WORK EXPERIENCED
JOB DISCRIPTION
MANPOWER PULLING
ERECTOR: Elevator:site survey, shaft elevator 9deminsion checking,template,marking boring,fixing welding bracket main rail, cwt rail,rail set car panel,traction machine set, wiring fixing
Maintenance Elevator: (PPM) Stand by for call back,Special service for replace of parts of elevator
Aircon maintenance: (PPM) REPLACE AND REPAIR
Erector of aircon etc.
COMPANY: I.E.E.I
(International Elevator Equipment Inc)
POSITION: Manpower pulling,Elevator Installer
LOCATION: Cupang Sucat,Muntinlupa City Phil.
DURATION:Oct 6,1998-Jan 28,2004
PROJECT:Oakwood Hotel,Robinsons Galleria Ortigas JJ Summit (philam life Bldg), Ayala Triangle,All City Land Bldg Rich Tower,Tuscany Bldg,Peninsula Hotel,RCBC Bldg,Pearl Plaza
CONTACT PERSON:Miss Miles POSITION:HR Manager CONTACT NO:843-31-61
COMPANY: SBTMC LTD (Saudi Bldg Technic Maintenance Corp.LTD)
POSITION:Elevator Service Techanician
LOCATION:Riyadh KSA
DURATION:May 27,2004-july 2,2007
PROJECT:ALL Imam University (1 project consumed 150 Units)
CONTACT:Bernie De Castro
POSITION:SITE Engineer
JOB DISCRIPTION
Maintenation Service Technician: (PPM) night shift duty for stand by for call back.in repair,trouble shooting
.
MPANY:ASIA PTS Elevator.Inc
POSITION:Technician/Mechanic on a project
On call basis
LOCATION:Boni.Ave.Mandaluyong Phil
DURATION:Jan 15,2008-June 15,2008 (finished Contract)
PROJECT:Robinsons Galleria Ortigas,Tutuban Mall
Divisoria Mall
CONTACT:HR Dept.
POSITION:HR
JOB DISCRIPTION
Maintenance service Technicians,Special Service for replace and repair,stand by for call back (Any type elevator)
COMPANY:HAMM NAJD EST.for trading
(ochen elevator & Escalator)
POSITION:Elevator Intaller & Adjuster
Maintenance Elevator Technician
LOCATION:Riyadh Saudi Arabia
DURATION:May 18,2009-May 30,2011
PROJECT:All over the kingdom
CONTACT:Mr.Mohammad Ibrahim
POSITION:HR Manager
CONTACT NO:+663-*******
JOB DISCRIPTION:
Elevator in installer.is local type elevator only 10 floor maximum and minimum 5 floor
Maintenance service Technician (PPM) stand by call back. Repair, replace parts of elevator.
COMPANY:KONE ELEVATOR &ESCALATOR LLC
POSITION:Elevator Installer,Assnt.Testing
Commisioning Adjuster
LOCATION:Doha Qatar
DURATION:Dec 26,2011-Nov 10,2014
PROJECT:China Tower(Doha) Islamic Bldg
Residential Housing
CONTACT:Ram Saravanan
POSITION:HR Manager
Email Add:adp27b@r.postjobfree.com
JOB DISCRIPTION:
ERECTOR OF ELEVATOR:Site survey.Shaft dimension checking,Assemble scaffold. Template assemble the basebracket, main, cwt,car panel assemble,shaft wiring up to adjustment.
Testing commissioning elevator:we do to testing.we rectifier all n the wiring .and penal adjustment all mechanical.before hand over to the owner
COMPANY:KPI ELEVATOR INC.
Kone Elevator Phil
POSITION:Elevator Installer Adjuster
LOCATION:Makati city phil
DURATION:Sept 30,2015-Jan 30,2016
PROJECT:Global City
CONTACT:HR.Dept
POSITION:HR Manager
CONTACT:(02) 811 2930
JOB DISCRIPTION:
Elevator installer: site survey,check the drawing of elevator,template,check protocol, marking boring bracket and RAIL. Hoistway door,Setting Traction machine,elevator cabin safety gear elevator,shaftwiring
Final adjustment all mechanical
Testing commissioning
Double check elevator before hand over to owner
COMPANY:ThyssenKrupp Elevator UAE LLC
POSITION:Elevator Installer adjuster
Sr.Technician
LOCATION:Dubai UAE
DURATION:April 8,2016-Aug 22,2016
Finished project,Transfer to Thyssenkrupp
Sister company in Kuwait
PROJECT:Opera House Bldg.
