CURRICULUM VITAE

Name : Darwin

Date & Place of birth : Palembang, 10/10/1963

Nationality : Indonesia

Marital Status : Married

Education : University.

Passport No : A.4306314

Mobile : 62-821-********

Mailing Address : Jln.Papua II Blok.AG 14 OPI PNS Jakabaring-Palembang.

: Jln. Kartini IV No.29 Sei – Harapan Sekupang - Batam.

Email address : adoy0t@r.postjobfree.com

EDUCATION/TRAINING/SEMINAR/COURSES ATTENDING/MEMBERSHIP

Certified Welding Inspector CSWIP 3.1 by TWI Cert No: 48851/2

ASNT - TC-1A level II MT, PT, UT

Attendance courses piping process engineering ASME 31.3 held by DAP consultant.

Take courses covering the relevant of API 570 Inspection. ASME B31.3 piping design, ASME B16.5 Flanges, ASME Section IX & ASME Section V NDE.

BOSIET OPITO approved code: 5707 Cert No: 137157070802140002

Skills & Experience

Having more than 27(Twenty-seven ) years Experience at Oil & Gas Company, Fabrication, EPCC, Petroleum, Refinery, Petrochemical and Chemical Company for Engineering, Procurement, Safety, QA/QC, Construction, Pre-commissioning including supervision, coordination, inspection, expediting with responsible and concern to quality control procedure & ITP.

Good working knowledge of International construction codes & Standards for the oil & gas industry, project contracts, construction & quality procedures, construction, Plan drawings, piping isometrics, P & I.D’s. Has a proven track record of improving efficiencies for budgets, timescales and process’ from FEED to pre-commissioning and commissioning (Mechanical Completion) whilst optimizing multi-national, multi-skilled teams (construction, welding, Inspection, mechanical, E & I, commissioning personnel etc). Continuously focused on promoting & improving site safety awareness & producing a high level of quality & client satisfaction.

Monitor all aspects of Quality Control to ensure adherence to the company technical requirements and applicable codes

Quality surveillance & Inspection in fabrication shop of Structural/Piping/Vessel ASME fabrication/Alteration

Comprehensive inspection experience of Welding in Versatile Oil & Gas Environment, Sour & Non Sour

Prepare & Re-view WPS & PQR

Familiar with welding inspection of Pipe Mill, Manifold, Hook up Jacket, Pazlor Subsea, Top Pile deck, Modules, Pipeline, LNG double wall Tanks & Equipments.

Familiar with Different NDE Methods used in Piping/Welding Fabrication /Erection

Familiar with preparation of WPQR and Welder Training/induction

Provide expertise to site team to avoid/resolve quality problems

Capable of ensuring the construction scope defined was done in safe, quality conforming, cost -effective & very safe manner

Attend and witness inspection which comes as RFI (Request for Inspection)

Assure contractor compliance with the company approved quality control program and review reports

Worked with Multinational & Multi Cultural Project Team and a very good team player

Capable of supervise & leading a team of inspectors. Familiar with NCR Management Programs & Close out of the same in Oil & Gas Projects

Provide weekly input to the QMS reporting system, with regards to trends and unresolved exceptions and problems

Familiar with IS0 9001; 2008

Familiar with assisting/preparing/reviewing the various permits/documents.

Witness Hydro/pneumatic Testing of Metallic/Non metallic piping which comes under the Jurisdictions of Various International

Final Mechanical walk downs/walkthrough of Subsea, pipeline and Piping System with Operation Team.1 Appendix 4/ASME SEC 9 for Boiler and Pressure Vessel

Witnessed AUT/Phased Array/TOFD in Crude 32” 46” Pipeline for Contractor Part in Pipeline Projects

Well Versed with Welder Qualification in Accordance with Sec IX & API 1104 and VV31M6-101-A and DNV – OS-F101 Submarine Pipeline System 2012.

Corrosion Coating & Painting Inspection of the submerged piping systems/ Crude/Gas Pipe lines

QC Welding Inspector.

