Post Job Free

Resume

Sign in

Land Surveyor Mining Corporation

Location:
Khobar, Eastern, Saudi Arabia
Posted:
February 13, 2022

Contact this candidate

Resume:

Gary S. Antonio – B.S. GEODETIC ENGINEERING/ Senior Land Surveyor/ Assistant Land Surveyor etc.

Mobile No.: 055-***-****

E-Mail Add. adp7u4@r.postjobfree.com ; adp7u4@r.postjobfree.com Page1 of 10

TRANSFERABLE IQAMA

IQAMA NUMBER: 250-***-****

Gary Santos Antonio

(Updated: February 2022-PRESENT)

Professional Summary Objectives: Over +10 years of working experience ranging from construction project management as a result oriented and multidiscipline professional in the field of surveying. Able to identify problems, formulate solution, and analyze procedure, innovative, and works independently. Work well under pressure during past faced and stressful situation. Take pride in ability to motivate, energize and lead to successful outcome. Genuine as team player and committed to organizational success. Skilled at maintaining positive client relationship while working to resolve problems. Ability to work with minimum supervision.

Core Competencies 1. Bachelor of Science in Geodetic Engineering (BSGE/Senior) 2. Senior Land Surveyor/Construction Surveyor/Project Surveyor/ Survey Engineer/Assistant & Data-Processor

Professional Experience Llotor Arabia EPSA (Kingdom of Saudi Arabia)

Physical Address: 3384 Ahmad Al-Muaydi Al Nahda District Jeddah 23523 Position:Land Surveyor

Start Date: December 16, 2021

Till Date

Job Description

Conduct surveys at surface subsurface mine sites to obtain data used in planning mining operations. 2) Take instrument readings of sun or stars and calculates longitude latitude to determine mine location. 3) Direct survey technicians & helpers [Surveyor Helper any industry 869.567-010] in use of electronic surveying equipment, light emitting systems, or other instruments to transfer surface survey positions and directions to underground areas to survey assigned sections. 4) Compute data necessary for driving and connecting underground passages to control direction extent of mining operation.

Takenaka Civil Engineering & Construction Company Ltd. (PHILIPPINES) Physical Address: 18’th Floor Tower2 Enterprise Center,6766 Ayala Avenue Corner Paseo De Roxas Makati City, Philippines

Project Name: Metro Manila Subway Project-Philippines (MMSP CP-101) Client: Department of Transportation (DOTr)-Philippines Position: Senior Land Surveyor/Data Processor

Start Date: September 14, 2020

End Date: August 20, 2021

Desired Industry: Land Surveyor

Mobile No.: 055-***-****

E-Mail Add. adp7u4@r.postjobfree.com

Date of Birth: January 09, 1982

Gary S. Antonio – B.S. GEODETIC ENGINEERING/ Senior Land Surveyor/ Assistant Land Surveyor etc. Mobile No.: 055-***-****

E-Mail Add. adp7u4@r.postjobfree.com ; adp7u4@r.postjobfree.com Page2 of 10

Project Descriptions: The Metro Manila Subway, formerly known as the Mega Manila Subway (MMS), is an under- construction underground rapid transit line in Metro Manila, Philippines. The 36- kilometer

(22 mi) line, which will run north–south between Quezon City, Pasig, Makati, Taguig, and Pasay, consists of 15 stations between the Quirino Highway and FTI stations. It will become the country's second direct airport rail link after the North–South Commuter Railway, with a branch line to Ninoy Aquino International Airport. Dubbed as the "Project of the Century" in the country, the subway line's groundbreaking took place on February 27, 2019, and construction began the following December. It is expected to be partially opened in 2022 and fully operational by 2026. Expected to cost 227 billion (equivalent to US$4.5 billion in 2017 dollars), the line is the most expensive transportation project undertaken by the Duterte administration. Much of its cost is covered by a loan provided by the Japan International Cooperation Agency (JICA). Job Description;

Solve field survey problems, as well as determine the most expeditious and cost-effective manner to perform the survey work.

