Resume:

Manish Kumar Sharma

Mobile: +91-861*******

Email:- adoxjm@r.postjobfree.com

PERMANENT ADDRESS:

Chandra Nagar colony kailadevi Road,

Dist.-Karauli, Rajasthan

CAREER OBJECTIVE

Continue my profession in a growth oriented, leading organization. Where I am contributing my knowledge, skills and experience in PV Projects erection, operation, maintenance & Troubleshooting of Electrical & Instrumentation equipment’s etc. for their smooth functioning till achievements of an organization’s goals.

PROFILE

Seasoned and dynamic Electrical Solar Power PV Projects Engineering with offering 6+ years of experience in Project involving Engineering, erection, commissioning and O&M of Power equipment’s and power distribution systems projects.

Seasoned and dynamic Industrial Automation with offering 2+ years of experience in project involving, installation and commissioning of electrical and electronics instrument’s and power distribution system instruments.

Demonstrated professional excellence in project planning, scheduling, monitoring, Site Supervision, and execution of projects without incidences of time and cost over runs.

Strong background in site management of solar power PV systems and industrial automation system from site Establishment to site closure.

A systematic, organized, hardworking and dedicated team player with an analytical bent of mind, determined to be a part of a growth-oriented organization.

WORKING EXPERIANCE

1.Current Employer : Pioneer Power Systems

Period : From Nov. 2016 to till date,

Position : SR.Electrical and instrumentation Engg.

(Projects)

Roles & Responsibilities:

Erection & commissioning of Inverter, Combiner box, Transformer, RMU & HT, LT Panel.

Maintain relationship between contractor & Client.

Maintain all check sheet.

Daily reporting to seniors & HO.

Maintaining proper man power planning.

Responsible for planning of works to be done during given period time.

Responsible for procuring required spares, tools & tackles in time.

Project Details:

S/NO

Project Name & Capacity

Client Name

Scope of Working

Timing

1.

4 MW PV Project, Gogaon Solapur, Maharastra

Waaree Energies

33 kv line and 4 pole work.

Feb 2021 to aprail 2021

2

5 MW PV Project, J.K.L.C, Dabok,Udaipur,Rajasthan

Renew Power

Erection & Installation of Plant.

Dec 2019 to September 2020

3

7.5 MW PV Project, J.K.L.C, Banas,Sirohi,Rajasthan

Renew Power

Erection & Installation of Plant.

June 2019 to Dec 2020

4

2 MW PV Project,Railway,Uttarpradesh

Azure Power

Erection & Installation of Plant.

Jan 2081 to dec 2018

5

2 MW Roof Top PV Project, RSWM, Bhilwara,Rajasthan

Micromax

Erection & Installation of Plant.

Jan 2017 to Aug 2017

6

25 MW PV Project, Nagari, Chittoor, Andhra Pradesh

Waaree Energies

AC,cable work, & electrical equipment installation

Nov,2016 to till date.

7.

12.5 MW PV Project, Pattikunda,karnool,Andhrapradesh

ACME

Dc cable work & installation

4Jan-2016 to 5march 2016

8.

25MW PV Project, Madanpalli,Chittoor,Andhrapradesh

Waaree Energies

AC, DC cable work & electrical equipment installation

6 march2016 to 15 June 2016

9.

550 KW PV Roof top Project, Jodhpur, Rajasthan

Sharma industries

Erection & Installation of Plant. O&M over all plant

Aug 2016 to Oct 2016

2. Rays Power infra Pvt. Ltd. Jaipur, Rajasthan:

Period : From June. 2013 to Jan 2016,

Position : Electrical and instrumentation Engg.

(Projects)

Roles & Responsibilities:

Erection & commissioning of Inverter, Combiner box, Transformer, & Panel.

Maintain relationship between contractor & Client.

Maintain all check sheet.

Daily reporting to seniors & HO.

Ensuring preventive maintenance is happening as per schedule

Preventive maintenance & attending breakdowns of AC Cables, Transformers, &RMU and Inverters & AC Earthling Dc side fault.

Monitoring performance of Inverters.

Attending auxiliary Supply and plant lighting related issues.

Maintaining proper man power planning.

Ensuring preventive maintenance is happening as per schedule.

Responsible for planning of maintenance works to be done during shut down.

Responsible for procuring required spares, tools & tackles in time.

To ascertain power failures from grid and apprehend same to the management.

Project Details:

S/NO

Project Name & Capacity

Client Name

Scope of Working

Timing

1.

10 MW PV Project, Kalwakurthy,Telangna

Haldiram Snacks Pvt. Ltd

Erection & Installation of Plant.

16 June to till date

2.

54 MW PV Project,Orai,U.P.

Essel Group

Erection & Installation of Plant.

May 2015 to 15 June 2015

3.

20 MW PV Project,Lakhmirwala Mansa,Punjab

Essel Group

Erection & Installation of Plant. O&M over all plant

Feb 2015 to Aprail 2015

4.

10 MW PV Project, Barre’Mansa, Punjab

Essel Group

Erection & Installation of Plant. O&M over all plant

Feb 2015 to Aprail 2015

5.

220 KV Polling substation, Mokla Jaislmer.

(Tanot Wind Power Pvt. Ltd..)

Greenko Ltd.

Erection & Installation of PSS.

