Mr. SIRZAMIN KHAN
PERSONAL DETAILES
Date of birth :17/12/1983
Nationality :Pakistan
Sr Land Surveyor (consultant)
Mob: WhatsApp: 009**********
Home: 009**********
Qatar: Driving license
E-mail : ***********@*****.***
Diploma of Associate Engineering – 2006
Computer Skills:
MS Office, AutoCAD, Civil 3D, O/S and Hardware Installation. F.Sc. 2003.
S.S.C. 2001.
Well experienced in the Saudi Arabia and Middle East with multinational multi lingual environment, qualified Land Surveyor with more than 14 years of experience in different forms of surveying. A reliable team member, industrious, proficient in computer operation and well-motivated individual. Seeking a challenging growth oriental career and suitable placement in a reputed organization that could offer professional and dynamic growth. Seeks a challenging position that could be of great help in an organization in which my professional skills abilities and job experience can be applied. Believe that these attributes would be essential to your organization. Professional Land Surveyor:
Company: Le Mirage Fit Out Sharaka Holding (QATAR) Project: Abu Humor City Shopping Village
Duration: 1st January 2021to till
2021 – CURRENT – Doha, Qatar HEAD OF SURVEY the survey team as a Head of survey teams for building structural & Utilities and road works on Project Analyzing project Planning, coordinating and supervising the work of survey crews Organizing work, people and resources Study operational problems in coordination with site engineers and other related experts Report on events and activities which may affect progress Coordinating with site engineers in order to ensure precise work execution Coordinating with consultant surveyors and QC department to get the work approved Organizing third party surveying Progress monitoring Maintaining of survey equipment Checking IFC drawings and preparing Shop Drawings Making survey reports in Civil 3D and all related documents for superior, engineers and consultant Preparing all relevant drawings and as builts for handing over
Company: Le Mirage Fit Out Sharaka Holding (QATAR) Project: Sherborne School Building Project (Qatar Al khesa) Duration: 13-June-To December 2020 completed
• Evaluated survey data and ensured accuracy of information in coordination with crew members.
• Communicated with team members and ensured completion of projects within timeframe.
• Performed data process as built dwg excavation structural column layout precast asphalt curbstone interlock and landscaping.
Company: Joint venture company Petroserv Limited & Strukton (QATAR) Project: Pipe line & Road project (Umm Al Dome) (Qatar) Duration: 02-Jan-2019 to 31-May-2019
Performed Supervise site according to drawings and specification, setting out and controlling all axis, gridlines structure work. Earth work, sewerage & manhole, duct bank, industrial &sanitary pipeline, Portable water Excavation work for identifying pipes, finding locations &marking according to the specified drawings by using Total Station and Level. data process As built drawing mechanical pipe line leveling as built dwg and filter lay out. Company: Basam shakir & partner co ltd
Project: Princess Al anoud third residential Mega tower Riyadh (k.s.a) Duration: 2015 to 2018.
• Supervised efficient working of crew members on various construction activities.
• Performed research and collected evidence to complete survey such as maps and deeds.
• Coordinated with land agents and established appropriate route for pipelines.
• Evaluated survey data and ensured accuracy of information in coordination with crew members.
• Communicated with team members and ensured completion of projects within timeframe.
• Performed data process as built dwg structural column layout asphalt curbstone interlock and landscaping
Company: AL Bawani Construction Co
Project: Bank Al Riyadh data center Riyadh Mega project (k.s.a). Duration: 2012 to 2015
• Performed Marking of boundaries and limits for excavation
• Checking excavation after interval for formation level and to avoid over excavation
• Putting level and offset points for blending concrete and also to align shutters for blending concrete
• Marking the points for footing and properly monitoring that survey points to be properly followed by the construction team
• Marking the column points and then guiding the site foremen and supervisor how to follow and erect the columns vertically and avoid any bend in columns
• Extracting all the required data for sitting out and then let it checked by the consulting team also
• Carried out inspections with consultant for all the site activity and prior any concrete pouring activities Taking as- built survey for all the excavation areas and the concrete done
• data process As built dwg structural column layout asphalt curbstone interlock and landscaping Company: AL Bawani Construction Co.
Project: King Faisal hospital single female Mega project Riyadh (k.s.a) Duration: May 2012 to 2015.
