Post Job Free

Resume

Sign in

Saudi Aramco Exxon Mobil

Location:
Quezon City, Philippines
Posted:
September 29, 2021

Contact this candidate

Resume:

Elvis Cantos Canovas

Permanent Address: ** Women’s Club St.

Brgy. San Isidro, Galas, Quezon City, 1113 Philippines.

Home Tel No: +632 – 945-6686

Mobile no.: +639*********

E-mail:adouoe@r.postjobfree.com

EDUCATIONAL ATTAINMENT:

Bachelor of Science in Mechanical Engineering graduate with diploma in

5 – Years course.

Far Eastern University / Manila, Philippines

March 1979

QUALIFICATION:

30 – Year experienced in the field of Oil and Gas Construction industry, Refinery plant, Petrochemical, LNG plant, Cross Country, Power Plant, Pipeline and plant machinery with extensive exposure in Engineering, Testing Mechanical, Welding inspection, Pre Mechanical Completion (PMC), Start up and Commissioning, Line Checking.

Has gained experienced in the PMT supervision of work involved in piping and mechanical works and structural works.

Expertise in construction and maintenance to tank, vessel equipment, piping system, piperack and pipe support, shop fabrication of steel structure, pipe spools, pressure vessels, above and underground tanks for various oil refineries.

Conversant in international codes and standards such as API 1104, 620, ASME B31.1, B31.3, B31.4, B31.8, ASME SEC II, SEC V, SEC VII, SEC IX, Saudi Aramco Engineering Standards etc.

Knowledgeable in Microsoft Word, Excel, Outlook, moderate in Power point and Auto CAD.

Capable in reading mechanical schematics diagram and blueprints.

Responses positively even in pressured environment.

Flexible and responsive in the face of difficulty.

Able to read, write and verbally communicate in English.

Goal oriented and hard worker.

Versatile and adapts easily to any working conditions.

PERSONAL INFORMATION

Age : 60

Birthdate : November 10, 1957

Status : Married

Height/Weight: 5'61/2” / 165 lbs

WORK EXPERIENCE:

August 07 2019 to present Ventanas Philippines Construction Inc.

JGSummit Petrochemical Stage 1 Expansion Project

Batangas 4200 Philippines, Simlong

Position: Mechanical Engineer/Supervisor

DUTIES and RESPONSIBILITIES:

Installation and Erection Period:

Perform walk down inspection of the system and related equipment’s prior to erection completion certificate before commissioning test. Preparing documentation, Project completion handover and mechanical works safety permits.

Preparation of daily work plan activities, pre-inspection of system to be commissioned as well as coordinating to all vendors, supervisors for their activities especially for the client acceptance

Communicates all projects safety concerns to employees involved projects.

Direct involvement in assembly and installation of mechanical equipment in a work using specialist tools that checks alignment, linearity, level, torque and various other measurement leading to a functional set-up.

Checks drawing for any mistake and report the same to the construction Manager

To manage a project in good and away from any necessary problem and with durability safety quality and discipline.

Responsible for monitoring the discipline and time keeping of worker in a defined work area, identifying and disciplinary action required and informing the Site Manager.

Facilitate job safety analysis (JSA) and conduct behavior-based observation perform work site inspection including QA as required.

Review and monitor the availability of drawings, specifications, job instructions, material deliveries and tools applicable to his/her particular discipline and area of work.

Manage and monitor sub-contractor in the fabrication & installation of temporarily spool used in pre-commissioning activities such as piping air blowing, steam blowing, chemical cleaning, chemical flushing, lube oil flushing, leak testing, pneumatic testing etc.

October 16, 2015 to November 29, 2018 IMI-INDUSTRIAL MAINTENANCE INC.

GROUP OF COMPANIES

2621 Eagle Bldg. Alejo Aquino st,

Malate, Manila

Position: Consultant / Technical Evaluator

(Engineering Department)

DUTIES and RESPONSIBILITIES:

Conducts technical evaluation / interview to all applicants for USA, DIEGO

GARCIA, SAIPAN, CHAD AFRICA, JAPAN, PHILIPPINES (local hires) of diff-

irent categories, pre-evaluates soft CV’s of all on-line applicants based on

the job specifications set by the principal, employers.

Sorts-out shortlisted candidates & endorsers them to Recruitment Officers

for employer’s interview.

Conduct and assist applicants who are advised to take trade test exams

with witnesses by clients and evaluator.

