Post Job Free
Sign in

Power Plant Industrial Training

Location:
Banswara, Rajasthan, India
Posted:
September 29, 2021

Contact this candidate

Resume:

Mahesh Jetty

Mobile: 913*******/630-***-****

Email: ***************@**********.***

Address- Plot#35, Road#2, Adarshnagar colony, Opp: Susheela apartment, Serilingampalli, Hyderabad-500019

Date of Birth-18.02.1968. Education-B.E-Mechanical (1991) Passport-N2441622. Marital Status-Married

Job Objective

Seeking managerial assignments in Commissioning, Operations, Maintenance & Performance Assessment with an organization of high repute in Power sector.

Professional Synopsis

1A Mechanical Engineering Graduate with more than two and half decades of rich experience in Commissioning, Operations, Maintenance, Performance Assessment, Project engineering & Erection of Thermal Power Plants.

2Headed commissioning, operation and maintenance in power plants of capacities upto 300 MW units

3Operation and maintenance of power plants with all its utilities with uninterrupted availability, reliability, economical, safety and also developing the operation & maintenance staff on O & M aspects.

4Planning and execution of startup and shutdown of units

5Budgeting, Tools, Inventory / Spares planning and vendor planning.

6Proficiency in devising maintenance (Routine, Preventive, Predictive, Overhauling & Shutdown maintenance) Activities, procedures and methods; diagnosing breakdown problems; monitoring and controlling maintenance costs.

7A keen planner & strategist with expertise in handling projects for improving efficiency of equipments/ machinery using available resources and ensuring timely completion.

8Co –ordination with Government / legal agencies for statutory clearances.

9Erection & normalization of plant auxiliaries/Utilities in chronological order.

10Effective communicator with excellent relationship management & negotiation skills to maintain harmonious industrial relations and discipline.

Organisational Experience

S.No

Organisation, Plant size & Designation

Period

Responsibilities

From

To

1

Site: Hindustan Zinc Limited, Dariba, Organisation: Kepco KPS.

Role-Head Mechanical maintenance

80 MW X 2+10+ 5 MW

Nov 2019

Till date

1.Mechanical maintenance covering boiler with auxiliaries, turbogenerator with auxiliaries, cooling water pumps, cooling towers, PT plant, DM plant, Raw water pump house, intake pump house, Fuel oil pump house, Ash Handling plant, A/C and ventilation etc.

2. Spares planning & development.

3.Implementation of Preventive, Predictive, Shutdown maintenance etc

4. Contracts finalization.

5. Vendor development.

6. People development

7. Safety implementation and ensure accident free at site all time

2

SKS Power Generation limited.

300MW X 2

DGM-Mechanical Maintenance

May 2016

Apr 2019

Core /Regular

1.Maintenance covering boiler(1080 TPH) with auxiliaries, turbine (Single reheat condensing with hydrogen cooled generator) with auxiliaries, cooling water pumps, cooling towers, PT plant, DM plant, Raw water pump house, intake pump house, Fuel oil pump house, Ash Handling plant, A/C and ventilation etc.

2. Spares planning & development.

3. Set up of maintenance Department.

4. Implementation of Preventive, Predictive, Shutdown maintenance etc

5. Contracts finalization.

6. Vendor development.

7. People development.

One time events

1. Commissioning of Turbine with auxiliaries, Boilers with auxiliaries, WTP with DM plant, Compressors, Cooling towers with pumps etc.

2. Maintenance activities to support commissioning of unit.

3. Erection and normalization of plant auxiliaries.

3

Hindalco Industries limited.

150 MW X 6

Asst General Manager

Jan 2012

Apr 2016

Core /Regular

1. Maintenance of boilers (Fans, APH, Pressure parts, Valves, Mills and Feeder)

2. Spares planning, Budgeting of Boilers.

3. Implementation of Preventive, Predictive, Shutdown maintenance etc.

4. Plant operation (Consisting of TG and boiler with auxiliaries, CW systems, A/C and ventilation system, FOPH etc)

5. Set up of operation department infrastructure and budgeting.

One time events

1.Overall responsibility for plant commissioning.(Area- Boiler, Turbine, DM & PT plant, FOPH, Fire water system, Raw water system, Cooling tower & cooling water system)

2. Set up infrastructure for plant commissioning.

3. Implementation of commissioning protocols.

4

Vadinar power company limited(Essar Oil Limited)

100MW X 3

DGM

Oct 2008

Dec 2011

Core / Regular

1. Maintenance of boilers (Fans, APH, Pressure parts, valves, Mills and Feeder) FOPH & CW systems

2. Tools/Spares planning, Budgeting

3. Implementation of Preventive, Predictive, Shutdown maintenance etc

4. IBR office dealings

One time events

1. Project engineering for 3 X 100 MW Thermal power plant covering Pre and post order engineering covering finalization of documents.