• Supervised Calculation for Coordinates & Level. Ensured compliance to all company quality system requirements for land survey. Evaluated survey data and maintained accuracy of all calculations and measurements. Supervised development of all data and charts and maintained records of survey
• Complete leveling & layout work used Total Station & Level instruments for footing foundations, concrete cost of grade slab, columns, beams, alignment of retaining walls inlet & outlet points. Shifted the temporary points between main control points for leveling at road work. Prepare survey reports, miscellaneous drawing, sketches and as built to be submitted for design purpose and quantity calculation.
• Performed data process As built drawing structural column layout asphalt curbstone interlock and landscaping.
Company: AL Kawther water treatment company.
Project: National water treatment company & five km Road project Riyadh (K.S.A) Duration: October 2009 to May 2012.
• Performed Supervise site according to drawings and specification, setting out and controlling all axis, gridlines structure work. Earth work, sewerage & manhole, duct bank, industrial &sanitary pipeline, waterline Excavation work for identifying pipes, finding locations &marking according to the specified drawings by using Total Station and Level.
• data process As built drawing mechanical pipe line 840 mm ductile align & leveling as built dwg and filter lay out and leveling
Company: Kaihan Company Afghanistan.
Project: 40 Meters bridge (Afghanistan)
Duration: April 2008 to March 2009.
• Supervised efficient working of construction site activities.
• Making sure the safety of all the co workers at site.
• Performed making of 40 meter bridge column layout and Company: Karcon construction Company Pakistan.
Project: Jahangira TO Sawabi Road Pakistan.
Duration: January 2007 to December 2008.
• Supervised efficient working of construction site activities.
• Making sure the safety of all the coworkers at site.
• Performed research and collected evidence to complete survey such as maps and deeds.
• Evaluated survey data and ensured accuracy of information in coordination with crew members Skills, and Abilities
• Knowledge of mathematics, survey computer programs, and survey computations applicable to the work.
• Knowledge of the use of mechanical drawing instruments or survey computer programs.
• Knowledge of the nomenclature and symbols of drafting.
• Knowledge of surveying instruments and equipment and their use and care. Knowledge of the principles and practices of land surveying.
• Knowledge of principles, practices and materials that could include computer programs used in survey work.
• Knowledge of state law regarding the establishments of plats, property lines, and survey monuments.
• Ability to apply knowledge of land surveying to land surveying activities and techniques.
• Ability to make arithmetic computations accurately and record results legibly.
• Ability to do transit and level work, which may include application of total station instruments to survey projects.
• Ability to use surveying instruments
• Ability to reduce and plot field notes to make computations required. Ability to make engineering sketches, maps and drawings.
• Ability to read and interpret engineering plans and specifications.
• Ability to carry out written and oral directions.
• Ability to communicate effectively with others.
• Ability to maintain favorable public relations.
• Ability to Reporting to project manager responsible for managing and leading a group of surveyors of different.
• Ability to projects surveys and leveling such as topography, profiles, cross section details setting out survey.
• Ability to as built survey as per project requirements. Coordinating the survey data with design engineers.
• Ability to draftsmen for design and plotting as well as with quantity surveyor for tendering and payments.
Ability to Roads center line, Horizontal and vertical curves and super elevation. Different kinds of Sum pits, Elevator pits, Cornish wall, Retaining wall, Columns with actual marking and offsets as well as line and curve calculation.
Experience Summary
14 years of experience in Land surveying and survey management roles with a Multinational and local organization such as KARCON and Al Kawther. Co. Ltd. Covering highways sewerages, boundary walls, buildings and drainage networks. The management and leasing of teams of surveyors for the execution of topographic, preliminary, setting out and as built surveys with the extensive use of modern surveying equipment such as Leica, Topcon, Sokkia, Total Stations, Theodolites and Dumpy levels. Assisting and coordination with design team’s construction teams as well as with consultants. INSTRUMENTS USED TOTAL STATION: Topcon, Sokkia, Leica. GPS: Trimble Level: All types of Levels Objectives:
• Seeking a career-oriented position in a reputed dynamic organization for challenging tasks. Enhancing the professional knowledge to deal the challenging problems show commitment To growth and development of the organization.
• Contributing towards the state-of-the-art research associated with concrete technology Construction & pavement supervision for Horizontal and Vertical controls.
• Be able to serve in challenging and growing situation in the basic of my skills and abilities.
• 019 – CURRENT – Doha, Qatar HEAD OF SURVEY/ TECHNICAL – STRUKTON CONSTRUCTION & TRADING WLL Leading the survey team as a Head of survey