Assemble information and develop data necessary to perform field surveys

Determine field methods and procedures that produce not only an economical survey but also a final product that meets the engineering needs of that specific project.

Assure that all survey equipment is properly maintained and that equipment is used for its intended purpose.

Ensure that safety is given top priority in the planning and execution of all surveys.

Supervise the survey party in the absence of the Party Chief.

Record notes pertaining to the measurements taken by the various survey instruments and other miscellaneous notes as the Party Chief may direct.

Assist the Party Chief in the review of project data prior to the beginning of field surveys. Leighton Contracting Qatar- (LCQ)-State of Qatar

P.O. Box 11346 Doha Qatar

Specialization: Engineering Procurement Construction (EPC) Industry: Development, Construction and Management of Infrastructures and Services. Project Name: Qatar Economic Zone-3 (QEZ-3)

Project Location: Al-Wakra, State of Qatar

Client: MANATEQ-Government Qatar

Position: Senior Land Surveyor/Data Processor

Start Date: August 21, 2016

End Date: November 18, 2018

Project Descriptions: World-class infrastructure that will facilitate the development of the private sector and the Small and medium industries and enterprises, as well as to playing a vital part in the realization of the country’s overall economic growth and diversification strategy and in nurturing the local knowledge economy, an essential component towards the achievement of one of the key pillars contained in the Qatar National Vision 2030 – Economic Development. Job Descriptions;

Analyze control or survey data to ensure adherence to project specification or land survey standards.

Calculate the exact horizontal and vertical position of points on the earth's surface.

Verify the mathematical correctness of newly collected survey data.

Plan or direct the work of geodetic surveying staff, providing technical consultation as needed.

Assess the quality of control data to determine the need for additional survey data for engineering, construction, or other projects.

Maintain databases of geodetic and related information including coordinate, descriptive, or quality assurance data.

Conduct survey to determine exact position, measurement of the points elevation, elevation, lines, areas, volumes contours, or other features of the earth's surface.

Request additional survey data when field collection errors occur or engineering surveying specification are not maintained.Compute, retrace, or adjust existing surveys of features such as highway alignment, boundaries, utilities, control and other surveys to match the ground elevation dependents grids, geodetic grids, or property boundaries and to ensure accuracy and continuity of data used in engineering, surveying, or construction project. Gary S. Antonio – B.S. GEODETIC ENGINEERING/ Senior Land Surveyor/ Assistant Land Surveyor etc. Mobile No.: 055-***-****

E-Mail Add. adp7u4@r.postjobfree.com ; adp7u4@r.postjobfree.com Page3 of 10

Distribute compiled geodetic data to government agencies or the general public.

Review existing standards, control, or equipment used, recommending changes or upgrades as needed.

Prepare progress or technical reports.

Perform another assign task

Dragados Gulf Construction Co. Ltd.-Grupo ACS-Espanol (Kingdom of Saudi Arabia) P.O. Box 39477, Dhahran Doha 31942, Kingdom of Saudi Arabia Specialization: Oil & Energy, Heavy Industrial Infrastructure, Upstream, Downstream &Telecom Project Industry: Development, Construction and Management of Infrastructures and Services. Project Name: Umm Wu’al EPC Project, DAP/NPK-RAK PLANT, Storage & Offsite at Ras Al-Khair, Saudi Arabia

Project Client: MA’ADEN (Saudi Arabian Mining Company) Project Site: Ma’aden Phosphate Company, Ras Al-Khair, KSA Position: Project Surveyor

Start Date: March 11, 2014

End Date: September 23, 2015

Project Description: Engineering Procurement & Construction (EPC) The scope of work is to discharge system of phosphoric acid from the tanker trains, storage tanks, all necessary piping and pumps to transfer the phosphoric acid both to the DAP plant and to the port, ship loading systems, electrical substations, communication systems, utilities, interconnection system to the existing plant to a series of auxiliary buildings.

