SUMMARY

I have over Eighteen (18) years of diversified experience in construction management and cost engineering within the Oil and Gas sector for both onshore and offshore facilities in the following areas: building and civil works, structural, piping/pipeline, and related infrastructure works. I am a result-oriented person with proven ability to proactively identify and solve problems as well as completing projects in a timely and cost-effective manner. In proffering solutions in the course of my career, I endeavor to accurately identify changes and deliver the projects in compliance with industry standards and quality. As a member of the project controls team, i manages and administers all cost related tasks and ensure prompt payments to the companies within the agreed schedule. I also liaise and communicate with clients and subcontractors to reduce lost time and contractual claims as well as maintaining cash flow for the projects. EXPERIENCE

2020 – To present Quantity Surveyor – AL Asab General Contracting LLC, Abu Dhabi United Arab Emirate

ADNOC - Call-out Project for Bu Hasa Wellhead Remote Monitoring and Control Implementation and Construction of Oil Network Over Pressure Protection – Long term

(EPC) (Engineering, Civil works, Piping & Pipeline, Structural works, Electrical and Instrumentation)

Main duties/Responsibilities are;

• Preparation of materials quantity take-off (Civil & Mechanical) from AFC drawings for the project.

• Preparation and Planning of IMR & ISR for the project, using Cumulus PMO software.

• Preparation of PR for the project, using PMO Cumulus software.

• Developing Job Card Template for Civil and mechanical scope of work, for daily progress measurement tracking.

• Site measurement for monthly valuation and variation.

• Saving cost to the company by assisting in valuing completed work and arranging monthly interim payments promptly as required by the contract document.

• Measure, Value, submit and negotiate contract variation due to the company.

• Prepare periodic correspondence related to claims/contracts.

• Valuing and scrutinizing periodic payment certificates due to 3 rd

Party Sub-contractors.

• Periodic evaluation of contracts rate for project purpose.

• Preparation of cash flows and invoice forecast.

• Tracking and updating contractor materials delivered to and used by sub-contractor by ensuring non waste of materials on site.

• Negotiating with or subcontractor(s) to ensure contract budgets are not exceeded.

• Overseeing the measurement and re-measurement BOQs process and managing the preparation of BOQs

• Ensure HSE compliance in the delivery of the tasks and targets by attending HSE meetings and participating in all site safety activities. Al Asab Habshan Camp No.3 Abu Dhabi, Al Dhafra, UAE Phone: +971*********, +234**********, +234********** E-mail adp77i@r.postjobfree.com

Skype: adp77i@r.postjobfree.com

2

2017 – 2020 Cost Estimator/Onshore/Offshore Construction Supervisor – Mobil Producing Nigeria Unlimited, Lagos

UBIT GP Restoration Projects (Structural, Piping, Electrical and Instrumentation) Main duties/Responsibilities are;

• Work pack Man-hours estimate preparation for (onshore and offshore) Electrical, Instrumentation and structural/Piping fabrication and installation work scope.

• Preparation of Bill of Materials from AFC drawings for (onshore and offshore) Electrical, Instrumentation and structural/piping work scope

• Preparing daily, weekly and monthly construction/installation progress report timely in accordance with the contract requirement for onshore and offshore-related tasks.

• Saving cost to the company by assisting in valuing completed work and arranging payments promptly as required by the contract document.

• Tracking and updating client materials delivered to and used by sub-contractor by ensuring non waste of materials on site.

• Coordinating Onshore fabrication scope for piping, structural, Electrical & instrumentation works

• Coordinating work park compliance by contractor for offshore installation scope piping, structural, Electrical & instrumentation works at Boat landing, Cellar and Main deck areas.

• Negotiating with contractor (s) or subcontractor(s) to ensure contract budgets are not exceeded.

• Ensure HSE compliance in the delivery of the tasks and targets by attending HSE meetings and participating in all site safety activities. Fill and submitted U-see, U-act form periodically.

24’’ Idoho/20’’ OSO – QIT Pipeline Installation

24’’ Idoho/20’’ OSO – QIT Shore Crossing Installation Main duties/Responsibilities are;

• Supervising work park compliance by contractor on site.

• Preparing daily, weekly and monthly construction/installation progress report timely in accordance with the contract requirement for onshore related tasks.

• Saving cost to the company by assisting in valuing completed work as required by the contract document.

• Tracking and updating client materials delivered to site and used by sub-contractor by ensuring non waste of materials on site.

• Coordinating onshore installation and dismantling of shore crossing installation materials in accordance with contract requirement to ensure contract budgets are not exceeded.

• Coordinating onshore pipeline installation scope and structural works in accordance with contract requirement, to ensure contract budgets are not exceeded.