Apr 2015 to May 2015

6.

1 MW PV Project, Dubaka,Medak, Telangna

Zazoo Textizer Ltd.

Erection & Installation of Plant.

Oct. 2014 to 2015

8.

9 MW PV Project, Boinpally,Mahbubnagar, Telangna

Pragati Group

Erection & Installation of Plant. Operation & Maintenance over all plant

Jan 2014 to till date

9.

1 MW PV Project, Boinpally,Mahbubnagar, Telangna

Surya Nandan Gadiya textiles Pvt. Ltd.

Operation & Maintenance over all plant

Jan. 2014 to till date

10.

1MW PV project, Kolayat bikaner, Rajasthan

Saboo Engineer Pvt. Ltd.

Erection & Installation of Plant. Operation & Maintenance over all plant

Nov. 2013 to Jan 2014

3. Process and Machine Automation System (Jhons Group, a system house of Siemens and L&t.) Jaipur,Rajasthan

Period : From Sep-2011 to Oct 2013,

Position : Service Engineer (Instrumentation)

Speclization : Dg Synchronization & AMF

Roles & Responsibilities:

Manufacturing, Testing, Installation & Commissioning of various type of PLC panel, DRIVE based control panels for various machines.

Manufacturing, Testing, Installation & Commissioning of DG Amf panels, DG Synchronizing panels, Grid synchronizing panels, Turbine synchronizing panels,

PLC Programming, SCADA and HMI Programming for various type of Machines like: - Multi cutter Machine, Polishing Machine,

Checked Electrical drawing and make Correction as client requirement.

Checked Customer Complained and provide solution as per requirement.

Motors/ Starters/ Control Circuits: Induction Motors, Torque/ Speed characteristics, Star Delta Starters, DOL Starters, Reversing starters, interlocking

Process Instrumentation: RTDS, Thermocouples, Level Sensor, Flow sensor Proximity Sensors, Relays, Contactors, Thermal overload relays.

Manufacturing, Testing Commissioning of HT panel, LT panel, APFC panels, MCC panels.

Maintenance of all machine and Quality Checking of production

Project Details:

6 Month work UMDS Talc Plant, Bhilwara (Raj.) on AMC project.

2 Dg (500 kva) Synchronizing, UMDS Talc Plant, Bhilwara (Raj.)

5 Dg (1500 kva) Synchronizing, Treasure Island Mall,Indore (M.P.)

4 Dg (1500 kva) Synchronizing, Paras Pharma Pvt Ltd. (Reckeet bencksyier Ltd.), Baddi. (H.P.)

2 Dg (1500 kva) Synchronizing, Bhaskar printing press, Indore (M.P.)

3 Dg (1500 Kva) Synchronizing,

5 Dg (500 kva & 1500kva) Synchronizing, R.K. marble Pvt. Ltd., Kishangargh (Raj.)

6 Dg (1500 Kva) Synchronizing, IT Park, Indore (M.P.)

3 Dg (1500 Kva) Synchronizing, C-20 Mall, Bhopal (M.P.)

2 Dg (1500 Kva) Synchronizing, Adesh Medical University,Bhatinda (punjab)

3 Dg (1500 Kva) Synchronizing,Wochardt Pvt.Ltd. Ambala(Hariyana)

5 Dg (500 kva & 1500kva) Synchronizing, Steel Strip Pvt Ltd Ambala (Hariyana.)

2 Dg & Grid (1500kva) Synchronizing, S.S Milk Dairy., Ludhiyana (Punjab.)

4. INFINITE TELE SOLUTION PVT. LTD., GURGAON.

Period : From Aug-2009 to Sep 2013,

Position : RF Engineer (Instrumentation)

Speclization : RF Survey & Transmission

Working Area & Responsibilities: -

Line of site Survey and generation and submission of Line of site Survey reports.

Checking for obstacle details; that may obstruct the transmission path of MW link as planned

Extraction of AMSL values from topomaps and on field obstacle heights collection of transmission path of PTP mw link

Path profile generation and verification for the PTP MW links using Pathloss4.0

Proposing the optimum height of antenna keeping in view the height of obstacles and clearance criteria.

RF Nominal site planning.

Design allocation and tilt requirement details.

Capacity & Coverage Sites.

RF Candidate Site evolution (Search Ring).Antenna heights for RF Coverage and Orientation.

PROFESSIONAL QUALIFICATION

B.E. in ELECTRONICS INSTRUMENTATION AND CONTROL from Global Institute of Technology, Jaipur (Rajasthan Technical University) in year 2005-2009 with 61.00% marks.

10th Passed from Board of Secondary Education Rajasthan, Ajmer in year 2003 with 73.50% marks.

12th Passed from Board of Secondary Education Rajasthan, Ajmer in year 2005 with 59.38% marks.

COMPUTER SKILLS

Microsoft office, windows xp, 7, c language.

PERSONAL DETAILS

Father’s Name : Sh. Nand Kumar Sharma

Date of Birth : 12/11/1989

Present Address : Chandra nagar colony kailadevi Road,

Dist.-Karauli, Rajasthan

Marital Status : Unmarried

Language Known : Hindi, English

Nationality : India

DECLARATION

I hereby declare that all information is given above is best and true in my knowledge.

Date: 29/03/2017

(Manish Kumar Sharma)



Contact this candidate