Job Descriptions;

Carrying out regular inspections prior request for third party survey as per description base from the method of statement submitted by the QA/QC-Management

Keeping and compiling records made survey report on the site.

Monitored planning applications and recommended improvements. Provided support to clients and if required participate as witness in legal proceedings.

Coordinated with clients and resolved various disputes for property boundary.

Writing technical reports.

Planning and overseeing survey for building work.

Support Coordinate with interdepartmental other discipline projects and/or multi-disciplinary teams.

Monitoring progress and ensuring work is completed on time.

Performed another assign task

Metals Services for Trading & Contracting Company (MSTC)- (Kingdom of Saudi Arabia) P.O. Box 12290, Dammam 31473, Kingdom of Saudi Arabia Specialization: Oil and Gas Pipeline and Water Infrastructures Industry: Oil and Gas Pipeline and Water Infrastructure Project Project Name: Sales Gas Delivery System to Riyadh PP11-IPP to Dhruma Riyadh Client: Joint Venture-Saudi Electricity Company (SEC) & Saudi Aramco Project Site: PP11-Dhruma Riyadh KSA

Position: Land Surveyor

Start Date: July 03, 2013

End Date: February 27, 2014

Project Description: Site Preparation, Civil Structural Work, Grading Paving, Fencing at Tie-in, Scraper Launcher & Receiver and Metering Area including Pipe Supports, Sleeper supports, Access Platforms, Full Thrust Anchor Block, Jib Crane and Scrapper handling facilities and Metering Shelter. Job Descriptions;

Field surveying for a wide range of surveying projects

Office computations and data management

Client liaison and development

Quality assurance and project delivery

Progress towards a Degree in Surveying

Ability to work with limited supervision

Gary S. Antonio – B.S. GEODETIC ENGINEERING/ Senior Land Surveyor/ Assistant Land Surveyor etc. Mobile No.: 055-***-****

E-Mail Add. adp7u4@r.postjobfree.com ; adp7u4@r.postjobfree.com Page4 of 10

Highly developed communication skills

Well-developed interpersonal skills and time management skills

Commitment to safety, training, innovation and continuous improvement

Well-developed computer skills

Sound knowledge of modern Total Station equipment & GPS equipment

Knowledge of CAD/survey packages

Performed other assign task.

Metals Services for Trading & Contracting Company (MSTC)- (Kingdom of Saudi Arabia) Project Name: EPC Transportation of Treated Water from Taif to Ma’aden Mine Site Client: Ma’aden (Saudi Arabian Mining Company)

Project Site: Package-1, 2&3-Taif to Ad-Duaihi, KSA Project Description: EPC-Package1, Transport Pump Station (TPS) & 71KM Pipeline up to Master Pump Station EPC-Package2, Master Pump Station (MPS) & 233-304KM Pipeline EPC-Package3, Storage Facility & 116KM Pipeline up to Ad-Duaihi Mine Site Area Position: Land-Surveyor

Start Date: December 16, 2012

End Date: July 03, 2013

Project Description: Transport Pump Station (TPS) and 451KM Pipeline up to Mater Pump Station which shall consist of Transfer Pump Station inclusive of all facilities with fence and Operation building, SEC room, Interconnecting Piping and fittings, Transfer Pumps, 71KM Pipeline installation up to nozzle of Water Storage Tanks at MPS, Pressure Reducing Valve, Relief Valves, Gear Operated Valves and associated WORK’s related to Electrical, Instrumentation and Communication equipment’s.

Job Descriptions;

As-built Data Collection for Project Requirements

Data Compilation and Manipulation

Management of Field Photography and Records

Production of Construction As-built Drawings

Drawing Registers and Document Traceability

Project GIS and Data Import from Field Supervisors

Data Storage and Dedicated FTP Servers

Right of Way (ROW) and Work Area Setout

Stringing and Bending Calculations to Assist Mechanical Supervisors

Service Location and Data Management

Special Crossing Surveys including Bending Designs.