Dangote Oil Refining Company Limited

Sept 2019 – May 2020

Project: THERMAL SLEEVE

PT.Cladtek Be Metal Manufacturing – Indonesia.

QC Inspector

Worley Person

March 2018 – January 2019

Project: IDOHO BP-QIT CRA PIPELINE REPLACEMENT EXXON MOBILE

PRODUCTION NIGERIA,(ONNE PORTHARCOURT).

PT. Cladtek Be Metal Manufacturing – Indonesia

Re-view and study the project specification and engineering requirements. Carried out specific works related to monitor inspection, and controlling all welds activities within the section work scopes in accordance with Engineering requirements, Quality control, Documents procedures and requirements and safety requirements. Established the Quality Control, shall be instructed to ensure that the inspection requirements identified with the relevant Inspection Test Plan(s) are implemented on the project and the resulting Quality Record’s are produced. Verify the approved Quality Control Records, with in the discipline ensuring records are generated and expeditiously in accordance with the relevant ITP .Review and implementation PQR, WPS and filler metal. Monitor and controlling welding Pipeline activities. Issues the relevant reports and countersign quality records. Perform visual inspection each joint of pipe. Perform welding surveillance during pipeline welding activities to check all welding parameters suitable with Welding procedures approved by company. Witnessed removal weld defects if any welding repair.

OCTG Inspector

Qatar Petroleum

March 2017 – May 2017

Project: AL-HAMLAH OFFSHORE WELLS

PT.HI-Tech Oil – Field Equipment /NOV Indonesia

QC Piping Welding Inspector

FJORDS Process System

Sept 2015 – October 2016

Project: Catcher Water Injection & Sea Water Treatment M 50 /FPSO

PT.Profab Batam-Indonesia

Review of contractor Procedures, material inspection as per project specification requirements. Monitoring Piping fabrication and Piping installation. Monitoring fabrication as per construction drawing approved. Witnessed and inspection welding Procedure specification and welders qualifications test. Carry out pre – weld check. Monitor welding parameters and consumables compliance during fabrication activities. Monitor welding parameters as per frequency in ITP / QCP. Perform welding visual inspections. Monitor NDT activities and-reviewed NDT (RT/UT) reports. Check calibration and readiness of NDT equipments. Monitor progress of fabrication for piping, structure, witness hydro test, leak test. Witnessed Function Acceptance Test (FAT). Prepare daily report to QA/QC Manager.

QA/QC Welding Inspector

Hyundai Heavy Industries

March 2015 – June 2015

Project: OFFSHORE Pipeline Marine construction Work-1 NSRP JGCS

Consortium-NGHI SON Refinery & Petrochemical

Offshore Vietnam Sea (Barge HD 2500)

Familiar with Re-view of procedure and method statements, review inspection & Test Plan (ITP).Witness (WPQT) as per code and standard VV31M6-101-A and DNV – OS-F101 Submarine Pipeline System 2012 .

Witnessing mechanical testing (Bend test as per code requirements),

Execute the specific inspection on materials, equipment and construction/installation activities on site/offshore lay barge as per quality control and/or inspection and test plan. Issues the relevant reports and countersign quality records and when necessary, monitor welding parameters and consumables compliance during pipe laying installation/construction activities. Carry out pre – weld check. Check and record pipe sequence. Monitors and formally records welding parameters as per frequency. Witness defect removal and subsequent NDT as applicable. Check calibration and readiness of NDT equipments. Carry out of visual inspection of pipelines at station (4) then move up to (ST.5 carried for Auto UT Inspection).

Perform inspection on joint coating as applicable; Heat Shrink Sleeve (HSS), High Density Polyurethane foam, Holiday testing, Density testing, salt test, Adhesion test or feel test.

Structural /Piping Construction Supervisor

MODEC

Dec 2014 – March 2015

Project: FPSO Cidade de caraquatatuba MV/27/M8P (Sea water Treatment)

PT. Profab Batam- Indonesia

Monitored construction activities at site to ensure quality and safety standards were adhered to while achieving maximum work efficiency.

