G.LINGESWARAN
Email:************@*****.***
Cell :967-***-****
s/o P.GANESAN
*/***,***************** ******
Kamuthakudi post
Paramakkudi(Tk)
Ramanathapuram district -623707
I intent to build my career innovatively with a leading corporate of new environment which will help me to fully realize my extreme potential and work with best technical skills.
COURSE
INSTITUTION
YEAR OF PASSING
H.S.C
A.V. Hr.SecSchool,Paramakkudi
March 2003
DEEE
SriMuthalamman polytechnic college, Paramakkudi
April 2006
BE
Alagappachettiar college of Engineering and Technology, Karaikkudi
Dec 2011
Working as a Electrical Supervisor in Electrical Maintenance and Meter & Relay Testing in Valuthoor
Gas Turbine Power Plant Combined Cycle TNEB (92mw) April 2006 to 2007 and April 2010 till to date.
Working as a Dcs and field Operator in Valuthoor Gas Turbine Power Plant (92mw) April 2008 to 2010
TAMILNADU ELECTRICITY BOARD (one year apprentice trainee period from 07.04.2007 – 06-04-2008)
Preventive and break down maintenance, auxiliary equipments and utilities.
Regular inspection and preventive maintenance of all switch yard equipments and electrical panels.
Report to the shift in charge and executes the job through Asst. Engineeers in TNEB.
Operation and maintenance of power transformer (2 mva, 10 mva, 40 mva and 80 mva), excitation transformer (650 kva) and SFC transformer (1600 kva).
Operation and Maintenance of diesel generator (1010kva).
Operation and maintenance of Circuit breakers such as SF6 circuit breakers (110kv,11kv), vaccum circuit breakers (6.6kv) and air circuit breakers.
Responsible for operating and maintaining the plant equipment such as 3-Phase induction motors, starters, control panels, current transformers, potential transformers, lighting, charger, battery etc.
Investigate problems and recommend solutions
Ensure compliance with safety requirements and standard procedures.
Maintain a demand of all required electrical material and quantity of material.
PLANT PROFILE:
GAS TURBINE:
Make : ANSALDO ENERGIA (ITALY)
Total capacity : 60 MW
STEAM TURBINE:
Make : QJPS (CHINA)
Total capacity : 33 MW
Governor : WOODWARD
WASTE HEAT RECOVERY BOILER:
Make : ALSTOM PROJECTS INDIA PVT LTD
Total capacity : 97 TPH
Steam drum : 3 DRUM (HP, IP, LP)
ROLES & RESPONSIBILITIES:
1.Currently spearheading efforts with VALUTHUR GAS TURBINE POWER STATION (95mw combined cycle plant) as Field Engineer.
2.Responsible For Operation and Maintenance of Gas turbine, Steam turbine, HRSG, ACC, ACHE and accessories.
3.Maintaining the equipment such as boilers, pumps, cooling towers, gas and steam turbine generator for their smooth operation.
4.Regulating dampers, water level in boilers and fuel supply. Checking steam gauge and water gauge to see that sufficient steam pressure is generated, maintaining proper temperature of condensing water.
5.Ensuring all stand by pumps are always in good and warm up condition.
6.Checking the components for any leakages, malfunctioning, defects, damages etc. Ensuring timely repairs of the deficiencies.
7.Monitoring and recording the plant performance.
8.Trouble shooting the problem that arises in DCS.
9.Calculating the Export and Import Of power daily in Accordance with Company Procedures and Instructions.
10.Maintaining all Records/Reports and the timely preparation of same in accordance with requirement.
Diploma :
Automatic measuring and wire cutting
BE:
Energy savings in streetlights with puls with modulation.
Design : Auto cad
Packages : MS Office.
Operating System : Windows 7, Windows XP & Vista.
Achievements:Runner inkabadi conducted by Neruyuvahaendra
Hobbies : Reading Books, Playing Cricket &Kabadi
Father’s Name : Mr. P.GANESAN
Mother’s Name : Mrs.G.JAYALAKSHMI
Date of Birth : 05.04.1986
Sex : Male
Nationality : INDIAN
Languages Known : Tamil, English .
It is hereby declare that theabove information furnished is trueto the best of my knowledge and belief and it given an opportunity. I shall work for the fullest satisfaction of allpersonnel.
Date:
Place:
(G.LINGESWARAN)
OBJECTIVES
PROFESSIONAL QUALIFICATION
WORK EXPERIENCE
JOB RESPONSIBILITIES
CONTROL ROOM OPERATOR : APRIL 2008 TO 2010
PROJECTS
PROJECTS
SOFTWARE FAMILIARITY
EXTRA:
PERSONAL PROFILE:
DECLARATION: