ADITYA TIWARI

C/O Shri I.K.Tiwari

**** *** ****** ******,

Garha Jabalpur(M.P.) 482003

Mob. No.930*******

E-mail: adp1zt@r.postjobfree.com

ADITYA TIWARI

Career Objective:

To become a successful professional as an Control and Instrument engineer in a reputed organization of energy sector with an environmental conducive to progressive learning enabling me to contribute for the mutual benefit of myself and of the organization.

Total Experience:

Working as Power Plant Instrumentation Engineer with 12 years experience.

1.Currently working in Adani Power Mundra Ltd.(5X660 MW and 4X330MW) in C&I maintenance.

2.Worked in TRN Energy Ltd (2X300 MW) in C&I maintenance.

3.Worked in Reliance Energy (2X600 MW) DVC RTPS in C&I commissioning.

4.Worked in Sasan Ultra Mega Power Project (6X660 MW) in C&I commissioning & maintenance.

5.Worked in Rosa Thermal power station phase -II (2X300MW) in C&I commissioning.

6.Worked in Parichha Thermal power station Jhansi (2X250MW) in C&I commissioning.

7.Worked in Vedanta Aluminium Limited CPP( 3X30 MW) in C&I maintenance.

Skills:

DCS: 1. Honeywell Experion PKS C300.

2. Yokogawa Centum CS3000.

3. maxDNA(maxVUE Editor and maxDPU Tools).

4. Foxboro FCP-270.

5. ABB Symphony Plus.

6. Emersion Ovation system.

PLC: Allen-Bradley Control Logix RS-5000 & Facory Talk view SE.

Turbine- TSI installation and calibration, ETS,DEH, LVDT, MOOG.

Smart Actuators: Rotork, Auma India, AI/MI and Drehamo (All type of actuators).

Control Valves: Fisher, Forbes-Marshall, ABB .

Special Instruments: O2 Analyzers, Ultrasonic TX, SMC & Fisher Pneumatic Controllers, TSI probes calibration by TK3 Bently Nevada kit.

Responsibility Held:

Adani Power Mundra Ltd. (5X660MW)

Position: Associate Manager C&I March 2020-Till Now

Responsible for C&I shift, field fault diagnosis and online necessary calibration of field instruments(Coal Feeder –Stock 196NT and DT9).

Involved in TSI work during overhauling of Unit 9.

Responsible for implementation and documentation required for SAP.

Responsible for Allen-Bradley PLC(FOPH,DM Plant, Sea Water Intake Pump house.

Awarded for PID loop configuration in 3 nos. VFD in Allen Bradley PLC.

TRN Energy Ltd (2X300MW) August 2016-Feb2020

Position: Manager C&I

Completed TG overhauling, Turbine bearing inspection, including TSI removal and reinstallation and commissioning.

Maintenance of Turbine area instruments by preventive, breakdown & shutdown maintenance. Compliance to breakdown & preventive maintenance schedule, on time.

Maintenance and Calibration of Control Valves with smart and non-smart positioners, tubing and Hydraulic Valves, Solenoid Operated on-off Valves and electrometric safety valves, SWAS Instruments, Radar transmitter, Pressure, Flow and Level transmitter, Level Probes, Vibration Probes(Bently Nevada TK3 kit), Speed sensor.

Spares management for achieving best availability of equipments.

Innovation and initiatives for reduction in consumption, failure and improvement in efficiency and plant operation.

Ensure operator desk, HMI, MIS packages, Logics, engineering station, network redundancy and all other feature of the DCS/PLC system in healthy and active status.

Assist in PID tuning and auto loop commissioning of unit #1(Deaerator pressure control,HP/LP heater level control, Shaft sealing control, CRH to AUX steam pressure control etc.).

Very much familiar and working experience in SAP plant maintenance module and MM module.

Reliance Infrastructure Limited May 2011-August 2016

Rosa Phase-II(2X300MW)

Sasan UMPP(6X660MW)

DVC Raghunathpur(2X600MW)

Position: Manager C&I

BTG Design & Supply with Shanghai Electric Power Corp. China.

Understanding and implementing various plant designs like P&ID, instrument list, control loops, cable schedule, hookup diagram, JB schedule, PLC IO list, DCS IO list, control room layouts and flowcharts.

To resolve and prevent any construction and design related problem encountered during construction and pre-operational stage of plant.

Good working experience in various phases of Projects like Basic Engineering, Front End Engineering Design and Detailed Engineering including Project Co-ordination.

Instrument procurement activities such as interaction with vendors, technical evaluation of bids and preparation of purchase recommendation and also shop floor inspection (Tools-SAP and KADMS).

Responsible for DCS Commissioning with Invensys Foxboro Engineers.

Responsible for Commissioning and maintenance of DEH,ETS and HP-LP bypass System

Responsible for Commissioning and maintenance of MDBFP,TDBFP & CEP & its C&I Equipments.

Responsible for Commissioning and maintenance of Boiler C&I Control Panels as well as Field Instruments.

Responsible for Commissioning and maintenance of Boiler Burner Management System.

Responsible for Commissioning and maintenance of Boiler SA Fan, PA Fan & ID Fan.

Responsible for commissioning and maintenance of Condenser leakage detection system, condenser rubber ball cleaning system,H2 leakage system, Hydrogen purity gas analyzer system(ABB Kent-Taylor), Seal oil system, Stator cooling water system.

Familiar with BTG DCS logic & its interlocks.

Familiar with Boiler MFT & its protections.

Vedanta Aluminum Ltd (90 MW) August 2009 – May 2011

Position: Assistant Manager

Participated in 4 major annual over hauling of the plant.

Checking of pneumatic actuators, MCVs and MOVs.

Calibration of the instruments.

Field Fault diagnosis and online necessary logic modifications along with routine maintenance.

Maintenance and calibration of control valves, Electronic/Smart Transmitter, Pneumatic valves, Gravimetric Feeders.

Supported the operation team in more than 25 startup individually which includes cold, hot and warm startups.

Execution of DCS (Honeywell, TPS) for power plant and controlling of the plant through this system.

Exposure and Training:

Core team member of FAT of DCS in Invensys Foxboro Shanghai China.

Got trained in 500 MW coal based power plant for 12 month in PGDC.

Simulator training 500MW in NPTI Faridabad and 660MW in Adani Power training center.

Electronic/Smart Transmitter: Rosemount, Siemens.

Control valves: Rotork, Fisher, Sipos, Bernard, Auma etc.

Turbo supervisory instruments of Bentley Nevada 3500 series.

Educational Qualification:

Year

Institution

Program

Percentage 2012

MIT school of distance education Pune

PGDC in Energy Management

62.5

2009

NPTI Durgapur, WB

PGDC in TPPE

72.5

2008

SRIT Jabalpur, MP

Bachelor in Engineering (Electronics & Communication)

71.2

2004

Saraswati Higher Secondary school Jabalpur, MP

H.S.S.C. (12th)

77.8

2002

Saraswati Higher Secondary school Jabalpur, MP

H.S.C. (10th)

75.4

Personal Details

DOB: 28 Aug 1986

Father’s Name: Shri I.K. Tiwari

Marital Status: Married

Nationality: Indian

Passport: Valid till 08/2027

Language:Hindi,English



Contact this candidate