Planned work activities ensuring based on Plan & Isometric drawing, and materials were available to execute project in timely manner.

Participation to walk down of safety and to ensure that all work was carried out LTI free & in accordance with requirements of international codes & project quality procedures.

Ensure that work crews were knowledgeable of work procedures and specifications.

Supervised all fabrication area and ensure all fabrication targets are achieved as per schedule.

Directly support project and construction management with planning and utilization of proper means and methods for all construction services, construction equipment, tools and consumables as well as optimizing their utilization.

QA/QC Inspector ( Client Rep )

APPLUS VELOSI (On behalf EXXON Mobil)

June 2014 – Nov 2014

Project: BANYU URIP EXXON MOBIL CEPU Limited (MCL)

PT. Proserv – Batam-Indonesia.

:

QA/QC Inspector ( Client Rep )

APPLUS VELOSI (On behalf MCDERMOTT Asia Pacific)

June 2013 – May 2014

Project: UMBILICAL’S RISERS and FLOW LINES (URF) ITCHYS (INPEX Australia)

PT. Brodero Shaw Batam-Indonesia.

Perform Material Inspection as per DNV-OS-F101 and Specification, Review Material Certificate as per ASME PART II A, DNV-OS-F101 and Specification. Perform Final Dimensional and Visual Inspection for external and internal Pipe such as; Pitted, Scratch, Gouge and internal Blister, Dent Clad, Chemical Mark, Rolling Mark, at Claded and Mechanically Line pipe (MLP), Witnessed Dimensional, Ultrasonic Testing, PMI, Magnetic/Gauss, Thickness CRA, Length of Pipe and Ovality of Pipe Prior to Coating and Weld

Weekly report & Pictures submits to QC Coordinator based in Singapore.

QA/QC Welding Inspector

HYUNDAI HEAVY INDUSTRIES

January 2013 – July 2013

Project: BARZAN Pipeline Offshore/Onshore (RAS GAS/EXXON MOBIL)

RAS LAFFAN Industrial City of Qatar

Capable of reviewing/identifying hold /witness/ % of witness/surveillance/document review Points in the Inspection Test plan (ITP) as well as familiar with Quality Control Plan (QCP) which generates from Sub- contractor Familiar with PQR package re-views which is submitted from Sub- contractor. Witnessing of the Procedure Qualification (PQR) of the initial WPS drafted and Monitoring /Survey the essential parameters recorded during PQR qualification. Familiar with Quality Control Documentation In strict keeping with the ITP as well as weld Batch Certificates of Electrodes & Paints

Familiar with piping Materials Carbon Steel SAW API 5 Lx 65, fittings of LC 2242 CRA, Carbon Steel Seamless line Pipe (MEG Service), CRA Clad Carbon Steel Line pipe, CS Induction Bends for MEG Pipeline.

Coordinate and control the engineering aspects of the project, including additional drawings modification etc.

Familiar with NCR management programs & close out of the same Oil & Gas Projects Participate in the resolution of the quality problem. Maintain records of works performed within assigned responsibility and ensure quality Material used, verify qualification of personnel performing the work, ensure approved Methods are used, cooperate with and assist Sub - contractor and others, where possible, in the achievement of Quality goals. Maintain records on test, evaluation and measurements. Participate in the resolution of the quality problems.

Participating in pre-construction meetings with suppliers and sub supplier to promote to Ensure quality requirements are understood and achieved Witness/Monitor WQT (Welder Qualification Test) WPS (Welding Procedure Specification) reviewing/and approval of WPS assimilating All the essential, supplementary are within ranges allowed & non-essential, editorial Changes are addressed properly by the revision. Familiar with Pipe Line activating like stringing, fit-up using internal/external clamps, welding using SMAW as well finally lowering in the trench.

Holiday inspection witnessed prior to lowering between RAS GAS Company.

Recommended voltage both for the line and girth join using high voltage holiday detectors.

Conduct dimensional inspections as required for verifications. Monitor project welding quality. Evaluate, verify or check adequacy of welding equipment

Witnessing Line Coating as well Field Joint Coating FBE application, inspection as Well testing requirements. Review of pipe line section or pipe book package, clearance for coating as well lowering

Well experienced with pre-test clearance (Weld & NDT) of Hydro/Pneumatic test packages.

Experience pre-commissioning like air blowing, card board blasts system wise testing of piping.

P & ID conform to isometric before test package.

Ability to take strong initiative & self motivated. Familiar a multinational & multi cultural project team. Follow with construction in case of disputes & problem solve. Prepare daily report to submit to QA/QC lead.

Mechanical Inspector

BRUNEI SHELL PETROLEUM (BSP) - (Main Contractor Worley Person)

Sept 2011 – Sept 2012

Project; CHAMPION 7 LIVING QUARTER

P.T Profab Batam-Indonesia

Reviewed and Verified ITP, Quality Plan & Fabrication Procedure, Fabrication Drawing, NDE Map, Mill Certificates, Non Destructive Testing Procedure (MPI, PT, UT and RT) and final dossier prior to certification with BUREAU VERITAS.

Supervise the Contractor and Subcontractor’s site activities and insist on the requirement and standard stipulated in the contract. Know important points of QC of the project and pay more attention to monitoring key items of the project. Timely check the contractor’s work results and find possible defective have the right to reject defective work and ask for correction.

Witnessed Welding Procedure Qualification Test, Welder and Welding Operator Qualification Test and Mechanical Test, Material Receiving Inspection, Perform Welding Inspection, Interpretation Film Radiograph, Witnessed UT, Post Weld Heat Treatment (PWHT), Bolt Tensioning, Hydrostatic/Pneumatic Testing & Nitrogen Leak Testing, Cleaning, Flushing & Drying, Pickling & Preservation material and of Product piping system, Blasting & Painting for corrosion protection.

Inspection and Line walk, Reinstatement and to ensure closed out all punch items for Piping, Structure, Mechanical, Architectural, HVAC, Electrical & Instrument Installation and ensuring delivery through to offshore mechanical completion, pre-commissioning & Commissioning and Liaise Mechanical Completion and Commissioning Certificates.

Ensure that necessary levels of reliability in equipment and systems are reached by the correct specification of requirements through to proper installation, commissioning and test.

Coordination all works with Engineer and construction manager/superintendent for the resolution of construction requests for clarification, pipe modification, site queries and non-conformances.

Review & Compile All Field Piping, Structure, Mechanical and, Pipeline End Manifold Records for Manufacturing Data Report (MDR)

Working on behalf the Client, Prioritizing System, Completion Test Package scope work using subcontractors and ensuring all relevant test certificates are signed off the client and updated the system of Tracking.

Participation to walk down of safety and to ensure that all work was carried out LTI free & in accordance with requirements of international codes & project quality procedures.

QA/QC Welding Inspector

CHIYODA

June 2011 – Sept 2011

Project: FITTING OVERLAY Jubail Export Refinery Saudi Arabia

P.T Cladtek Indonesia

Receiving and verification material (pipe and fitting) review mill certificate other relevant document.

Before Welding : make sure all material after blasting and UT thickness of the material are according to specification for profile will meet requirement and make sure the welding consumable as per to WPS and client specification ( filler metal satellite 6 inconel ).

During Welding: monitor wire peed, travel speed, temperature, ampere, voltage according to WPS.

After Welding : Visual for inspection to make sure no defect or other contamination on the material and welding profile meet requirement according to WPS and client specification than for NDT.

QA/QC Welding/piping/Structural Inspector

ACERGY – France (TOTAL E & P/BP Angola/EXXON Mobil)

January 2010 – May 2011

Project: PAZPLOR SURP, Buoyancy Tank, SUBSEA, and Kizomba Satelite for Offshore Block 17.

SONAMET Yard Fabrication based in LOBITO - ANGOLA.

Reviewed and Verified ITP Quality Plan & fabrication Procedure, Fabrication Drawing NDE Map, Mill Certificate, NDT Procedure.