HDD and Bored Crossing Design and Setout

Pipe Centerlines and Detailed Trench Setouts

As-built Surveys

Rehabilitation and Post-construction Surveys

Precision Set out for Civil Works and Facility Sites

Performed other assign task.

Solar Resource Inc. (SRI)- Philippines

Solar Century Tower, Salcedo Village Makati City M.M, Philippines Specialization: Engineering-Civil/Construction

Industry: Property/Real Estate

Reporting to: Construction Manager, Project Engineer & Party Chief Survey Project Site: All South Projects in Cavite, Laguna & Batangas Area Start Date: November 02, 2011

End Date: June 28, 2012

Position: Site Surveyor

Project Description: Comprises a wide range of activities involving residential construction, Commercial construction, bridge erection, roadway paving, excavations, Gary S. Antonio – B.S. GEODETIC ENGINEERING/ Senior Land Surveyor/ Assistant Land Surveyor etc. Mobile No.: 055-***-****

E-Mail Add. adp7u4@r.postjobfree.com ; adp7u4@r.postjobfree.com Page5 of 10

Job Descriptions;

Conduct relocation survey of the project site in order to establish legal boundaries for properties based on legal deeds or titles. Direct or Conduct topographic survey relative to the project.

Layout of horizontal and vertical control for roads, bridge, culvert, dike, water sewerage, elevated water tank, meralco post, private pole, housing unit and buildings footing.

Layouts RPC invert elevation of drainage and other sanitary works. Supervision of the general construction of land development project. Supervision Sub-Contractor for land development project.

Coordination with planning department for the designs of land development. Preparation of as-built plans for land development. Coordinate with QA/QC for work inspection.

Creates schedule and monitoring of land development works.

Computation of area, volume & perimeter necessary for the land development project.

Plotting of vertical and horizontal existing side-shot obtain from the site. Prepared reports and deliverables.

Perform other assign task.

Abdulla Ahmad Dossary Holding Company (AAD)- (Kingdom of Saudi Arabia) P.O. Box Al-Khobar 31952, Kingdom of Saudi Arabia

Specialization: Engineering-Civil/Construction

Industry: Roads, Bridges, Water and Sewer Line, Civil Infrastructures, Road Maintenance & Special Projects Project Name: P&C of Completion of Evacuation Road, Phase I Client: Royal Commission Jubail

Project Site: Jubail Industrial Area Eastern Region-KSA Position: Land Surveyor

Start Date: January 17, 2010

End Date: June 08, 2011

Project Description: Site Preparation, Earthwork, Roads, Storm Drainage Channel, Utility Sleeves and Ducts, Electrical Power Dist., St. Lighting & Traffic System

Job Descriptions;

Prepare plan and programs for the executions of the scope of work. Undertake collection of as-built drawings and other needed information related to road pavement. Monitor the accomplishment of pavement and roads condition. Review and Compute the collected data to ensure its integrity and correctness. Provide technical assistance to the engineers. Conduct quality check of data in the system. Carry out analysis on survey results.

Prepare pavement reports which include pavement & roads condition index (PCI) and inventory of pavement sections. Provide data and other related information in the development of maintenance pavement system (PMS)

and the M&R needs of airfield and road pavement network. Preparation of design layout of landscaping.

Developed and presented the presentations to the client and answered all their queries. Designed the necessary sketches for the presentation to the client and ensured that drawings were in compliance to the client requirement. Prepared designs for the road projects and ensured that the geometric were taken into account. Documented the procedures and ensured that all EH&S regulations and requirements are met.

Performed other assign task.

