Post Job Free
Sign in

Consultant Civil

Location:
Ahmedabad, Gujarat, India
Posted:
February 09, 2022

Contact this candidate

Resume:

RESUME

SUSHANTASAHA

Vill.&P.O.-ChowdharyHat-Pin-736166Dist-CoochBehar

WestBengal

EMAILID;****.***********@*****.***

Mob-844-***-****/+919*********

CAREEROBJECTIVE

ToworkwithandbeapartofsuchanOrganizationwhereingrowth,opportunityare blendwithrichlearningprocess.

Qualification:3-YearsDiplomainCivilEngineeringintheyear2012. Experience:22yearsofexperienceinvariousInfrastructureProjectslikeBridges, NATMTunnels,TBMworks,Damworks,RoadworksandMetroRail Construction.

CURENTDESIGNATION:CIVILSENIORFOREMAN(CADRE–TC7)

CurrentEmployer:June-2018ToTillDate-L&TConstructionLtd.,Heavycivil infrastructureIC

WDFCC15ASPECIALSTEELBRIDGEOFINDIANRAILWAYS

Location:-Par(BR.60)Gujarat

WorkProfile:-Constructionofwellfoundationand1500mmDiaPilefoundatin, bottomplug,wellcap,pier,piercap,Jettyworksetc..

JobResponsibility:-

1. Supervisionofreinforcementfixingworkasperdrgs.

2. Shutteringfixingandprofilingandconcretingwork.

3. Makinglabourreportandsubmittoconcernondailybasisandto calculateweeklyrequirementofmaterialsandmachineryandreporttosenior. 4.Concretingworks.

1) JKIL-CRTG(JV)

ProjectName:-ContractCC-24:-Design&ConstructionofTunnelbyShieldTBM, Tunnel,Stations&RampbyCut&CovermethodbetweenLajpatNagar&HazratNizam uddinStations(Bothincluding)forundergroundworksonMukundpur-YamunaVihar CorridorofDelhiMRTSProjectofPhase-III.

Designation:“Sr.Forman(Civil)”.

Location:CC-24DelhiMetroUGProject.

Duration:October2014toJune2018.

WorkProfile-ConstructionofGuidewal,Diaphragmwal,plungecolumn,shearpin,dw alanchor,sheetpile,soldierpile,slab,beam,excavationwork,SoilInvestigation,Utility Diversion,roaddiversionforVinobaPuriundergroundmetrostation. ProjectName:-ContractCC-02:-ConstructionofViaductandtwoElevatedStations-- RohiniSector18andBadliofDelhiMRTSProjectofPhase-III. Designation:“Sr.Forman(Civil)”.

Location:CC-02DelhiMetroElevatedProject.

Duration:August2012toOctober2014.

WorkProfile-SiteExecutionwhichincludesPiling,Columns,Beams,Pieractivities, I-Girder,Pierarms&finishingworks.

2) FromOct2010ToAugust2012:M/sSEWInfrastructureLtd. Project :MumbaiMetroRailProject

Client :MumbaiMetroOnePvt.Ltd.

Scope :ConstructionofMumbaiMetroCableStayedBridge

CrossingWesternExpressHighway

JobResponsibility:-

1-Supervisionofreinforcementfixingworkasperdrawings. 2-Shutteringfixingandprofilingandconcretingwork.

3-Makinglabourreportandsubmittoconcernondailybasis. 4-Tocalculateweeklyrequirementofmaterialsandmachinery&reporttosenior. 3) FromApril2008to1stOctober2010.:M/sALPINE-SAMSUNG-HCCJVasa MasterForman

Project:AirportMetroExpressLine-C1

Client:M/sDelhiMetroRailCorporationLTD.

ProjectCost:775Crores

Scope :ConstructionofTwoundergroundmetrostation(NewDelhi& Shivaji)DesignandBuildfor3.75kmTwinTunnelfromnewDelhimetrostationto TallkatoraStadium.

WorkProfile:Executetheworkasperconstructiondrawing,Experiencein constructionofMetroproject,UndergroundtunnelingbyusingNATMmethod. SupervisionofworkforconstructionofStationBuildingandDiaphragmWal, BarrettepileCastingofSlab(Top-DownandBottom-UPmethod)ExecutionofWater- Proofingwork,EarthWork.

TunnelWork(TBM):CrossPassage,InvertConcrete,TunnelBreakthrough ArrangementandReceivingchamber,OTEPrecastPanelcasting(OverTrack Exhaust),ErectionofOTEBox,AlignmentandgroutingofOTEPanelenablingworks

(AreaacquiringforConstructiondepot,temporarydeckingforconstruction). NATMtunnelworkattallkatoragarden.