Supervise to Subcontractor Side Activities and insist on the requirement and standard in stipulated in the contracts. Know important point of QC the project and pay more attention to monitoring key items of the project.

Witnessed Welding Procedure Qualification Test, Welder And welding Operator Qualification Test And mechanical Test, Material Receiving Inspection, Monitoring & witnessed UT, Post Weld Heat Treatment (PWHT) Bolt tensioning, Hydrostatic, Pneumatic Testing And Nitrogen leak Testing, Cleaning, Flushing/Drying, Boroscope, Passivasion, Pickling, And Preservation Material of production piping System Blasting and Painting for Corrosion Protection.

Inspection and line walk, Reinstatement, and to ensure closed out all punch items for piping, Structure, Mechanical, Architectural, and ensuring delivery thought to Offshore Mechanical Completion, Pre-Commissioning And liaise Mechanical Completion And Commissioning Certificates.

Working on behalf the contractor, Prioritizing System, Completion Test package scope work using subcontractors and ensuring all relevant test certificates are sign off the client and Update the System of Tracking.

Review And Compile All field Piping, Structure and Mechanical Records for Manufacturing Data Report.

Participation to Walk down of Safety and ensured that all work was carried out LTI Free in accordance with requirements of International Codes and Project Quality Procedures. .

Construction Supervisor

SWIBER Ltd.

April 2009 – May 2009.

Project: OFFSHORE PIPELINE North Belut & Kerisi (Conoco Philips)

Conquest Barge – South China Sea.

QA/QC Welding inspector

SARAWAK SHELL BHD

March 2008 – January2009

Project: KA/PA/B-II (Fitting & PIPE WELDS OVERLAY (CRA)

PT.Cladtek Batam-Indonesia

Receiving and verification material (pipe and fitting) review mill certificate other relevant document.

Before Welding : make sure all material after blasting and UT thickness of the material are according to specification for profile will meet requirement and make sure the welding consumable as per wps and client specification ( filler metal 625 inconel )

During Welding: monitor wire peed, travel speed, temperature, ampere, voltage according to wps.

After Welding : Visual for inspection by camera for pipe after welding to make sure no defect or other contamination on the material welding profile meet requirement according to wps and client specification for NDT.

QA/QC Welding Inspector

SBM OFFSHORE Company

Dec 2007 – March 2008

Project: FLOATING PRODUCTION MOORING SYSTEM

Profab Batam Indonesia.

Inspection of material, mill certificates verification as per company. Witness welding procedure and Welder qualification test (WPQT) and (WQT). Monitoring fabrication as per drawing approved. Controlling edge preparation, monitoring fit up activities welder’s activities and Welding Parameter as per welding procedure.

Reviewed applicable WPS and WQR prior to carry out welding inspection

Reviewed applicable project specification

Carry out welding inspection such as fit up, visual inspection and request for

RT, MT, UT/SCAN as per approve inspection test plan.

Witness for Lay down Fabrication

Prepare document of dossier and MDR.

QC Inspector

GLOBAL Co Ltd.

November 2006 – November 2007

Project: TPOT - MAARI FPSO, MONTARA FPSO, PROSAFE FPSO.

Batam – Indonesia.

.

Carried out receiving material inspection and verification received materials against mill certificate and witness WQT & WPQT

Reviewed shop drawings and weld maps.

Review applicable WPS and WQR prior to carry out welding inspection.

Reviewed applicable project specifications

Carry out welding inspection such as fit up, visual inspection and request for NDT (RT, UT, MT / PT) as per approved Inspection Test Plan.

Coordinating with Dimensional control personnel to ensure dimensional / leveling was carried out and acceptable to project acceptance level as specified in project’s specification.

Updated NDT clearance for both piping and structure,

Release for both structure and piping to painting after NDT is cleared to painting.

Reviewed and released Hydrostatic test packages then witness Hydrostatic Testing.

Assist QC documentation in preparing of QA / QC dossier and MDR.