Abdulla Ahmad Dossary Holding Company (AAD)- (Kingdom of Saudi Arabia) Project Name: P&C of Bridges in Community Area

Client: Royal Commission Jubail

Project Site: Jubail Industrial Area Eastern Region-KSA Position: Land Surveyor

Start Date: March 04, 2009

End Date: January 12, 2010

Project Description: Site Preparation, Earthwork, Roads, Storm Drainage Channel, Utility Sleeves and Ducts, Bridges

& Overpass, St. Lighting & Traffic System.

Job Descriptions;

Managed analysis and design control and outlined geometry control for structures. Advanced concepts for bridge projects and innovated construction drawings for CAD Technicians. Established and evaluated project specifications. Analyzed bridge construction and design support during construction. Evaluated store diagram submittals.

Gary S. Antonio – B.S. GEODETIC ENGINEERING/ Senior Land Surveyor/ Assistant Land Surveyor etc. Mobile No.: 055-***-****

E-Mail Add. adp7u4@r.postjobfree.com ; adp7u4@r.postjobfree.com Page6 of 10

Resolved problems, detailed engineering specifications. Formulated structural design and evaluation of bridges. Handled structural engineering projects and advanced cost-effective design solutions. Outlined design criteria and engineering specifications. Imparted technical assistance and coached project team members. Coordinated with clients, government and regulatory authorities as well as contractors

Designed and prepared construction plans for various types of bridges in accordance with NH DOT standards. Provided technical support in the review of design packages and drawings. Coordinated with teammates on company estimating methods and procedures and prepared directions. Supervised and performed engineering and surveying activities to accurately monitor record and report actual production and performance data. Assisted in surveying work by operating surveying instruments, staking out locations, plotting alignment and grades.

Prepared reports and deliverables.

Abdulla Ahmad Dossary Holding Company (AAD)- (Kingdom of Saudi Arabia) Project Name. Construction & Maintenance of Roads - Saihat, Qatif, Dammam & Khobar Client: Ministry of Municipal & Rural Affairs Directorate General Office (AMANAH) Project Site: Saihat, Qatif, Dammam & Khobar-KSA

Position: Land Surveyor

Start Date: February 28, 2008

End Date: March 02, 2009

Project Description: Site preparation, construction of new roads, road maintenance, excavation, earthworks, backfilling, sidewalk, curbstone, curb gutter, manhole installation, underground piping, sewer and water lines, landscaping and irrigation, traffic system, digital signage, road marking and fencing. Job Descriptions;

Plan, coordinate and supervise the work of several field survey crews.

Instruct survey crews in the field layout of the more difficult construction projects, in replacing lost survey monuments, in setting property corners on city land from legal descriptions and title information, and in performing other aspects of survey work.

Serve as the liaison between public utilities, contractors, and subcontractors during construction to provide continuity in the assignment of survey crews.

Attend pre-construction conferences to convey information of contractors' intent to field crews and the engineering design, inspection, and materials sections.

Coordinate work assignments with the schedule of the contractor to ensure timely completion of projects.

Review and analyze work methods to increase efficiency and productivity and provide input into the writing of performance standards.

Keep detailed and accurate records of crew activities, survey data.

Study operational problems and recommend changes.

Report on events and activities which may affect operations.

Prepared reports and deliverables.

Performed other assign task

Municipality of Rodriguez Rizal, Philippines

Balite Rodriguez Rizal, Philippines

Department: Engineering/Survey

Position: Land Surveyor

Start Date: February 15, 2006

End Date: October 24, 2006

Work Description: Land Development, Municipal Cadastral Survey & Municipality Control Project Job Descriptions;

Preparation of Plan and data necessary for the site.

As-Built the site condition, existing and design layout

Gathering technical data from the site upload through the computer

Checking for the boundary property line plan and establish tie reference points to enable the re-establishing of

Property monuments if and when these are dislocated during construction.

