RESUME
SUSHANTASAHA
Vill.&P.O.-ChowdharyHat-Pin-736166Dist-CoochBehar
WestBengal
EMAILID;****.***********@*****.***
Mob-844-***-****/+919*********
CAREEROBJECTIVE
ToworkwithandbeapartofsuchanOrganizationwhereingrowth,opportunityare blendwithrichlearningprocess.
Qualification:3-YearsDiplomainCivilEngineeringintheyear2012. Experience:22yearsofexperienceinvariousInfrastructureProjectslikeBridges, NATMTunnels,TBMworks,Damworks,RoadworksandMetroRail Construction.
CURENTDESIGNATION:CIVILSENIORFOREMAN(CADRE–TC7)
CurrentEmployer:June-2018ToTillDate-L&TConstructionLtd.,Heavycivil infrastructureIC
WDFCC15ASPECIALSTEELBRIDGEOFINDIANRAILWAYS
Location:-Par(BR.60)Gujarat
WorkProfile:-Constructionofwellfoundationand1500mmDiaPilefoundatin, bottomplug,wellcap,pier,piercap,Jettyworksetc..
JobResponsibility:-
1. Supervisionofreinforcementfixingworkasperdrgs.
2. Shutteringfixingandprofilingandconcretingwork.
3. Makinglabourreportandsubmittoconcernondailybasisandto calculateweeklyrequirementofmaterialsandmachineryandreporttosenior. 4.Concretingworks.
1) JKIL-CRTG(JV)
ProjectName:-ContractCC-24:-Design&ConstructionofTunnelbyShieldTBM, Tunnel,Stations&RampbyCut&CovermethodbetweenLajpatNagar&HazratNizam uddinStations(Bothincluding)forundergroundworksonMukundpur-YamunaVihar CorridorofDelhiMRTSProjectofPhase-III.
Designation:“Sr.Forman(Civil)”.
Location:CC-24DelhiMetroUGProject.
Duration:October2014toJune2018.
WorkProfile-ConstructionofGuidewal,Diaphragmwal,plungecolumn,shearpin,dw alanchor,sheetpile,soldierpile,slab,beam,excavationwork,SoilInvestigation,Utility Diversion,roaddiversionforVinobaPuriundergroundmetrostation. ProjectName:-ContractCC-02:-ConstructionofViaductandtwoElevatedStations-- RohiniSector18andBadliofDelhiMRTSProjectofPhase-III. Designation:“Sr.Forman(Civil)”.
Location:CC-02DelhiMetroElevatedProject.
Duration:August2012toOctober2014.
WorkProfile-SiteExecutionwhichincludesPiling,Columns,Beams,Pieractivities, I-Girder,Pierarms&finishingworks.
2) FromOct2010ToAugust2012:M/sSEWInfrastructureLtd. Project :MumbaiMetroRailProject
Client :MumbaiMetroOnePvt.Ltd.
Scope :ConstructionofMumbaiMetroCableStayedBridge
CrossingWesternExpressHighway
JobResponsibility:-
1-Supervisionofreinforcementfixingworkasperdrawings. 2-Shutteringfixingandprofilingandconcretingwork.
3-Makinglabourreportandsubmittoconcernondailybasis. 4-Tocalculateweeklyrequirementofmaterialsandmachinery&reporttosenior. 3) FromApril2008to1stOctober2010.:M/sALPINE-SAMSUNG-HCCJVasa MasterForman
Project:AirportMetroExpressLine-C1
Client:M/sDelhiMetroRailCorporationLTD.
ProjectCost:775Crores
Scope :ConstructionofTwoundergroundmetrostation(NewDelhi& Shivaji)DesignandBuildfor3.75kmTwinTunnelfromnewDelhimetrostationto TallkatoraStadium.
WorkProfile:Executetheworkasperconstructiondrawing,Experiencein constructionofMetroproject,UndergroundtunnelingbyusingNATMmethod. SupervisionofworkforconstructionofStationBuildingandDiaphragmWal, BarrettepileCastingofSlab(Top-DownandBottom-UPmethod)ExecutionofWater- Proofingwork,EarthWork.
TunnelWork(TBM):CrossPassage,InvertConcrete,TunnelBreakthrough ArrangementandReceivingchamber,OTEPrecastPanelcasting(OverTrack Exhaust),ErectionofOTEBox,AlignmentandgroutingofOTEPanelenablingworks
(AreaacquiringforConstructiondepot,temporarydeckingforconstruction). NATMtunnelworkattallkatoragarden.
