact-Molded, Fiberglass-Reinforced Plastic Wash Water Troughs and Launders

AWWA F102-02 - Matched-Die-Molded, Fiberglass-Reinforced Plastic Weir Plates, Scum Baffles, and Mounting Brackets

BS 6464 - Specification for reinforced plastics pipes, fittings, and joints for process plants

API 15LR Specification for Reinforced Thermosetting Resin pipe

ASME/ANSI B16.5 Pipe Flanges and Flanged Fittings

ANSI B31.3 Chemical Plant and Petroleum Refinery Piping

ANSI/AWWA C90 Standard for Thermosetting Resin Pressure Pipe

AWWA C950 Standard for Fiberglass Pressure Pipe

EDUCATION(ACADEMIC)

BE bachelor’s in civil engineering from MIT college of Engineering Abad (M.S) India with first class.

Diploma in Civil Engineering from Government Polytechnic Nanded MS India with first class.

COMPUTER SKILLS

I have a good understanding and working experience on the following software’s

Auto Cad, Revit, MS project, Primavera P6, Microsoft office etc.

WORK HISTORY

AECOM

Aug 2020 to Present

Position: Sr Engineer Civil.

Project: TRSDC International Airport Project (Airside)

Working with AECOM As Sr Engineer Civil, provided management support for inspection and Title II services. The project scope was to oversee the construction of The Red sea Airport in Umluj Tabuk region in the Kingdom of Saudi Arabia. His responsibilities on the project are listed below:

Provides technical direction and guidance to subordinate Engineers & inspectors, enforces company and project policies, maintains close client interface, and ensures all facets of the project are constructed in accordance with design, budget and schedule through subordinate.

Raise technical query (TQ) mutually raised by contractor to engineering Department.

Issue observation, NCR for non-conformance report for work against specification and drawing.

Review and approval of FCD (field change document) for the contractor.

Review and approval of project design drawing and shop drawing.

Conduct inspection and monitoring the day-to-day project progress of the infrastructure and underground utility within the project scope.

Review and Approved the method statement submit by the contractor.

Monitor project progress to ensure conformity with approved schedule, engineering/ project standards, specifications & designs.

Ensured the safety tools and observed and ensured the high standards of safety and health.

Review and approve the traffic management plan for the temporary access on the project.

Manage, coordinate, performed direct supervision of construction activities and expedite through subordinate professional staff delivery and implementation of assigned tasks within schedule and contract limitations while ensuring satisfaction of Project/ Quality Manager.

Prepared logs sheets for running quantities and balanced quantities and report RE and ARE on daily basis and to prepare forecast for completion of project.

Contractors’ equipment’s inspection on weekly basis to ensure safe to work on site.

Daily and weekly update of project progress monitored by reports and charts and using project drawing.

BECHTEL (Royal commission Jubail) SAUDI ARABIA

Jan 2018 to July 2020

Position: Sr Field Engineer Civil

Project: (1) Site Preparation of Al-Reggah Sector C1 & C2.

(2) Jubail Navy Airport Project.

Working with Bechtel as Royal commission representative on extension Jubail navy airport & Jubail industrial area on site preparation project pre-development of infra structure and housing. Around 7.0 million of backfilling and 4.0 million cutting.

Review the Shop drawing, Method statements and ITPs.

Raise technical query (TQ) mutually raised by contractor to engineering.

Issue QAN, Can, NCR for non-conformance report for work against specification and drawing.

Review and approval of FCD (field change document) for the contractor.

Review and approval of project design drawing and shop drawing.

Conduct inspection and monitoring the day-to-day project progress of the infrastructure and underground utility within the project scope.

Review and Approved the method statement submit by the contractor.

Monitor project progress to ensure conformity with approved schedule, engineering/ project standards, specifications & designs.

Ensured the safety tools and observed and ensured the high standards of safety and health.

Review and approve the traffic management plan for the temporary access on the project.

Manage, coordinate, performed direct supervision of construction activities and expedite through subordinate professional staff delivery and implementation of assigned tasks within schedule and contract limitations while ensuring satisfaction of Project/ Quality Manager.

Prepared logs sheets for running quantities and balanced quantities and report RE and ARE on daily basis and to prepare forecast for completion of project.

Contractors’ equipment’s and trailers inspection on weekly basis to ensure safe to work on site.

Daily and weekly update of project progress monitored by reports and charts and using project drawing.

SISCO SAUDI LTD

Feb 2016 to Dec 2017

Position: Project In charge/ Site Manager

Project Handled

Jyumah Jump over Project at Ras Tanura Plant.

Jafurah Country Line oil & Gas and Well Pad project Saudi Aramco Alhofuf

Udalliayh Well head Project Saudi Aramco Udalliayh Eastern Province

United Tie in Shut down Project Sabic Al Jubail

worked with SISCO Saudi an EPC contractor of Saudi Aramco and Sabic in Eastern and Southern Province in KSA.

Worked as Site Manager in company since Feb 2016 to Dec 2017. In this Period up till now worked on Tie in Shutdown project United one Sabic affiliated plant in Jubail then after Udalliayh well head project for Oil and gas wells of Saudi Aramco and on Jafurah country pipeline project and well pad with Saudi Aramco.

While working in all these projects I use to deal with client, also manage subcontractors, interact with Engineering Dept of client incorporate his construction inputs, demand required construction drawings, review constructability, feedback planning and costing departments,

Assist the Project Manager in measurement and value of work done, familiar with codes and standards, use to apply technical knowledge at work, solve construction challenges, plan activities, predict subcontractor’s shortfall and productivity etc.