Extends help to Recruitment Officers in sourcing-out applicants for rare

categories. Navigate/browses work abroad .ph, jobstreet.com, Naukri gulf &

other online search engines to find suitable candidates.

Perform other related works as directed by the immediate superiors.

November 26, 2013 to May 30, 2015 Saudi Arabia Oil Company (ARAMCO)

P.O. Box: 5000: Dhahran- 31311-KSA

Position: Mechanical Piping Superintendent

Dep’t. PMT (Project Management Team)

Rabigh II – Refining and Petrochemical Project

(CP1 / CP2)

CONTRACT PROJECTS:

Rabigh expansion petrochemical projects comprises of overall core

plants EC Expansion, Metathesis, MTBE / Isobutylene, Naptha,Refo-

rmer & Aromatics and utilities offsite & common facilities including

piping, tankage & spheres. The derivative unit Cumene & Phenol ( CP!) facilities of Cumene plant tank, piping, tank form, combined electrical substation and Emergency generator and process interface building with production capacity of 384KTA and Phenol unit capacity 275KTA having its tank form.

DUTIES and RESPONSIBILITIES:

Monitors the day to day activities of the Contractor. Works with the Construction Superintendents to ensure that there is proper inspector coverage in their discipline area is adequate in the field.

Coordinate the day to day activities of the Company provide pool inspectors in their discipline area.

Ensure that all work is performed in accordance with the scope of work, the specifications, the approved plans and procedures and the Approved of Construction drawings.

Monitor that all quality inspection activities are in accordance with the Project Quality Plan and Company and Contractor QA / QC procedures.

Provide expertise to Site Team to avoid / resolve issues in their discipline area.

Ensure that works and surveillance are performed in accordance with the Inspection and Test plans.

Ensure that all inspection reporting is performed in the field in a consistent manner and that the inspection complies with the Company and Contractor Quality Assurance and Control Plans.

Act as lowering – in inspector or other inspections slot during period of resource need.

Perform QC of all daily inspections reports. Ensure that inspections reports are properly and completely filled out.

Keep the Site Quality coordinator and the constructions Superintendent updated of the status of work performance for invoicing purposes and quality issues.

Ensure proper lift and civil related techniques are performed per industry standards and practices.

Ensure coating inspection (jeeping) and any associated repairs take place in the lowering in process.

Ensure that pipe is properly supported and not in contact with French walls after lowering – in.

Review PTW Permit to Work of contactor base on JSA and signed the

Work permit.

Reviews Method Statement and provide comments related to piping engineering designs.

October 01, 2012 to July 30, 2013 AIR RNERGI / RASGAS COMPANY LIMITED

GREENFIELD PROJECT / ONSHORE- LNG Plant

Position: Mechanical Construction Supervisor

Department : OPD- Operation Project Dept.

CONTRACT PROJECTS:

Ras Laffan / Construction, Shutdown of Train- 3,4,and 5 & Utility Facilities

Ras Laffan / Qatar

DUTIES AND RESPONSIBILITIES:

Monitor overall activities construction including such as HSE for

Area Tie-in and Process Area.

And follow Specification and Procedure as per below;

Acknowledge AFC Drawings for fabrication & Installation

Check and monitor Tools Equipment, Welding consumable

Check & monitor Preservation, Pipe Internal cleaning

Monitoring Schedule for achieve result target

Check if the latest Construction drawings are used

Monitor revision line & consult with Engineering

Check work front & coordinate with other discipline

Acknowledge of site situation for next activities

Manages Man power for speed of support progress

Check flange alignment of rotating equipment

Performance piping line check

Consult punch work with subcontractor

Check & ensure piping test preparation is properly mode

Check & Review of test packs prepared by Sub contractor

Coordinate and consult with sub contract and other discipline concerning testing activity.

Witness of piping pressure test

Check & ensure piping flushing & blowing preparation

Perform piping reinstatement activity check

Coordinate & consult with subcontractor concerning overall plan & progress project

Pre- commissioning activities up to start up

Commissioning activities

February 17, 2012 to June 30, 2012 AIR ENERGI / RASGAS COMPANY LIMITED

BROWNFIELD PROJECT (Onshore / Offshore)

Department: OPD- Operation Project Department

Position: Mechanical Construction Supervisor

CONTRACT / PROJECTS:

RASGAS / Onshore Project – LNG Plant (Shutdown Project of Train – 1/2/3/5/6 & 7

and Construction Non – EPCM (PCI) Projects& EPCM Projects, CAT VI

and CAT V Projects,

Ras Laffan Industrial City, Qatar

DUTIES AND RESPONSIBILITIES:

Implement good Quality system program, conduct surveillance and

Monitoring to ensure conformance to applicable ASME Codes and client

Specification.