• Ensure HSE compliance in the delivery of the tasks and targets by attending HSE meetings and participating in all site safety activities. Fill and submitted U-see, U-act form periodically. Al Asab Habshan Camp No.3 Abu Dhabi, Al Dhafra, UAE Phone: +971*********, +234**********, +234********** E-mail adp77i@r.postjobfree.com

Skype: adp77i@r.postjobfree.com

3

OSO RX Restoration Project

Main duties/Responsibilities are;

• Prepare cladding/Insulation BOQ for fire damaged spools.

• Preparing daily and weekly construction/installation progress report timely in accordance with the contract requirement.

• Saving cost to the company by assisting in valuing completed work by subcontractor’s as required by the contract document.

• Tracking and updating client materials delivered to site and used by sub-contractor by ensuring non waste of materials on site.

• Supervise/Coordinating offshore replacement and restoration of fire damaged piping, structural, electrical & instrumentation items on the platform (Cellar, Main and upper deck)

• Work closely with the commissioning engineer on all pre-commissioning activities and punch list close out prior to start up.

• Interfaced with quality control/monitoring of task compliance by subcontractor’s

• Ensure HSE compliance in the delivery of the tasks and targets by attending HSE meetings and participating in all site safety activities. Fill and submitted U-see, U-act form periodically. 2008 – 2016 Quantity Surveyor/Construction Engineer – DeltaAfrik Engineering Limited, Lagos

EPCM 1 MAJOR INTEGRITY PROJECT (EXXON MOBIL)

• Critical Crude Pipeline Segment Replacement Projects

• Edop 24inch Pipeline Segment replacement

• Ekpe-Asbo 16inch Pipeline Replacement Project

Main duties/Responsibilities are;

• Preparing daily, weekly and monthly construction/installation progress report timely in accordance with the contract requirement for onshore and offshore related tasks.

• Saving cost to the company by assisting in valuing completed work and arranging payments promptly as required by the contract document.

• Ensuring company get payment for variation scope of work by undertaking costs analysis for project revisions outside the scope of work regularly.

• Performing risk and value management and cost control.

• Preparation of Bill of Quantities from AFC drawings for associated civil work (Building and infrastructure works).

• Tracking and updating client materials delivered to and used by sub-contractor by ensuring no waste of materials on site.

• Negotiating with contractor (s) or subcontractor(s) to ensure contract budgets are not exceeded.

• Preparing and analyzing contractor (s) or subcontractor(s) tender estimates and recommending to the company accurate payment due as specified in the contract.

• Job card preparation for (onshore and offshore) structural and piping drawings, analysis of work park compliance and reporting progress made daily.

• Preparation interim and final account valuation for both civil and fabrication works within contract specified target.

• Preparation of commercial tenders from AFC drawings for structural, mechanical, electrical and piping scope of work by adhering to all client tendering requirement and ensuring high quality Al Asab Habshan Camp No.3 Abu Dhabi, Al Dhafra, UAE Phone: +971*********, +234**********, +234********** E-mail adp77i@r.postjobfree.com

Skype: adp77i@r.postjobfree.com

4

submissions are made to Clients as per agreed timing.

• Preparation of Piping, Mechanical, Electrical and Structural MTO'S for project execution, thereby reducing waste on site.

• Preparation and Packaging of pre-qualification documents for tendering processes.

• Preparation cost estimate for piping, mechanical, electrical and structural works.

• Ensure HSE compliance in the delivery of the tasks and targets by attending HSE meetings and participating in SCC activities. (1.) Participated in daily, weekly and monthly safety meetings (2.) Fill and submitted SCC form periodically. GAS REVOLUTION INDUSTRIAL PARK (GRIP) - NNPC & PROJECT MANAGEMENT CONSULTANCY SERVICES FOR AMMONIA, UREA & METHANOL PROJECT - BRASS FERTILIZER COMPANY (BFCL)

Main duties/Responsibilities are;

• Provide Cost Controller services for the Gas Revolution Industrial Park Project

(Concept Master Plan Stage) for the project duration by ensuring all activities and deliverables are performed in accordance with the contract requirement.

• Preparation of Class 1,2,3,4 & 5 estimate for tendering purposes and meeting client requirement.

• Timely completion of Management of Project Change (MOPC) process within the routine monthly calendar.

• Preparation and issuance of invoices within the set target date for the month.

• Preparation of PVN & LOA as requested by the contract within the routine monthly calendar as required.

• Generate accurate costs and installed rates data for the project controls group to facilitate smooth operations.

• Validate generated costs and schedule control information from the contract for the project controls group.