**TBMinvolvingactivatesSegment,GroutingofproofdrilinginTunnelandLips&StepsbetweenRingBuilt.
**UsingNATM(NewAustrianTunnelingMethod),steelgirdersandShotcretingsystem,self-drilRockBoltdriling
.Tamgroutingforsettlementproneareaandalkindofsafetycontrol,qualitycontrolsofmaterialsand workmanshipco-ordinationwithcontractors,draftingofsiteminutesofsitemeetingsandsitedocumentation. Jobresponsibility-
1. Supervisionofreinforcementfixingworkasperdrgs.
2. Shutteringfixingandprofilingandconcretingwork.
3. MakinglabourreportandsubmittoconcernondailybasisandTo calculateweeklyrequirementofmaterialsandmachineryandreportto senior.
4. Activelyinvolvedtopilingactivity.
4) FromJan2007toApril2008:Leighton-OSEJVatIndore-KhalghatRoad ProjectinthestateofMadhyaPradesh.
NameofProject :RehabilitationandUpgradingofNH-3to4-Lane Configuration(Km.0to73)betweenIndoreandKhalghatin
thestateofMadhyaPradesh.
Clint :NationalHighwayAuthorityofIndia.
Consultant :PMC-ICJV
Jobresponsibility-
TheworkdaytodaysupervisionofMajorBridge,MinorBridge,BoxBridge,Box Culvert.
5) Nov2004toJan2007M/SHindustanConstructionCompanyLtd. NameofProject :AlahabadbyPassProjectNH-2inthestateofUttar Pradesh
Clint :NationalHighwayAuthorityofIndia.
Consultant :BCOMLASA
JobResponsibility:-
SupervisionworkforReinforcement,Shuttering,Concreting,Leveltransferringetc. MajorBridge,MinorBridgeandCulverts.
6) FromApril2003toNov2004KSHI-JV(KUMAGAI-SKANSKA-HCC-ITOCH U)GROUP
NameofProject: UndergroundMetroCorridor(MC-1A)fromISBTto ViswavidyalayaStation.
Clint: DelhiMetroRailCorporation.
Consultant: G.C
JobResponsibility:-
SupervisionworkforSheetPiling,PileSinking,DiaphragmWal,Solderpile. NATMtunnelworkfromvidhansabhatoviswabidyalaya.
**ResponsiblefortheconstructionactivitiesinvolvedinNATMmethodincludingdriling,charging,blasting, mucking,shotcreting,rock-boltinstalationandselfdrilrockboltdriling,wire-meshinstalation,etc.
**Responsibleforworkof-Waterproofingmembranefixing,Erection&fixingofGantry.
**ProgressReports,checklistsforshotcreting,driling&blasting,wire-meshinstalation,etc 7) FromApril1999toMarch2003M/SHindustanConstructionCompanyLtd. NameofProject :TALAHydroelectricProject(BHUTAN)
Clint :TalaHydroelectricProjectAuthority(THPA)
Consultant :TalaHydro-electricProjectAuthority
JobResponsibility:
WorkedasAsst.Leveler(Survey),ExperienceinconstructionofHydroelectricpower project,UndergroundtunnelingbyusingNATMmethod,TunneldrillingandBlasting, Damconcreting,ConcretingwithGantrymachine,ShortcretingConcreteetc. Responsibilities:
**ResponsiblefortheconstructionactivitiesinvolvedinNATMmethodincludingdriling,charging,blasting,mucking, shotcreting,rock-boltinstalation,wire-meshinstalation,etc.
**Monitoredthevariousslopeprotectionprocessesbeingexecutedincludingstonemasonryand reinforcedshotcreteprotectionwithrockbolts,drainagepipe,weepholeinstalation.
**Driling(workingoutDriling&Blastingpatterns)andsplittingofrocksbyRockSplitter(MAKEDARDA).Cavity treatment,forepolinglatticegirder&wiremeshfixingtothefaceforstability,selfdrilRockBoltdriling(MAIROD).
**LevelingCourse&Tunnellining.
PersonalDetails:
Father'sname : ShriSubalCh.Saha
DateofBirth : 01/02/1978
JobExperience : 22Years
LanguageProficiency : English,Hindi&Bengali
Nationality : Indian
MaritalStatus :. Married
PermanentAdd. : Vill.&P.O.-ChowdharyHat
Distt-CoochBehar
WestBengal Pin-736166
Email:****.***********@*****.***
DATE:
PLACE:Gujarat(VALSAD) (SUSHANTASAHA)