Mahendra Kumar verma
E-mail : *********@*****.***
Mobile : +91-993*******,975-***-****
Total experience: 7.8 Years exp of erection WHRB Projects.
PRESENT ORGANIZATION:
Randstad India Pvt.Ltd .
Engineer (Mechanical) from May-2019 to till date.
PREVIOUS ORGANIZATION:
Dayanidhi energy services pvt ltd. Engineer (Mechanical) from Jan-2017 to April-2019.
PREVIOUS ORGANIZATION:
M/s. Tambee Erectors, as
Engineer (Mechanical) from Jun -2014 to Dec- 2016.
EDUCATION:
BE in Mechanical Engineering with 70.55% (First class) year of 2014 from Columbia Institute of Engg. &Technolgy Raipur (C.G)
H.S.S. – With 63.2% year of 2009 from Govt.H.S.School Hathbandh, Raipur, Chhattisgarh.
H.S. – With 64.34% year 2007 from Govt. high School Nawapara, Raipur, Chhattisgarh.
Hobbies:
Playing Cricket, Listening Music
PERMANENT ADDRESS:
Vill :- Satbhanwa, PO:- Bhainsa, Tehsil:- Tilda, Distt :- Raipur (C.G.) 493113
FATHER’S NAME : Mr. Taplal Verma
DATE OF BIRTH : 12.06.1991
LANGUAGES KNOWN : English, Hindi,
NATIONALITY : India
MARITAL STATUS : Married
CURRICULUM VITAE
OBJECTIVE:
A Young and Dynamic Engineer with in depth experience in Fabrication, Erection and Maintenance of Captive Power plants(CPP) & WHRB willing to join an organization where growth is a way of life and seeks a position which will offer me all kind of challenges to exploit my skills fully and improve them.
As an Engineer – Power Projects:
Successfully executed the Erection of WHRS Boiler,ACC and its pipings.
Managed a team of Engineers / Staff and instilled in them confidence to realize maximum productivity levels.
PROFESSIONAL EXPERIENCE:
7.8 years of experience in Erection of Waste Heat Recovery System & AFBC Boiler.
Erection and commissioning of Air cooled condenser(ACC) system for WHRS.
Erection of AQC & PH boiler for WHRS system including Erection of Pressure parts,Intergral Piping, Non pressure part, Inlet & Outlet ducting with dampers, Conveying system.
Erecction of External piping with pipe rack from boiler to TG.
Involved in Commissioning of ACC and Boilers i.e leak test, Refractory Dry Out, Alkali Boil out and steam blowing.
TECHNICAL RESPONSIBILITIES:
Execution as per erection plan .
Daily Manpower planning and deputation as per target .
Ensuring site quality and inspection for QC checking as per define norms.
Ensuring safety during site execution.
Protocol preparation as per QAP.
DPR generation as per site progress.
Material follow up with vendor .
M/s Dalmia Cement Bharat Ltd. Rajgangpur(Odisha),Kadapa(AP) & Karnataka (Belgaum)
SR.NO
PROJECT
DURATION
ROLE & RESPONSIBILITIES
1
2
3
(14 MW) WHR Boiler
Line III Odisha Rajganjpur
(12.1 MW) WHR Boiler Andhra pradesh (Kadapa)
(9.2MW) WHR Boiler Karnataka (Belgaum)
May 2019
TO
Till Date
Same the below role and responsibility and.
Erection of TG piping(Oil & Steam)
Erection of BOP System and Aux Cooling Tower.
Project Experience:-
M/s Shree Cement Ltd.Raipur (Chhattisgarh)
SR.NO
PROJECT
DURATION
ROLE & RESPONSIBILITIES
1
2
M/s Shree cement Ltd. Baloda bazar, Raipur. (27MW) WHR Boiler
Line II
ACC fabrication and erection (27MW) GPP2
Jan 2017
TO
Sep 2018
Sep 2018
To April 2019
Application of refractory in cooler duct (Boiler Inlet).
Erection AQC Boiler Structure, pressure parts and its pipings.
Erection of PH boiler Structure, pressure parts and its pipings.
Erection of PH boiler inlet and outlet duct.
Project Experience:
M/s Tambee erectors, Chhattisgarh.
SR.NO
PROJECT
DURATION
ROLE & RESPONSIBILITIES
1
2
M/s Shree cement Ltd. Baloda bazar,Raipur. (18MW) AFBC Boiler.
M/s Shree cement Ltd. Baloda bazar, Raipur. (27MW) WHR Boiler
Line I
Jun 2014
TO
Dec 2016
As SITE ENG Involved in Erection of FBC Boiler pressure parts and non-Pressure parts.
Erection of HP piping’s such as Feed water piping’s, steam piping’s and PRDS piping’s.
Erection of 15 cell 3street Air Cooled Condenser.
DECLARATION
I hereby declare that the details furnished above are true and correct to the best of
My knowledge and belief.
Date :
Place : (MAHENDRA KUMAR VERMA