• Timely Collation of project execution tasks, evaluate, monitor and provide reporting support on the assigned contract in terms of cost, schedule and progress.

• Complete the following tasks: cost planning, cost analysis, site measurements to enable onsite progress payments and variation claims for payment purposes to the company as required by the contract.

• Timely identification and reporting of any potential cost and schedule issues that might increase the project cost.

• Provide support in ensuring that all correspondence, documentation, reporting and other related information for the contract is processed in accordance with project correspondence and document control procedures.

• Retrieve, review and validate submitted variations, invoices and schedules of installed quantities and equipment against the contract, scope and drawings as at when due.

• Ensure HSE compliance in the delivery of the tasks and targets by attending HSE meetings and participating in SCC activities. (1.) Participated in daily, weekly and monthly safety meetings (2.) Fill and submitted SCC form periodically.

Al Asab Habshan Camp No.3 Abu Dhabi, Al Dhafra, UAE Phone: +971*********, +234**********, +234********** E-mail adp77i@r.postjobfree.com

Skype: adp77i@r.postjobfree.com

5

NEW INCINERATOR SYSTEM PROJECT – (NLNG) BUILDING & CIVIL WORKS, STEEL STRUCTURAL FRAME, PIPELINE & PIPING, ELECTRICAL & MECHANICAL INSTALLATIONS, INSTRUMENTATION, AND EQUIPMENT INSTALLATION

Main duties/Responsibilities are;

• Collate all relevant data and prepare Class 1, 2, 3, 4 & 5, Bill of quantities (BOQ) for the NLNG New Incinerator System in accordance with the Contract requirement in readiness for submission to the Client and within schedule of the activity.

• Liaising with the different disciplines in collating and sorting out the required drawings need for the taking-off process.

• Following up with the different disciplines in collating client required changes and effecting such changes in the Boq requirement within the set targets.

• Timely completion of the BOQ for the following categories as per the budgeted schedule and time frame:

(a.) Preliminaries and General Items. (b.) Engineering scope (Detail Engineering, Installation Engineering and As-Built Drawings). (c.) Civil works (Fencing, Storm water drainage, Road construction, Rotary kiln Incinerator base, Crushing & Compacting machine base, Weather Proof Shelter, Office Building, Perimeter Lighting, External Works, Sorting Platform Base, Paving, Sorting & Holding Bay Base, Waste Dump Yard, Main Distribution Supply Cables, Roof Covering & Structural Framing of Compacting/Crushing/Sorting/Holding Bay and Waste Cells Base, and Surface Coating to Concrete Structure. (d.) Pipeline & Piping (Bulk Materials, Fabrication, Pipe Support Base and Structural steel installation for Pipe Supports. (e.) Instrumentation (Bulk Materials and Installation Works). (f.) Equipment Installation (Incinerator System Procurement, Civil works, Inter-Connecting Pipe and Structural Works requirement and OEM Support Installation/Commissioning. (g.) De-Commissioning of old existing Incinerator system package and all service lines to the facility.

• Ensure HSE compliance in the delivery of the tasks and targets by attending HSE meetings and participating in SCC activities. (1.) Participated in daily, weekly and monthly safety meetings

(2.) Fill and submitted SCC form periodically.

2007 - 2008 Senior Tender/Cost Engineer, Oilserv Limited, Port Harcourt- Nigeria NPDC (Oredo Oil & gas Production Optimization and Equipment Lease project) Geometric Power Limited (OZA Field Development Project - 6inch Pipeline 23.5km) Shell (Integrated Pipeline Maintenance Repair Services) Main duties/Responsibilities are;

• Liaising with the different disciplines in collating data for preparation of invoices within the specified period.

• Regularly generating reports on materials issued, used and returned.

• Saving cost to the company by providing efficient control via comparing actual and planned man-hours as specified in the contract document.

• Checking vendor prices and confirming suppliers’ prices to be in conformity with approved company prices.

• Support senior Manager Tender and control in change order management.

• Timely Preparation of periodic interim valuations payments to the company as specified in the contract document.

Al Asab Habshan Camp No.3 Abu Dhabi, Al Dhafra, UAE Phone: +971*********, +234**********, +234********** E-mail adp77i@r.postjobfree.com

Skype: adp77i@r.postjobfree.com

6

• Monitoring cost and Expenditure on project execution and reporting same to the contract manager regularly.

• Promptly and timely Preparations of various variations account and final account payment due to the company as required by the contract document.

• Preparation and Packaging of pre-qualification documents for tendering processes.

• Timely Preparation of commercial Tenders (Pipeline and Facilities) for award of contracts and all projects to be undertaken.

