Post Job Free

Resume

Sign in

Communication Technician Power Plant

Location:
Poblacion, Iligan, 9200, Philippines
Posted:
January 25, 2022

Contact this candidate

Resume:

NYL W. SABURAO

Taytay, El-Salvador City, Misamis Orriental,

Philippines

Contact No., +639*********, +639*********

Email: adp0wk@r.postjobfree.com

adp0wk@r.postjobfree.com

Profile of Experience

More than ten (10) years field experience and five (5) years in Project management mainly in the field of electronics and communication. Handling up to 200 manpower and gaining actual and hands-on skills and field exposure in installing, configuring, troubleshooting, testing, repair and maintenance of various standard and specialized electronic, instrument and electrical devices, equipments and gadgets commonly used in telecommunication, telephone exchange, data networks and Power Plants including start-up operations, calibration and testing with exposure in most advance fire alarm systems.

Work Experience

Field Engineer -July 2021 to Present

Serenergy Philippines Inc.

Paranaque City

Duties and Responsibilities:

Project Implementation Engineer in-charge for the Installation of Fuel Cell for Smart Cell site. Fuel cell is an alternative power source implemented by Smart Telecom to replace Generators on Site.

Perform Technical Site Survey (TSSR) for Cell Sites.

Perform Site Kick Off Meeting (SKOM) prior to Implementation and start of construction of Base pads for the Fuel Cell.

Review Drawings before Construction and Installations of Fuel Cell.

Check Bill of Quantity of materials for each site to insure proper shipment of materials for each site.

Review manpower allocation for each site.

Prepare Schedules and make sure subcontractors follow the schedule as planned.

Prepare Subcontractors manpower and conduct pre orientations before the start of the project.

Coordinate with Smart representative for all updates on site

Coordinate Subcontractors for work updates on site and make sure Subcons following health and safety protocols during construction.

Monitor work progress and check for any project implementation deviation from the Drawings.

Monitor and Make sure Subcontractor follow the work as per design.

Site Engineer/Supervisor -June 2018 to June 2021

Special Project Department

2AB Design and Computer Services

Cagayan de Oro City

Duties and Responsibilities:

Over all In-charge for project Implementation of Various Telecommunication Project such as in-house structured cabling for buildings, Cell tower telecom equipments installations and upgrades, Outside Plant (OSP) Pole Erections/Setting, Optical Fiber Cable Layout, Optical Fiber Cable Splicing and Cable Dressing.

Review and Evaluate New Projects Design and Costing

Project site visit for Design Implementation and BOQ preparations

Project Implementation and monitoring of progress and manpower

Project Site Monitoring for Safety issues that may arise during the project.

Perform Inspection for on-going progress to insure proper standards and codes are followed

Monitoring of site progress report during the project implementation to make sure timelines are followed.

Preparation of acceptance procedure for client acceptance test.

Supervisor/Engineer (Fire Alarm System) -May 2017 to May 2018

Fire Fighting Department

Samsung C&T

Umm Al Houl Power IWPP Project

Al Wakra, Qatar

Duties and Responsibilities:

In-charge over all for the installation of Fire Alarm system, FM200 Systems, Fire pumps for entire Power Plant.

Review, Evaluate and Suggest rectification for Pre-Installation documents such as Material approval, Method of Statement, and Inspection Test Plan (ITP) prior to actual installation.

Review, Evaluate and Revised if necessary, Installation Drawings prior to Site Erection.

Perform Site Survey and Evaluate Site Condition.

Analyzed Quantity of materials like engineering length and Approved Installation material quantity as per actual site requirement.

Planning of manpower quantity as per site requirement.

Coordinate and discuss with other disciplines for possible installation clashing points.

Final Site advance survey for proper access prior to actual work and site condition prior to manpower deployment on-site.

Monitor, Supervise and Rectify on-site problems that may occur during the Installation Process.

Prepare and process approval for Documents pertaining with Pre-Commissioning and Final Testing.

Perform and Witness Inspection and Discuss with Client Representative possible options for some rectification work that may arise during the inspection.

Preparation and Process approval for the Erection Complication Certificate (ECC).

Perform Final Walk Down with Client and its representatives prior to handover.

Supervisor/Engineer (Fire Alarm System) -April 13, 2016 to December 2016

Fire Fighting Department

HYUNDAI HEAVY INDUSTRIES Co. LTD

S.E.C Shuqaiq Steam Power Plant

Shuqaiq, KSA

Duties and Responsibilities:

In-charge over all for the installation of Fire Alarm system, FM200 Systems, Fire pumps for entire Power Plant.