Check the building and other structures are property lay out in accordance with the approved plans. Gary S. Antonio – B.S. GEODETIC ENGINEERING/ Senior Land Surveyor/ Assistant Land Surveyor etc. Mobile No.: 055-***-****

E-Mail Add. adp7u4@r.postjobfree.com ; adp7u4@r.postjobfree.com Page7 of 10

Developed master plans for municipal infrastructure and prepared reports for storm water management. Managed project and ensured that it was prepared on time. Provided technical support to project members and engineers. Coordinated with contractors, clients and regulatory authorities to complete project. Maintained good working relationships with client and ensured that business was developed according to their needs.

Prepared all engineering documents and provided equipment schedules. Maintain a logbook or field book to record daily the following.

Surrender the logbook for office file as soon as the logbook is filled or at the completion of the project.

Maintain a jobsite file.

Accomplishment of evaluation work

Remarks on jobsite problems and causes of delay including recommendation. Eastern Geotech and Development Inc.

Balite Rodriguez Rizal, Philippines

Specialization: Land Development/Real State

Industry: Property/Real Estate

Position: Assistant Land-Surveyor

Start Date: April 02, 2004

End Date: February 11, 2006

Job Descriptions;

Hard core knowledge of surveying and measurement principles and practices

Technical competence to use the survey, analytical and measurement tools and equipment

Excellent numeric skills, required to collect data and compute statistics

Capable of taking up responsibilities and being accountable for the work performed

Physical fitness required to go on field and conduct surveys

Assist the chief surveyor in survey expeditions by arranging the necessary equipment’s, cleaning land area and drawing boundaries.

Apply the knowledge of principles and policies related to occupational health hazards and safety measures towards workers and environment welfare.

Support the team of engineers and analyst in studying the survey reports, engineering plans, site photographs and computer records.

Act as a link with other internal departments of research, accounts, insurance, law etc. and coordinate the movement of information between the departments.

Prepared reports and deliverables.

Performed other assigned task.

Education Bachelor of Science in Geodetic Engineering (BSGE/Senior- 1999-2004 University of Rizal System (URS) Pililla Rizal, Philippines Professional Affiliations

Saudi Council of Engineer-Kingdom of Saudi Arabia-SCE Membership No.184306 Start Date: October 26, 2014

End Date: October 25, 2016

URS-Pililla, Rizal Alumni Association- URSP Membership No. P-068 Date: March 30, 2004

URS-Pililla, Rizal Student Engineering Association- Membership No. 00-0086 Date: December 18, 2004

Trainings Certificates & Seminars Gary S. Antonio – B.S. GEODETIC ENGINEERING/ Senior Land Surveyor/ Assistant Land Surveyor etc. Mobile No.: 055-***-****

E-Mail Add. adp7u4@r.postjobfree.com ; adp7u4@r.postjobfree.com Page8 of 10

Fundamental Works of Leica Digital Level Sprinter 150M CERTEZA INFOSYS CORPORATION, Ortigas Avenue San Juan Philippines- Certificate No. 2020-076 Start Date: December 01, 2020

End Date: December 01, 2020

Modern Survey and Road Geometric Design Construction Surveying, CEBS Training Centre KEA SURVEYING TECHNOLOGIES, Doha, State of Qatar- Autodesk Certificate No. 121******* Start Date: April 28, 2017

End Date: May 26, 2017

Introduction and Overview in Civil 3D 2017 CEBS Training Centre, KEA SURVEYING TECHNOLOGIES, Doha, State of Qatar-Autodesk Certificate No.1AJP356988 Start Date: April 28, 2017

End Date: May 26, 2017

Basic First Aid and CPR, Qatar Economic Zone-3 (QEZ-3) HSE ENERTECH State of QATAR Membership No.: 5081016B6661 Start Date: October 18, 2016

End Date: October 17, 2018

Permit to Work /Receiver, Qatar Economic Zone-3 (QEZ-3) HSE ENERTECH State of QATAR Membership No.: 53431016C011 Start Date: October 24, 2016

End Date: October 23, 2018

Project Management Professional-PMP

(3Fold Education Centre) Dubai, UAE- Training Certificate No. 16782 Start Date: February 12, 2016

End Date: March 11, 2016

ISO 9001:2015 QMS Training New Change and Challenges

(3Fold Education Centre) Dubai, UAE- Training Certificate No. 16629 Start Date: February 11, 2016

End Date: February 11, 2016

MA’ADEN PHOSPATE COMPANY (MPC), Ras Al-Khair-Kingdom of Saudi Arabia Work Permit Issuer/Acceptor HSE & ENVIRONMENT-Training Certificate No. 2400, MPC No. 1760 Start Date: February 04, 2015

End Date: February 04, 2015

AutoCAD 2012 with Color Rendering (AutoCAD 2D/3D) Micro Cad Technologies Inc. Cubao, Quezon City Philippines, Training Certificate No. 188******* Start Date: October 04, 2011

End Date: October 21, 2011

Revit Structure 2011(Parametric Structural Design Modeler) Magna Cad Technologies School Inc. Sampaloc, Manila Philippines- Training Certificate No. 4274 Start Date: September 05, 2011

End Date: September 15, 2011

Seminar-Philex Mining Corporation Philippines

University of Rizal System Educational Tour

Mining Exploration Study, Tuba Benguet Philippines Start Date: December 05, 2004

End Date: December 05, 2004

Gary S. Antonio – B.S. GEODETIC ENGINEERING/ Senior Land Surveyor/ Assistant Land Surveyor etc. Mobile No.: 055-***-****

E-Mail Add. adp7u4@r.postjobfree.com ; adp7u4@r.postjobfree.com Page9 of 10

Bureau of Coast & Geodetic Survey (Bureau of Land)-Philippines University of Rizal System Educational Tour

Binondo, Manila Philippines,

Start Date: November 08, 2004

End Date: November 08, 2004

Computer Software Knowledge Microsoft Office user, Certified AutoCAD (2D & 3D) Surveying Data Processing-2017, Familiarity Surpac-Mining Familiarity G.E Survey user, MicroSta. Land Desktop Familiarity Soft Desk user, Proficient Uploading & downloading data from Electronic TOTAL STA. survey Instrument to Computer

(VICE-VERSA), Proficient Plotting and Scaling plan. Surveying Instrument Handled and Used Leica NA720 Dumpy Level, Sokkia B40Automatic Dumpy Level, Engineer Transit, Wild T2 Theodolite. EDM-Total Sta. Topcon GTS 105N, Nikon DTM 322, Nikon AS-2, Sokkia Set 550X, Sokkia CX & FX-102, Leica TC805, Leica Sprinter 150M, Leica TCP1201 & Leica GPS/GNSS 10/15, Trimble C5/HP3, Trimble RTK-GPS R10.

Character References

Engr. Cenon Turiano Jr. Geodetic Engineer +974-****-****

Engr. Marlon Payawal Geodetic Engineer +974-****-****

Engr. Jayson Carlo Tabora Geodetic Engineer +974-****-****

Engr. Edwin Pajar Civil Engineer +974-****-****

Engr. Arnel Santiago Civil Engineer +974-****-**** Additional Information Profile: Recent Position Senior Land Surveyor Engineer, Male, 5’6” height, 39-yrs.old, Married &3-son, Driver License: PHILIPPINES Restriction 1,2-N02-09-007541, KSA No.2231587631Restriction, 1, 2&3 Knowledge of Heavy Equipment Machinery, Hobbies: Playing Basketball, Internet Surfing, Reading Educational & Bible Books, Language: English, & Tagalog, Health: Fit for work.

I hereby certify that the above information is true and correct to the best of my knowledge and belief. Reminder:

In case you cannot contact my number specified in the heading, kindly send me an email notification for me to respond.

Applicant: Gary S. Antonio



Contact this candidate