2 Ensuring availability of materials such that no holds in erection front.

3 Erection of boilers, CW system & FOPH

4 Commissioning of Turbo generators, Boilers, CW system, FOPH.

5

Vardhman Yarns

30MW X 1

Sr.Manager

Apr 2006

Sep 2008

Core / Regular

1. Operation and maintenance of complete power plant

2. Tools, Spares & Resource planning for complete plant.

3. Operation and maintenance infrastructure development.

4. Contracts finalization

5. Co-ordination with other departments of the unit

6. Legal compliance

One time events

1. Conceptualization, Tender finalization, vendor finalization, Detail engineering & Drawings approval, Civil works monitoring, Erection, commissioning of AFBC boiler, 30MW condensing turbine, Dense phase pneumatic ash conveying system, coal handling system, FOPH, Demineralised plant, Dealkaliser plant.

2. Detail engineering of 24 MW, 8.5MW and 5.0 MW at other locations.

6

Birla Cellulosic

16.5 MW X 2

Manager

Mar 1996

May 2006

Core / Regular

1. Operation and maintenance of complete power plant

2. Tools, Spares & Resource planning for complete plant.

3. Operation and maintenance infrastructure development.

4. Contracts finalization

5. Co-ordination with other departments of the unit

6. Legal compliance

7. Colony civil and electrical maintenance.

One time events

1.Conceptualization, Tender finalization, vendor finalization, Detail engineering & Drawings approval, Civil works monitoring, Erection, commissioning of AFBC boiler, 16.5MW X 2 Back pressure turbine, Dense phase pneumatic ash conveying system, coal handling system, FOPH.

7

Grasim Nagda,

110 MW (various units ranging upto 40 MW)

Mechanical Engineer

Mar 1993

Mar 1996

Core / Regular

1.Operation boilers(AFBC and PF), Turbine (upto 40 MW), Ash Handling plant, Coal handling plant, FOPH, CW system etc

2. Spares planning for 12.5 MW TG, DM plant, Raw water treatment plant, FOPH.

3.Maintenance of 12.5 MW TG, DM plant, Raw water treatment plant, FOPH.

Significant Accomplishments

S.No

Particulars

AT SKS Power (300MW X 2)

1

Unit Commissioning 300 MW X 2 No’s.

2

Auxiliary power reduction -(a) Stand by Mill LO system intermittent operation, (b) Running feeders COC intermittent operation, (c) Instrumentation piping interconnection for BTG & AHP and AHP Instrument compressor shut (d) scanner air fan suction diffuser and discharge flap modification.

3

Reliability-(a) Various pumps interconnection, (b) Burner view glass cooling arrangement (c) Refractory arrangement below APH guide bearings (d) APH manual override system (e) ACW vibration reduction

4

Indigenous spares development for Chinese equipments.

5

Tools, Spares, Contracts finalization.

AT Hindalco Industries limited (150 MW X 6)

1

Commissioning of 6 X 150 MW.

2

Auxiliary power reduction -(a) Single PA fan operation, (b) CEP-VFD installation, (c) Intermittent operation of standby mill LO system.

Birla Cellulosic & Vardhaman Yarns

1

Tools, Spares, Contracts finalization for Birla Cellulosic, Vardhman Yarns.

2

Auxiliary power reduction-(a) Increasing the feed rate of Coal handling plant by de-bottlenecking. (b) Made arrangement for imported coal for Direct Feeding for Birla cellulosic, Local vendor development

3

Main Steam Improvement project in 100 TPH AFBC Boilers

4

Formulation of plant performance assessment & costing system

5

Implementation of I operate & I maintain i.e. Autonomous Maintenance. Developing operation staff for maintenance activities

6

Implemented system at Birla cellulosic for winning deming gold award, golden peacock silver award, WCM gold award, ISO 9001, ISO 18001.

7

Commissioning of 16.5 MW X 2 No’s at Birla cellulosic & 30 MW at Vardhman Yarns.

Industrial Training & Workshop:

1 Machine Tool Aides & Reconditioning, Hyderabad

2 Environment Engineering & Pollution Control at NPTI, Neyveli.

3 Bharat Heavy Electrical Ltd., Trichy

- Boiler Safety, Care & Operation

- Boiler Water Chemistry

- Boiler Operation & Maintenance

Others

Expected salary : Negotiable

Current Salary : INR 17.2 Lacs/Annum

Notice period : 1 Months



Contact this candidate