Review, Evaluate and Suggest rectification for Pre-Installation documents such as Material approval, Method of Statement, and Inspection Test Plan (ITP) prior to actual installation.

Review, Evaluate and Revised, if necessary, Installation Drawings prior to Site Erection.

Perform Site Survey and Evaluate Site Condition.

Analyzed Quantity of materials like engineering length and Approved Installation material quantity as per actual site requirement.

Planning of manpower quantity as per site requirement.

Coordinate and discuss with other disciplines for possible installation clashing points.

Final Site advance survey for proper access prior to actual work and site condition prior to manpower deployment on-site.

Monitor, Supervise and Rectify on-site problems that may occur during the Installation Process.

Prepare and process approval for Documents pertaining with Pre-Commissioning and Final Testing.

Perform and Witness Inspection and Discuss with Client Representative possible options for some rectification work that may arise during the inspection.

Preparation and Process approval for the Erection Complication Certificate (ECC).

Perform Final Walk Down with Client and its representatives prior to handover.

Supervisor (Fire Fighting I&C, Electrical) -November 2011 to December 2014

Building Facility Department

DOOSAN HEAVY INDUSTRIES and CONSTRUCTION

S.E.C. Rabigh 700 X 4 Units Power Plant 2 Project

Rabigh, KSA

Duties and Responsibilities:

In-charge over all for the installation of Fire Alarm system, FM200 Systems, Fire pumps for entire Power Plant.

Review, Evaluate and Suggest rectification for Pre-Installation documents such as Material approval, Method of Statement and Inspection Test Plan (ITP) prior to actual installation.

Review, Evaluate and Revised if necessary, Installation Drawings prior to Site Erection.

Perform Site Survey and Evaluate Site Condition.

Analyzed Quantity of materials like engineering length and Approved Installation material quantity as per actual site requirement.

Planning of manpower quantity as per site requirement.

Coordinate and discuss with other disciplines for possible installation clashing points.

Final Site advance survey for proper access prior to actual work and site condition prior to manpower deployment on-site.

Monitor, Supervise and Rectify on-site problems that may occur during the Installation Process.

Prepare and process approval for Documents pertaining to Pre-Commissioning and Final Testing.

Perform and Witness Inspection and Discuss with Client Representative possible options for some rectification work that may arise during the inspection.

Preparation and Process approval for the Erection Complication Certificate (ECC).

Perform Final Walk Down with Client and its representatives prior to handover.

Fire Alarm System Technician & 1st Telecomm Technician -July 8, 2009 to August 15, 2010

Low Current Department

Saudi Oger LTD.

KAUST Project

Jeddah, KSA

Duties and Responsibilities – Fire Alarm System Technician:

Additional work load as a Low Current 1st technician, in-charge of troubleshooting of EST 3, Simplex, Honeywell, and quickstart fire alarm system.

Troubleshooting of loop wiring trouble, smoke detector, heat detector and duct detectors.

Install fire alarm system cables, pipes, equipments and others

Fire alarm maintenance of almost 5000 villa, 50 apartment bldgs, 4 hotels for King Abdullah University of Science and Technology.

Duties and Responsibilities – Telecom Technician:

Troubleshooting, testing and repair of all telecomm and data line, router, network configurations and CESCO IP phone.

Installation of additional IP telephone lines and network cable and alike.

Installation and activations of CCTV Surveillance cameras.

Structured cabling for computer networking, electrical cabling and internet configuration.

Installation and maintenance of PaBX telephone switch.

Project Technical Support & Supervisor -July 2008 to May 2009

(Project Base)

(Electrical & Technical Security Service Technician)

2AB Designs and Computer Services

Cagayan de Oro City, Philippines

Install and/or service customer’s commercial security equipment including alarm systems, CCTV, card access, fire systems and associated components and electrical component system

Duties and Responsibilities - Telecom and Fire Alarm System Technician:

Perform proper installation of security type equipment

Adhere to local and national building/construction codes, including safety standards

Stay abreast of product knowledge, pricing adjustments and availability of special product applications

Maintain good, solid, honest, open relationship with all departments and the management staff

Submit activity reports to management as requested

Carry out assignments given by management

Train the customer in the care and use of equipment

Equip company vehicle with proper parts and tools needed to perform installations

Attend classroom and field training as required

Comply with Interface’s safety policy

Maintain a good driving record

Inform the Installation Supervisor or Manager of any events that may cause labor or equipment overages, damage of property and safety issues

Other duties as assigned

Maintain industry certifications as required.

Ability to communicate effectively with customers to explain how system works and the installation process.