**TBMinvolvingactivatesSegment,GroutingofproofdrilinginTunnelandLips&StepsbetweenRingBuilt.

**UsingNATM(NewAustrianTunnelingMethod),steelgirdersandShotcretingsystem,self-drilRockBoltdriling

.Tamgroutingforsettlementproneareaandalkindofsafetycontrol,qualitycontrolsofmaterialsand workmanshipco-ordinationwithcontractors,draftingofsiteminutesofsitemeetingsandsitedocumentation. Jobresponsibility-

1. Supervisionofreinforcementfixingworkasperdrgs.

2. Shutteringfixingandprofilingandconcretingwork.

3. MakinglabourreportandsubmittoconcernondailybasisandTo calculateweeklyrequirementofmaterialsandmachineryandreportto senior.

4. Activelyinvolvedtopilingactivity.

4) FromJan2007toApril2008:Leighton-OSEJVatIndore-KhalghatRoad ProjectinthestateofMadhyaPradesh.

NameofProject :RehabilitationandUpgradingofNH-3to4-Lane Configuration(Km.0to73)betweenIndoreandKhalghatin

thestateofMadhyaPradesh.

Clint :NationalHighwayAuthorityofIndia.

Consultant :PMC-ICJV

Jobresponsibility-

TheworkdaytodaysupervisionofMajorBridge,MinorBridge,BoxBridge,Box Culvert.

5) Nov2004toJan2007M/SHindustanConstructionCompanyLtd. NameofProject :AlahabadbyPassProjectNH-2inthestateofUttar Pradesh

Clint :NationalHighwayAuthorityofIndia.

Consultant :BCOMLASA

JobResponsibility:-

SupervisionworkforReinforcement,Shuttering,Concreting,Leveltransferringetc. MajorBridge,MinorBridgeandCulverts.

6) FromApril2003toNov2004KSHI-JV(KUMAGAI-SKANSKA-HCC-ITOCH U)GROUP

NameofProject: UndergroundMetroCorridor(MC-1A)fromISBTto ViswavidyalayaStation.

Clint: DelhiMetroRailCorporation.

Consultant: G.C

JobResponsibility:-

SupervisionworkforSheetPiling,PileSinking,DiaphragmWal,Solderpile. NATMtunnelworkfromvidhansabhatoviswabidyalaya.

**ResponsiblefortheconstructionactivitiesinvolvedinNATMmethodincludingdriling,charging,blasting, mucking,shotcreting,rock-boltinstalationandselfdrilrockboltdriling,wire-meshinstalation,etc.

**Responsibleforworkof-Waterproofingmembranefixing,Erection&fixingofGantry.

**ProgressReports,checklistsforshotcreting,driling&blasting,wire-meshinstalation,etc 7) FromApril1999toMarch2003M/SHindustanConstructionCompanyLtd. NameofProject :TALAHydroelectricProject(BHUTAN)

Clint :TalaHydroelectricProjectAuthority(THPA)

Consultant :TalaHydro-electricProjectAuthority

JobResponsibility:

WorkedasAsst.Leveler(Survey),ExperienceinconstructionofHydroelectricpower project,UndergroundtunnelingbyusingNATMmethod,TunneldrillingandBlasting, Damconcreting,ConcretingwithGantrymachine,ShortcretingConcreteetc. Responsibilities:

**ResponsiblefortheconstructionactivitiesinvolvedinNATMmethodincludingdriling,charging,blasting,mucking, shotcreting,rock-boltinstalation,wire-meshinstalation,etc.

**Monitoredthevariousslopeprotectionprocessesbeingexecutedincludingstonemasonryand reinforcedshotcreteprotectionwithrockbolts,drainagepipe,weepholeinstalation.

**Driling(workingoutDriling&Blastingpatterns)andsplittingofrocksbyRockSplitter(MAKEDARDA).Cavity treatment,forepolinglatticegirder&wiremeshfixingtothefaceforstability,selfdrilRockBoltdriling(MAIROD).

**LevelingCourse&Tunnellining.

PersonalDetails:

Father'sname : ShriSubalCh.Saha

DateofBirth : 01/02/1978

JobExperience : 22Years

LanguageProficiency : English,Hindi&Bengali

Nationality : Indian

MaritalStatus :. Married

PermanentAdd. : Vill.&P.O.-ChowdharyHat

Distt-CoochBehar

WestBengal Pin-736166

Mob-844-***-****/997*******

Email:****.***********@*****.***

DATE:

PLACE:Gujarat(VALSAD) (SUSHANTASAHA)



Contact this candidate