QA/QC Supervisor

Toyo Kenetsu Indonesia (BP TANGGUH)

June 2005 – Sept 2006

Project: LNG TANGGUH TREND 1 BRITIS PETROLEUM (BP) STORAGE LNG TANK DOBLE WALL & OIL TANK.

Teluk Bintuni west Papua- Indonesia

Familiar with re-view Mill Certificates material Certificates as well

Batch Certificates of Electrodes & Paints

Capable of facilitating the Inspection and & material follow up material storage yard

Coordinate and control the engineering aspects of the project, including additional drawings Modification etc. .

Familiar with quality non conforming material & quarantine systems preventing the same to material issued Participate in the resolution of the quality problems.

Material used, verify qualification of personnel performing the work, ensure approved methods are used Cooperate with JGC as contractor and BP TANGGUH, where possible, in the achievement of quality goals. Evaluate, verify or check adequacy of welding equipment. Conduct /Monitor WQT (Welder Qualification Test)

WPS (Welding Procedure Specification) reviewing/and approval of WPS assimilating

All the essential, supplementary are within ranges allowed & non-essential, editorial Changes are addressed properly by the revision. Familiar with Material receiving inspection for Tank as well reporting the abnormalities Noted.

Visual inspection of welding before & after welding as per the code API 650/620 applied. Familiar with Tank activating, fit-up using jig, clamps, welding using SAW and SMAW.

Prepare schedules covering his works when required by project controls section.

Assist in preparation of field change notices (FCN), extra work orders and back charge notices when required.

Conduct dimensional inspections as required for verifications. Conduct Vacuum Box test and PMI, request of non destructive test.

Monitor project welding quality. Evaluate, verify or check adequacy of welding equipment well experienced with pre-test clearance (Weld & NDT) of Hydro/Pneumatic bottom plate. Maintain records of welding traceability.

Co-ordinate and follow a group of Inspectors and report to QA/QC Manager. Ability to take strong initiative & self motivated.

Follow with construction in case of disputes & problem solving

QC Inspector

McDermott Indonesia.

Nov 2004 – May 2005

Project: WOODSIDE/ FOSTER WHEELER/ ARTHIT

Batam – Indonesia.

Verification that the Quality Assurance system is implemented, Professional execution of the work, verification that specified requirement are being met, ensure that the fabricator implemented their system for quality assurance identification, handling, segregation, preservation, storing of raw material and production material, verification welder qualification and welding are being performed in accordance with approved WPS, witness non destructive testing including film radiography interpreter. Monitoring all activities on site before, during and after structure and piping fabrication.. Monitoring welder activities and welding parameter during welding in progress. Witness piping hydro testing as per procedure approved by company. Witnessed Flushing and drying activities after hydro testing completed. Witness reinstatement activities between client Inspector. Monitoring painting activities check surface condition as per procedure approval and check temperature and humidity as per procedure required. Witnessed Painting Qualification Test (PQT).

QC Inspector

PT. GEMA SEMBROWN

February 2001 – April 2002

Project: ANOA GAS EXPORT

PT. NIPPON Steel Batam – Indonesia.

Coordinate with Owner/client representative. Implement of (ITP) Inspection Test Plan. Material checked as per project specification including certificates. Visual inspection & witness the welding performance before, during, and after on completion the job as per client project specification. To checked construction drawing as per approved drawings, WPS joint details and Asme B31.3 and project specification. To checked dimensional of pipe spools prior to welding and after welding. Review of test packages and witness of hydro testing / flushing & air blowing. Request of NDT, PWHT control for Low alloy steel Material. Line check prior to hydro testing and preparation of punch list piping test package and verification as well. Monitor hydro test, flushing as per procedure. Verify the mechanical completion/reinstatements activities.

Prepare documentation and final dossier

QC Inspector

Bechtel SHAPADU

November 1999 – February 2000

Project: OLIFIN MALAYSIA

Terengganu – Malaysia.

Monitoring and tracking welding, wrapping & foam filling activities.

Issue formal Inspection assignment for work on site.

Ensure Inspection and testing is in accordance with approval inspection and test plan

Issue non conformance report, register and monitor third party approval.

