[pic]
PERSONAL BIO - DATA
V.J. THIRUMALAI
Father's Name : D. V. JAYARAMULU
Mother's Name : J. Bhuvaneswari
Nationality & Religion : Indian,
Marital Status : Married
Name and surname of wife : Thirumalai Sambavi
Date of Birth : 29th April 1972
Permanent Address &
Correspondence Address : Plot No. 127, 7th Street Raghava Nagar,
Madipakkam,
Chennai - 600 091.
Tamil Nadu.
India
E-mail ID : adoz93@r.postjobfree.com, adoz93@r.postjobfree.com
Contact Phone No. : +914*********
Mobile No. : 988**-*****, 988**-*****
Languages Known
. Read : English & Hindi
. Write : English & Hindi
. Speak : English, Hindi, Tamil, Telugu & Bengali
Passport Details
. Passport Number : Z 23882824
. Date & Place of issue : 17/02/2012 Chennai
. Date of Expiry : 16/02/2022
Education
. I.T.I. Welder
. National trade Certificate (Welder)
* Conducted by : Govt. of India
* Year of Passing : July 1995
. National Apprenticeship Certificate (Welder)
* Conducted by : Govt. of India (B.H.E.L)
* Year of Passing : May 1997
Professional Qualification (Advanced Training Institute)
High Pressure Pipe Welding by ARC Conducted by ATI
(Government of India,
Chennai 32
Gas Tungsten arc welding (T.I.G) Conducted by ATI
(Government of India,
Chennai 32
MIG - MAG Welding AL, S.S & M.S Conducted by ATI
(Government of India,
Chennai 32
Destructive & non destructive testing of Conducted by ATI
metals (Government of India,
Chennai 32
Welding, Inspection and testing Conducted by ATI
(Government of India,
Chennai 32
Professional Qualification (Advanced Welding Qualification - Abroad)
CRC Evans System (U.S.A) Conducted by Saudi Arabian SAIPEM
(K.S.A.)
PASSO System(Italy) Conducted by SAIPEM & C.C.C. JV (UAE)
Pressto System (Italy) Conducted by SAIPEM & C.C.C. JV
(ONAN)
PWT System (Italy) CCIC & BTC (AZERBAIZAN)
P.W.T. System (Italy) Conducted by S.I.C.I.M (KAZAKHSTAN).
PASSO System (Italy) Conducted by SAIPEM (KAZAKHSTAN)
CRC Evans System (U.S.A) Conducted by Saudi Arabian TECHINT
(K.S.A)
CRC Evans System (U.S.A) ESSAR Constructions India Ltd.,
S.W.S. Welding System (Italy) ANGOLA
S.W.S Welding System (Italy) China
Professional Experience :
1. M/s. Saudi Arabian Saipem Limited (KSA)
Saipem - Limited International largest group of companies engaged in
Design, Engineering, Construction of Refineries, Oil & Gas plants
worldwide with proven technology.
Project Handled: UPTG & HAWIYA G.D.P. GAS PIPELINE PROJECT
Designation CRC - Evans System for Automatic Welding
Operator.
Duration From 1998 to 1999
Job Involved CRC - Evans operating of (Pipeline welding) Root,
Hot, Fill streeper, CAP All followed by approved
WPS
Preheating / interpass temperature followed by
approved WPS and inspected through temple stick.
2. M/s. Saipem - CCC Joint Venture OMAN.
Saipem - CCC Limited International largest group of companies
engaged in Design, Engineering and Construction of Refineries, Oil
& Gas plants world with proven technology.
Project Handled : FSP GAS PIPELINE PROJECT - OMAN
Designation Passo / Presstoo Welder for Automatic System.
Duration From 2000 to 2001.
Job Involved Passo / Presstoo operating of (Pipeline welding)
Root, Hot, Fill streeper, CAP All followed by
approved WPS
Preheating / interpass temperature followed by
approved WPS and inspected through temple stick.
3. M/s. CCIC Limited
CCIC Limited International largest group of companies engaged in
Design, Engineering and construction of Refineries, Oil & Gas plants
world with proven technology.