• Ensure HSE compliance in the delivery of the tasks and targets by attending HSE meetings and reporting incident as it arises.

2006 - 2007 Quantity Surveyor/Estimator, Amber Resources (Nig.) Ltd, Port Harcourt- Nigeria Acergy - (Fabrication of Gas bottle rack, Gangway platform stairs, handrails etc.) Addax - (Adanga South & North Platform- Deck extension, boat landing, walkways etc.) Chevron - (Fabrication of Gas bottle rack, Waste Skip, Escravos gas to liquid tender etc.) Ensco- (Fabrication of Access walkway, Barite Tank Relocation & piping works) Shell/Snepco -( Fabrication of Gas bottle rack, 20inch Spool installation) Technip - (Flare Tower Main Fabrication)

Prosafe -(Fabrication 8inch Pig Receiver & launcher, Floating Jetty-Pontoon) Ladol - (Fabrication of Waste skip, Floating Jetty-Pontoon, SS7 Subsea Sea fastening) Main duties/Responsibilities are;

• Preparation of bill of quantities from AFC drawings (Structural/Piping) for award of contracts, and all projects to be undertaken.

• Regularly generating reports on materials issued, used and returned.

• Saving cost to the company by providing efficient control via comparing actual and planned man-hours as specified in the contract document.

• Checking vendor prices and confirming suppliers’ prices to be in conformity with approved company prices.

• Support senior Manager Tender and control in change order management.

• Timely Preparation of periodic interim valuations payments to the company as specified in the contract document.

• Monitoring cost and Expenditure on project execution and reporting same to the contract manager regularly.

• Promptly and timely Preparations of various variations account and final account payment due to the company as required by the contract document.

• Periodical development of cost breakdown for new projects and ongoing projects.

• Reconciliation of stock items with book quantity through waybills and materials received reports.

• Preparation and Packaging of pre-qualification documents for tendering processes.

• Timely Preparation of commercial Tenders for fabrication related scope of works for award of contracts.

• Pricing of unpriced BOQ for tendering purpose.

• Ensure HSE compliance in the delivery of the tasks and targets by attending HSE meetings and reporting incident as it arises.

Al Asab Habshan Camp No.3 Abu Dhabi, Al Dhafra, UAE Phone: +971*********, +234**********, +234********** E-mail adp77i@r.postjobfree.com

Skype: adp77i@r.postjobfree.com

7

2002 - 2006 Assistant Quantity Surveyor, Bussdor & Company Ltd, Port Harcourt- Nigeria NDDC- (Shore Protection works Sheet Piling, Concrete works etc., 174 rooms Hostel construction, Canalization etc.)

Shell- (Nurse Staff Quarters)

Abia State Government (Construction of Metallurgical Complex) Main duties/Responsibilities are;

• Reduction in waste of materials needed on site by preparing material Schedules and monitoring materials used as against the quantity supplied.

• Promptly and timely Preparations of various variations account and final account payment due to the company as required by the contract document.

• Preparation of bill of quantities from AFC drawings for award of contracts

(Building, Drainage/ erosion control projects).

• Monitoring cost and Expenditure and reporting it to the contract manager.

• Saving cost to the company, by vetting on all sub- contractors’ quotations adequately before payments are made.

• Sourcing and procurement of construction materials.

• Pricing of unpriced BOQ for tendering purpose.

• Preparation and Packaging of pre-qualification documents for tendering processes.

• Supervision of renovation works.

EDUCATION

• HND, Quantity Surveying, Yaba College of Technology, Lagos State Nigeria - 2001

• OND, Building & Quantity Surveying, Federal Polytechnic Ede Osun State Nigeria - 1998 REGISTRATIONS/AFFILIATIONS

• Probationer Member Nigerian Institute of Quantity Surveyor (NIQS)

• Member Association for Advancement of Cost Engineering International (AACEI) SKILLS

Use of MS Excel, Words, Projects, Power Point, AutoCAD, Cumulus PMO Al Asab Habshan Camp No.3 Abu Dhabi, Al Dhafra, UAE Phone: +971*********, +234**********, +234********** E-mail adp77i@r.postjobfree.com

Skype: adp77i@r.postjobfree.com

8

REFERENCES

Mrs. Ota Idara Peters

Cost Controller Manager

Amber Resources (Nig.) Limited

Kilometer 1, Eleme/Onne Road

Port Harcourt, Rivers State.

Tel: +234**********

Engineer Mutiu Balogun

Project Director

DeltaAfrik Engineering Limited

4 Freedom Road, 3rd Roundabout Lekki

Expressway, Ikate Lekki Phase 1

Lagos, Nigeria

Tel: +234**********.

Email: adp77i@r.postjobfree.com