Witness Nondestructive test.

Review visual and NDT report.

Daily report submits QC Manager.

Piping Inspector

SUMATEC SDN BHD

June 1998 – August 1998

Project: PETRONAS CARIGALI Offshore Dulang II

Terengganu – Malaysia.

QC Inspector

PT. BATAMAS JALA NUSANTARA

October 1997 – May 1998

Project: SCANDIA TRADING

PT, BATAMAS JALA Nusantara – Indonesia.

Make random inspection and finished product after process conform to requirement and specification.

Read inspection report to determine for poor quality performances and develop corrective action.

Carried out in process QC check and must be following the correct procedure of every process in the manufacture.

Conduct in progress inspection of structural both in shop in erection including material trace ability.

Assign to witness qualification welder test and innovation welding procedure test.

Ensure that fabrication and welding work conform to client specification and relevant project.

Witness all hydro testing.

Ensure all NDT carried out as per specification and customer requirement.

Piping Inspector

SUKWON ICHE SDN Bhd.

July 1997 – Sept 1997

Project: PETRONAS CARIGALI Offshore Dulang I

Terengganu Sea Malaysia

Piping Inspector

CHIYODA

April 1996 – October 1996

Project: REFINERY PHASE II PETRONAS.

Sungai Udang Malaka-Malaysia.

Read and understand the Inspection and Test Plan (ITP). Read and understand drawing (Description, Rev, BOM, NDT, and PWHT) Patrol inspection and ensure at lay down areas segregated stainless Steel and Carbon Steel. Ensure welder qualification (Welder Register). Ensure Procedure Qualification (WPS Register). Verify correct materials to be weld (Material Traceability) Compare to Bill of Material (BOM). Ensure correct equipments (Validation of welding machine). Ensure correct consumable and WPS numbers. Random Check electrodes/Flux oven calibration record and Electrode store. Check fit up prior to weld Root gap, face, and alignment, bevel angle Materials. Check pre heat temperature according to WPS approved prior to welding. Ensure tacking and welding carry out as per WPS approved. Follow up and monitor repair if any. Perform visual welding inspection. Review and sign visual fit up and visual reports. Filling all related inspection documents is respective areas for back up purpose. To control quality accordance codes standard/specification.

QC Inspector

EVERSENDAI

November 1994 – July 1995

Project: KLCC TOWER

Kuala Lumpur Malaysia.

QC Inspector

MEISER KENT

April 1994 – October 1994

Project: SIEMEN AG POWER GENERATION.

Serdang – Malaysia

Monitoring and tracking welding, wrapping &foam filling activities.

Issue formal inspection assign for work in site.

Ensure inspection and testing is in accordance with approval inspection and test plan (ITP)

Issue non conformance report, register and monitor third party approval.

Witness Nondestructive test

Review visual and NDT report.

Piping Inspector

HYUNDAI ENGINEERING & CONSTRUCTION Co L.td

July 1993 – 1993

Project: MARINE REFINERY phase I PETRONAS.

Sungai Udang Malaka-Malaysia.

Piping Supervisor

HYUNDAI ENGINEERING & CONSTRUCTION Co L.td

October 1991 – August1992

Project: REFINERY GPP phase III PETRONAS

Kerteh Terengganu - Malaysia.

Piping Foreman

HYUNDAI ENGINEERING & CONSTRUCTION Co L.td

July 1989 – September1991

Project: REFINERY GPP phase II & III PETRONAS

Kerteh Terengganu - Malaysia

Structural Foreman

HYUNDAI ENGINEERING & CONSTRUCTION Co L.td

January 1989 – June1989

Project: REFINERY GPP Phase II PETRONAS

Kerteh Terengganu - Malaysia

Codes/Standards Familiar

ASME- Sec. IX

ASME-Sec. II Part A, B &C

ASME-B31.3, 31.4, 31.8

API-1104

AWS D1.1

ASME Sec viii Div.1Appendix IV

ASME Sec V

DNV – QS - F10 - submarine pipeline system 2012.



Contact this candidate