Knowledge and ability to operate hand tools such as a drill, hammer, pliers, and cutters.

Installation and activations of CCTV Survellance cameras. Structured cabling for computer networking, electrical cabling and internet configuration.

Installation and maintenance of PaBX telephone switch.

Duties and Responsibilities – Electrical Field & Project Supervisor:

Daily monitoring of Electrical Materials

Perform material check before installation

Prepare material turn over documentation for subcontractor

Supervise the manpower of project subcontractor during work/installation

Supervise cable tray layout works/installation

Supervise lighting and conduit installation

Supervise cable termination to distribution panel

Perform routine inspection and testing with client

Telephone Switch & Data –March 2007 to March 2008

Communication Technician

Philippine Telegraph & Telephone Co.

Cagayan de Oro City, Philippines

Duties and Responsibilities:

Troubleshooting, testing, repair and maintenance of telephone switch equipments and accessories.

Testing and configuring trunklines from unwanted signals and interferences.

Repairing or replacing defective circuit cards.

Ensuring perfect signal exchanges between switch branches.

Ensuring standard, quality and Policy-assured operation. Installation, repair, testing and maintenance of datacom, network and related equipments, devices and accessories such as modems, hubs, routers, etc, and program, set-up/configure the same.

Ensuring standard or customized operation of datacom lines, equipments and accessories per client needs and specifications.

Sr. Field Technician -April 2001 to February 2007

Philippine Telegraph & Telephone Co.

Cebu City, Philippines

Duties and Responsibilities:

Installation, start-up and test operation, troubleshooting, repair and maintenance of telephone cable facilities, including the associated devices and accessories.

Splicing/re-splicing, connecting and terminating cables and wires.

Handling and operating thermal splicing machines for fiber optic cable splicing.

Surveying, mapping, site preparation, preparing and sourcing materials in preparation for any installation of physical cables and drop-wires.

Also assists in installation and testing of related electrical connections; operating and testing of various instrument and calibrating devices

Telephone Switch & Data -September 2000 to March 2001

Communication Technician

Philippine Telegraph & Telephone Co.

Cagayan de Oro City, Philippines

Duties and Responsibilities:

Troubleshooting, testing, repair and maintenance of telephone switch equipments and accessories.

Testing and configuring trunklines from unwanted signals and interferences.

Repairing or replacing defective circuit cards. Ensuring perfect signal exchanges between switch branches.

Ensuring standard, quality and Policy-assured operation. Installation, repair, testing and maintenance of datacom, network and related equipments, devices and accessories such as modems, hubs, routers, etc, and program, set-up/configure the same.

Ensuring standard or customized operation of datacom lines, equipments and accessories per client needs and specifications

Headend / Field Technician –April 1999 to May 1999

DEARBCI Cable TV Network

Bukidnon, Philippines

Duties and Responsibilities:

Install, set-up, troubleshoot and repair CATV equipments and devices.

Test, calibrate, configure or replace electronic parts of CATV taps, amplifiers and related devices/accessories.

Install, troubleshoot and repair physical CATV dropwires, including preparatory site visits/mapping and materials survey.

Educational Background & Qualifications:

BS in Electronics & Communications Engineering

Graduated October 1999

Skills

Special training for plant equipment lifters;

Falcon Spider lifters

Genie lifters

Nifty man lifter

Scissor man lifter

Skilled in common PC applications (MS Suite, etc), Internet use /Email

Familiar with standard/specialized computer-based telecom/datacom troubleshooting software

Network hardware installation, set-up/configuration

Fiber-optic cable splicing and termination

Driving

Seminars/Trainings:

Transmission Fundamentals

(Liceo de University, Philippines)

Fiber Optic Workshop

(Liceo de Cagayan University, Philippines)

Wireless Local Loop Workshops

(Liceo de Cagayan University, Philippines)

CCNA 1 CISCO System Training Program

CIE (Center for International Education)

Cebu City, Philippines

Personal Details:

Date of Birth: July 21, 1977

Place of Birth: Camp Phillips, Manolo Fortich, Bukidnon

Fathers Name: Ronilo T. Saburao

Mothers Name: Leoncia W. Saburao

Status: Single

Religion: Roman Catholic

Height: 5’8

Weight 160lbs

Passport number: P7595821A

Place of Issue: DFA Cagayan de Oro

Character References:

Engr. Arnel Baba Contact Info: 091********

Owner

2AB Design and Computer Services

Cagayan de Oro City

Carl Max Labis Contact Info: 093********

Owner

Eon Technology

Cagayan de Oro City



Contact this candidate