Review Shutdown packages drawings base on scope of work with

relevant in shutdown or for construction.

Monitor and supervision activities of the contractor related to issued

IFC drawings and specifications and associated related to mechanical

works.

Supervision and monitor the contractor to install Permanent purging,

Draining facilities for Feed lines Train – 1 / 2 SRU incinerators.

Nitrogen line Purging construction execution plan constructability

Review.

Train 4 / 5 – Review packages, JSA, ITP and supervision for execution

fabrication, installation of pipe supports of pipe (FIV) Flow Induced

vibration Mitigation.

Review PTW Permit to Work of contactor base on JSA and signed the

Work permit.

Obtain and make it DPR Daily Progress Report which is In Progress,

Complete, Activities for tomorrow and to be done.

Review MOC Management of Change.

Review and execute PSSR Pre- Start Up Safety Review Checklist.

Review project specification, technical clarifications and construction

drawings.

Carryout works scheduling, material inspection, cost control project

Project supervision and documentation.

December24, 2009 to September 10, 2010 AIR ENERGI / QATARGAS QCS ( QATAR CONOCO SHELL)

PMT Engineering Department

Position: Piping Engineer / Piping checker

CONTRACT / PROJECTS:

QATARGAS 3 and 4 QCS / Onshore Project

Ras Laffan Industrial City, Qatar

DUTIES AND RESPONSIBILTIES:

Implement good Quality system program, conduct surveillance and monitoring to ensure conformance to applicable ASME Codes and Clients specification.

Review sub-contractor detailed Method Statement Inspection and Test Plan, QC procedure and turnover data that are develop by their Q.C group.

Ensure implementation of QC procedures by continuous monitoring and scheduled audits.

Review inspection, test result and material certificates for compliance, acceptability and recommend connective action where deemed necessary.

Raise non-conformance reports on any activities that deviate from projects specific requirements and follow up trough satisfactory closure.

Attend scheduled quality meeting and discuss / resolve issues affecting performance.

Ready to demonstrate the compliance trough proper documentation of all activities performed and ensuring the end products meets company requirements.

Communicate safety initiatives, achievements, experiences and issues arise from other sites and projects with team members and contractors / sub contractor safety advisers.

Assess the hazards and risks on the job, increase safety awareness and hold safety tool box talks to achieve zero lost time incident and accident.

Carry out inspection on equipment, valves, piping, welding, tanks, and vessels, ensure all activities are being implemented as per the latest revision of isometric drawing, P&ID's, specs, and standards.

Verify traceability of materials during in process inspection for all piping and mechanical components and checks accordingly to its color coding, stock code and heat number.

Witnessed hydro and pneumatic testing activities and ensure compliance to safety and applicable company approved procedure.

Involved in final Box – up of vessels and strainers, installation of control valves, ensure correct materials and proper orientation and internal cleanliness of piping by using Baroscope.

Carry out line checking for Pre – Mechanical Completion (PMC) activities as per system cleaning block and generate discipline punch list as per latest revision of the P&ID.

Involve in final walk down for System Mechanical Completion Certificate (SMCC).

Witness final reinstatement of control valve, check ID / Tag and correct color code for gasket and ensure it complies to isometric and P and ID drawings.

Carry out inspection on flanges of valve and piping recommend for re - facing if any major damage observed on serration of flanges raise face.

Verify cleanliness / proper preservation of bolts and nuts as per specification. Witnesses bolttorquing and ensure compliance to the procedure.

Ensure correct flow direction as per requirement on the system.

Review welding procedure specification, welder’s qualification, welding data, verification of codes and engineering design, requirements for material components.

Verified base materials and welding filler metal are used on each base metal or combination of base materials.

Review weld and material traceability, verify NDT requirement as per piping class, such as RT, MPT, PT, PWHT, PMI and hardness test.

Surveillance / Monitoring of welding activities of site ensure all production welds conforms to applicable codes and client requirements.

