Post Job Free
Sign in

Incharge Engg

Location:
Ennai, Tamil Nadu, India
Posted:
February 16, 2022

Contact this candidate

Resume:

CURRICULUM VITAE

C.SELVAKUMAR MOBILE no: +91-880*******

MAIL: *****************@*****.***

CAREER OBJECTIVE:-

To be an Efficient & Effective Engineer in the field of Production to show the best of my effort towards Organization. I am looking forward to a challenging job, which gives me an opportunity to take greater responsibilities and at the same time contribute to the company’s growth

PROFESSIONAL SYNOPSIS

A dynamic professional with over 18+ years of rich experience in supply chain

Now working with RAJSRIYA AUTOMOTIVE PVT Ltd, As a Project and production Planning in charge in NPD, customer support, dispatch & logistics)

Wide knowledge in Production planning, production and quality that will enable organization to consistently meet and enhance customer satisfaction.

Functional expertise in handling the production operations with key focus on bottom line profitability by ensuring optimal utilization of resources.

With managerial skills like 5S, Lean, Kanban, Kaizen 8D,etc,.

Very good knowledge in Systematic approach of solving problems.

ORGANIZATION EXPERIENCE

Tenure Company Name Designation

July20 – till date M/S. RAJSRIYA AUTOMOTIVE PVT LTD,Hosur Senior Engg

June19 – dec20 M/S. MEGA RUBBER TECHNOLOGIES PVT LTD,Hosur Asst Prd manager

Apr17 – Jun 19 M/S. RAJSRIYA AUTOMOTIVE PVT LTD,Hosur Senior Engg

Mar14 – Mar 17 M/S. JAYAM CNC APPLICATION,Hosur Prd Manager

Dec13 – Nov14 M/s. EQUIPTEST ENGINEERING PTE LTD, Singapore Ppc Incharge

Jan11 – Nov13 M/s. DISK PRECISION INDUSTRIES PTE LTD,Singapore Prd Incharge

Nov01 – Nov10 M/s RAP MFRS LTD., a TENNECO joint Venture Supervisor

Key Role at M/s. RAJSRIYA AUTOMOTIVE(P) LTD, (Senior Engg) Apr’17-June19

Study and clarifying the customer drawing

Feasibility for the specific products

Benchmarking with existing running models

Feasibility budget preparation for current projects

Fixtures, gauges concept finalization

Making and proving the fixtures and gauges

Handover document preparation and supplier cost verification and finalization

One year working in N251, wego frame line to reduce fixture related breakdown below 5 to 10 mins to modified our own design concept in fixtures.

To over look the smooth functioning of production through co-ordination between Quality & Machine Maintenance.

Key Role at M/s. JAYAM CNC APPLICATION, (Production Manager) Mar’15- Mar’17

Responsible for entire production,Production planning Control&Improvement activities in shop floor

Monitoring & measuring of all production activities in shop floor

To over look the smooth functioning of production through co-ordination between Quality, Tooling & Machine Maintenance.

To complete the production target

To maintain high level productivity

To keep low manufacturing cost

To sustain & improve quality of products

Identifying & Providing Training needs

Key Role at M/s EQUIPTEST ENGG PTE LTD (Ppc incharge) Dec’13-Nov’14

Receives sales order from marketing every month for the subsequent month planning.

Based on the sales order and Production capacity day wise monthly plan is generated and issue to the concerned section.

Check the physical stock statement and calculate the material required for making the required quantity.

Request for the RAW material and accessories to be procured and coordinate with the purchase department.

Monthly plan is spilit into weekly plan and the material required at each stage of operation to be calculated considering the lead time. issue the same to the concerned section head.

Day to Day plan is decided based on the weekly plan by the concerned section head.

Receive the daily production report from concerned dept and update the daily closing stock statement.

Prepare dispatch plan and issue it to packing and dispatch section. Receive the daily dispatch details and update the book order position.

Key Role at M/s DISK PRECISION INDUSTRIES PTE LTD (Prod incharge) Jan’11-Nov13

Receives production plan from PPC department and achieve the production based on the given production plan.

Ensure setup approval of product before starting the mass Production.

Conducting department review meeting with respect persons.

Implementation and maintain the 5’S in work area.

Monitoring & maintaining the records which are related to the production, quality and setup approval.

Initiating improvement activity related to process and maintaining the continual improvement.

Responsible for housekeeping at working area.

Production related training to be provided for employee.

Root cause analysis for quality issues.

Maintain the traceability of products.

Key Role at M/s RAP MFRS LTD (Supervisor Production) Nov’01-Nov’10

Production planning as per customer Schedule.

Achieving the Production targets through effective of the resources.

Shift planning, Manpower allotment according to the plan.

Conducting cell level BOS monthly the plan.

Monitoring & updating OEE daily basis.

Monitoring Scrap & rework data’s and take action to reduce the same.

Co-ordinating with purchase & PPC for achieving the plan.

Co-ordinating with maintenance for achieving Zero break downs.

Co-ordinating with quality for reduction of scrap & rework.

Co-ordinating with technical depts. Like PED R&D for new product.

Monitoring hourly production performance line wise.

Maintaining and improving the Productivity& overall equipment efficiency (OEE).

Follow up of daily, Weekly and monthly plan based on customer schedules.

Monitoring the production, performance to improve the productivity.

Preparation of daily, weekly and monthly reports of the production.

ACADEMIC QUALIFICATION

Diploma in Mechanical Engineering from SR Polytechnic – B.Komarapalayam (1998-2001) – 79% first class with honors.

COMPUTER SKILLS:

Good working skill in AUTO CAD 2000 –2019, MS Office.

PERSONAL DETAILS

Name : C.Selvakumar

Father Name : Chenrayan

Date Of Birth : 14.05.1983

Martial Status : Married

Language : English, Tamil & Kannada

Present & permanent address : L-6/10, TNHB, brinthavan nagar

Bagalur hudco

Hosur – 635109

DECLARATION

I here declare that the above said information is true and correct to the best of my knowledge and belief.

Place: Signature

Date:

(SELVAKUMAR.C)



Contact this candidate