SAUDI ARABIAN PARSONS LTD,

Jan 2014 To Jan 2016

Position Held: Project Engineer,

Project in Hand

MINISTRY OFHOUSING DAMMAM North SAUDI ARABIA

I was working with M/S SAUDI ARABIAN PARSONS LTD. on the construction supervision of Ministry of Housing Roads and infrastructure Project. Project includes the construction of Sewer network Storm water drain potable water network irrigation network. Valve Chambers, Manholes and Roads works.

Worked with the focus of responsibility on supervision and execution of construction project:

Manage, coordinate, performed direct supervision of construction activities and expedite through subordinate professional staff delivery and implementation of assigned tasks within schedule and contract limitations while ensuring satisfaction of Project/ Quality Manager.

Review the Shop drawing and ITPs.

Lying testing and commissioning of Sewer, storm, potable, and water pipelines.

Conduct inspection and monitoring the day-to-day project progress of the infrastructure and underground utility within the project scope. Coordinates all issues related to the utility infrastructure under the projects scope with contractors for resolution.

liquid-retaining structures and Pump stations RCC Valve Chambers, RCC Manholes Culverts and concrete protection works

Review and approved the method statement submit by the contractor.

Coordinate with Different functional dept. for smooth work and interconnecting activity to be done prior.

Attend weekly meetings.

Conduct inspection and checking site works/Materials.

Monitor project progress to ensure conformity with approved schedule, engineering/ project standards, specifications & designs.

Interaction with the main contractors, and sub-contractors for execution of the project.

Ensured the safety tools and observed and ensured the high standards of safety and health.

L&T Hydrocarbon

December 2012to December 2013

Position Held: Construction Manager

Project In Hand

SADARA Polyethylene Saudi Aramco and Dow chemical (Package 2) (Jubail 2)

Worked with M/SL&T Hydrocarbon Company

On their project construction supervision of Sadara Polyethylene Plant Project. Project includes the construction of Pipe Rack foundations, Cooling tower, MCC buildings, Underground reservoirs, Different Machine Foundations, GRP Pipes lying and Jointing, Earth work filling

Responsibilities:

Worked as site Manager direct supervision on site for the complete package of Sadara Polyethylene Plant for the one complete shift.

Around 200 manpower including engineers, Forman, supervisor and around 35 heavy equipment’s controlled and executed safely without incident throughout the project.

Completed the construction of one cooling tower 02 machine rooms, 07 pipe racks from foundation and installation of flare from foundation up to last assembly, Installation, and construction of 1.2 m Diameter grp pipeline around 5 km completed on time and safely.

Interface and Coordination with other department to complete the activities smoothly.

Directly work with both Safety and quality on site complete tasks on time.

Ensure permits and JHA available on all working locations.

Attained quality and progress meetings with clients and senior management.

Daily progress report to Project manager and other higher management.

Saudi Binladin Group (ABCD)

Feb2009TONovember 2012

Position Held: Sr Site Engineer

Project Completed: 3 Civil defense building,2 traffic police station, One District Jail.

Construction supervision of Government Buildings Civil Defense buildings, Traffic police Station, Regional Police Station, underground utilities such as, sewer network, storm water network, potable water network, irrigation network landscaping and roads works.

Manage, coordinate, performed direct supervision of construction activities and expedite through subordinate professional staff delivery and implementation of assigned tasks within schedule and contract limitations while ensuring satisfaction of Project/ Quality Manager.

Preparation of Daily, Weekly and Monthly progress report of different projects.

Attend weekly progress meetings with subcontractors and client.

Monitor project progress to ensure conformity with approved schedule, engineering/ project standards, specifications & designs.

Interaction with the other functional Staff, and sub-contractors for execution of the project.

Ensured the safety tools and observed and ensured the high standards of safety and health.

Assist the Planning and development of resources such as manpower, machines, and materials.

Prepare the Reports for executed Quantity of Work done on different Project.

Qatar Co Contracting:

April 2007 TO Jan 2009

Position Held: Site Engineer

Project Completed: G+12 commercial Building in Najma Doha.

And Awakhaf Jama Masjid Alwakara

Preparation of Daily, Weekly and Monthly progress report for consultant for reclaim.

Attend weekly meetings.

Monitor project progress to ensure conformity with approved schedule, engineering/ project standards, specifications & designs.

Interaction with the other functional Staff, and sub-contractors for execution of the project.

Ensured the safety tools and observed and ensured the high standards of safety and health.

Conduct the field density test for reclamation land and prepare reports to submit consultant.

Assist the planning and development of resources such as manpower, machines, and materials.

Prepare the reports for executed quantity of work done on different Project.

Work experience in India:

Position: Civil Site Engineer

Duration: June 2005 to April 2007

Company: BE BILLIMORIA CO&LTD Mumbai (MS) India.

Projects Executed:

Construction of (3P+B+G+48) five-star residential building for Lodha Group

Mumbai.

Responsibilities:

Survey work execution jointly with Surveyor.

Assigning work to subcontractors as per bar bending schedule and Drawings.

Project progress work recording and it submission to billing.

Taking out quantities for ordering material.

To get Inspection and approval of survey and structural with client representative.

Execution of structural work as per drawing and specifications.

Mohammad Masood Ali # PMP

Address: Umluj Tabuk Region KSA

Mobile: 009**********

Email: adp97a@r.postjobfree.com



Contact this candidate