POSITION:HR Manager
CONTACT:Thorsten Sickelman
POSITION:HR & Admin Manager
Email add:adp27b@r.postjobfree.com
JOB DISCRIPTION
ELEVATOR INSTALLER: We Install Stage Elevator dubia
COMPANY: Hyatt Elevator
POSITION:Elevator Installer Adjuster
LOCATION:Mandaluyong City Phil.
DURATION:Nov 16,2016-Feb 13,2017
PROJECT:Urban DECA Homes (tondo)
CONTACT:Noel Caliwag
POSITION:Proj.Manager
CONTACT:(006*-***-***** to 68
JOB DISCRIPTION:
ELEVATOR INSTALLER:we perform site survey and shaft elevator dimension check per as drawing regermennt
COMPANY:WN Cabanban Engineering Service
(Sub-con of OTIS)
POSITION:Elevator Foreman
LOCATION:Tunasan Muntinlupa City Phil.
DURATION:May 10,2017-July 29,2017
PROJECT:Tagaytay Highlands
CONTACT:Tammy Tamayo
POSITION:CO-Owner
JOB DISCRISPTION
FOREMAN,I Handle site also my co worker.my responsible are to implement the safety.PPE, Installation method,5S,take2 take5.and ZERO ACCIDENT.
COMPANY:Fujitec Elevator & Escalator
POSITION:Elevator Installer,Leadman
DURATION:Oct 26,2017- March 25,2018
PROJECT:AVIDA Tower,The Rise Bldg
CONTACT:HR Dept.
POSITION:HR Manager
CONTACT NO:(02)893 3734
FAX: (02) 818 0002
JOB DISCRIPTION:
LEADMAN: my responsibility to my co worker to implement the safety and zero accident.and I guide them all how to install elevator with out accident in the site and also good quality of work
COMPANY:MACC MODERN ARCH
POSITION:Elevator Technician
LOCATION:Jeddah Thowal
Saudi Arabia KSA
DURATION:March 20,2018 up to present
CONTACT PERSON:Mounir Antar
POSITION:Director Manager
CONTACT NO:+966 055-***-****
Email Add:adp27b@r.postjobfree.com
JOB DISCRIPTION
1ST ELEVATOR TECHNICIAN: PPM,STAND BY TECHNICIAN,TROUBLE SHOOTING,REPAIR AND REPLACE.
Elevator: Hydraulic Elevator,MRL Elevator,garage Door Garbage,Sliding Door,sliding Window
SAFETY OFFCIER: EMPLEMENT SAFETY ALL WORKERS
RECEIVER: RECEIVE AND FROM CALL BACK AND GET SAFETY PERMIT.
ALL AROUND TECHNICIANS
CHARACTER REFERENCES:
1.Wissam Elsoussi
House keeping Manager at MACC
Email Add:adp27b@r.postjobfree.com
2.Noel Caliwag
Project Manager in HYATT Elevator
Montalban Rizal
(006*-****-**** to 68
3. Jenette Bernido
Caregiver Technician
AL Anasban group of companies
Tabuk Saudi Arabia
I Hereby attest that the above information is true and correct to the best of my Knowledge and belief
ALLAN CHRISTOPHER C.TUMACA
Applicant Signature
ALLAN CHRISTOPHER C.TUMACA
2480 me Waling-Waling Ext.Brgy Tunasan Muntinlupa City
Contact no:099********/092*-****-***/+966 055***-****
PERSONAL DATA:
Birth Date: June 27,1974
Sex: Male
Weight: 165 Lbs.
Height: 5’6
Citizenship:Filipino
Civil Status:Married
SSS no:33-5431111-8
TIN Number:201-***-***-***
1.OCCUPATIONAL INTEREST:
It is my outmost privilage to work for such a distinguish company because I will have
The opportunity to apply and develop my skill as contribution for its growth.
EDUCATIONAL BACKGROUND:
ELEMENTARY:Rafael Palma Elementary School
Vito cruz st.Zobel Roxas,Manila 1981-1988
HIGH SCHOOL:Arellano Mabini High School
Menlo Road,Pasay City 1988-1994
VOCATIONAL:Guzman College of Science & Technology
Soler-Calero st. Sta Cruz Manila 1994-2004
Course:DIPLOMA IN ELECTRONICS TECHNOLOGY
SPECIAL SKILLS:
1.Driving
2.Can install and perform preventive maintenance of elevator and escalator units.