Project Handled : BTC OIL EXPORT PIPELINE PROJECT AT AZERBAITAN.
Designation P.W.T. Welder for Automatic System.
Duration From 2003 to 2004
Job Involved PWT operating of (Pipeline welding) Root, Hot,
Fill streeper, CAP All followed by approved WPS
Preheating / interpass temperature followed by
approved WPS and inspected through temple stick.
4. M/s. SICIM KAZAKHSTAN
SICIM company engaged in Design, Engineering and construction of
Refineries, Oil & Gas plants worldwide with proven technology.
Project Handled : Gas Export Expansion Project KAZAKHSTAN.
Designation W.P.T. System for Automatic Welding Operator.
Duration March 2004 to September 2004
Job Involved P.W.T. operating of (Pipeline welding) Root, Hot,
Fill streeper, CAP All followed by approved WPS.
Preheating / interpass temperature followed by
approved WPS and inspected through temple stick.
5. SAIPEM, KAZAKHSTAN
SAIPEM Limited International largest group of companies engaged in
Design, Engineering Construction of Refineries, Oil & Gas plants worldwide
with proven technology.
Project Handled : KASHAGAN DEVELOPMENT - TRUNK AND PRODUCTION FLOW LINE,
KAZAKHSTAN.
Designation Passo System for Automatic Welding Operator.
Duration December 2005 to June 2006
Job Involved Passo System operating of (Pipeline welding)
Root, Hot, Fill streeper, CAP All followed by
approved WPS
Preheating / interpass temperature followed by
approved WPS and inspected through temple stick.
6. M/s. B.H.E.L. HIGH PRESSURE BOILER PLANT, TIRUCHIRAPALLI.
Project Handled : Structural welding of pressure parts utility
Boilers.
Designation WELDER SMAW
Duration From 10.10.1996 to 09.01.1997
Job Involved Welding of Pressure parts for utility Boilers /
Industrial Boilers.
7. M/s. B.H.E.L. HIGH PRESSURE BOILER PLANT, TIRUCHIRAPALLI.
Project Handled : Manufacturing the German Design Lisega constant loan
hangers.
Designation WELDER GMAW
Duration From 1996 to 1997
Job Involved Welding the German Design Lisega constant load
Hangers by using GMAW (CO2) method.
8. M/s. DHANALAKSHMI PRESS COMP.
Project Handled : Manufacturing of different kinds of job.
Designation WELDER.
Duration August 1995 to April 1996
Job Involved Welding of different methods such as SMAW, GMAW,
GTAW, Gas cutting.
9. M/s. ENERGREEN POWER LIMITED.
Project Handled : 300 KV B10 MASS GASSIFICATION PROJECT.
Designation WELDER SMAW,GTAW& GAS CUTTING
Duration From December 2000 to November 2002
Job Involved SMAW. GTAW in 6G position and Gas cutting
10. CCC
Project Handled : Gas Pipeline
Designation WELDER SMAW,GTAW& GAS CUTTING
Duration From April 2003 to November 2003
Job Involved SMAW. GTAW in 5G position and Gas cutting
11. Saudi Tech Ltd.
Project Handled: Gas Pipeline
Designation WELDER SMAW,& GAS CUTTING
C.R.C Automatic Welding System
Duration From August 2006 to April 2007
Job Involved SMAW. in 5G position and Gas cutting
12. Essar Constructions India Ltd.,
Project Handled: Gas Pipeline
Designation WELDER
C.R.C Automatic Welding System
Duration From February 2009 to September 2009
Job Involved SMAW. in 5G position and Gas cutting
13. Saipem (Petromar)Angola.
Project Handled: Gas Pipeline
Designation WELDER SMAW,
S.W.S Welding System
Duration From June 2010 to August 2011.
Job Involved SMAW. SWS,SAW in 5G position and Gas cutting
14. Saipem (China)(F.D.S.2 Barge).
Project Handled: Gas Pipeline
Designation S.W.S Welding
Duration From May 2012 to September 2012
Job Involved SMAW. GTAW in 5G position and Gas cutting