November 5, 2008 to December 22, 2009: AIR ENERGI / RASGAS COMPANY LIMITED

EXXON MOBIL

DOHA, STATE OF QATAR

PMT. ENGINEERING DEPARTMENT

Position: Piping Engineer / Piping Checker

Contract / Project:

Rasgas Onshore Expansion Project Phase – 2 (Train – 6 / 7 and AKG – 2 )

(LNG) Liquified Natural Gas Plant / Raslaffan, Qatar

DUTIES AND RESPONSIBILITIES:

Ensures engineering issues related to piping fabrication, installation, testing, pre – mechanical completion, and pre – commissioning is consistent with the project Line Procedure and Requirements.

Provide technical input to pre cleaning / flushing Piping Line Check List and close out of resulting punch lists.

Provide input to PMT engineers or other specialist in support of mechanical completion Piping Line check list and Punch list close out reviews.

Assist PMT in resolving in a timely manner field piping – related issues that arise between the EPC Contractor, PMT, OED, OPCO, Vendors, and other interfaces.

Provide technical support as required on the pre – mechanical completion and mechanical acceptance activities.

Review mechanical completion of project basis, technical requirements for piping system and other assigned projects.

Assures project safety and quality expectations are satisfied.

Keeps supervisor informed and issues and schedule progress through regular reporting.

Contributes to continuous improvement by submission and stewardship of lesson learned.

February 4, 2007 to October 30, 2008: NACAP – SUEDROHRBAU SAUDI ARABIA LIMTED

Dammam, Kingdom of Saudi Arabia

Position: Pipeline Project Engineer (Onshore /Offshore

Contract / Projects:

Jubail Chevron Phillips Co. And Saudi Aramco

(“Feed Supply from Juaymah / Contract # JCP – 0074“)

Shedgum Natural Gas Line ( NGL )

DUTIES AND RESPONSIBITIES:

Head project meetings to collect and disseminate information per training to projects.

Technical specification review and resolution.

Coordinate the collection and disseminate of technical information between / within the company and customer.

Schedule and monitor program activity to achieve on “on time” result including follow up with external supplier to ensure timely response to action items.

Monitor program cast activity to achieve an “in budget” result.

Prepare quotations utilizing supplier information, cost standard, technical information from quality, manufacturing engineering, design.

Create bill of material, detail instruction for manufacturing process of new part, specification for packaging, external supplier specification to provide standard cast, structure and instructions from manufacturing.

From customer drawings, determine possibility of failure in our manufacturing process, analyze process to learn likelihood of detection and resulting effect on customer product. Suggest preventing steps for correction.

Ensure the project charges are correctly represented to accounting closing process.

Evaluate projects performance of functional areas.

Perform works which involve conventional methods and types of plans, investigation, survey, structures or equivalent with relatively few complex features.

Select and recommends procedure or development of methods.

Assignment involves activities requiring knowledge of standard principles and technique. Assist in mentoring of Engineering Associates.

Direct and supervise other engineering activities.

Assist in the coordination of pricing, estimating, scoping strategies for proposed projects and in the development and preparation of technical specifications.

Prepare design, drawings, plans and specification for projects, engineered system, technical equipment or components.

Supervises technical testing, survey or field engineering teams.

Assist in client contract and communication pertaining to specific projects.

Assist in the analysis of reports, maps, blueprints, drawings, test and aerial photographs on soil composition, terrain, hydrological characteristics, and other topographical and geologic data to plan and design project.

Prepare design computations and quantity estimates.

Assist in the preparation or modified of reports, specification, plans, construction schedules, environment impact studios, permits and design for project.

Instruct technicians to reduce design to working drawings.

Review and motions project progress to assure quality and adherence to requirement of contract documents.

Responsible for control of work in progress, ensure accurate client, billings, monitor outstanding account receivable and collection efforts on related projects.

Perform other assigned duties as deemed necessary by their supervisor.

Receives instructions on assignments objectives, complex features and possible solution.

Receives / solicits guidance on unusual and / or complex problems and supervising approval on work plans.

October 14, 2003 to December 30, 2006 NACAP- SUEDROHRBAU SAUDI ARABIA LIMITED

Dammam, Kingdom of Saudi Arabia

Position: Piping Engineer

Contract / Projects: Saudi Aramco

Saudi Aramco Contract # 660014789”

(HNRP Upstream / Downstream Gas Pipelines)

Saudi Aramco Contract # 660*******

(Tie – in 20 Flowing and Trunk Line 1, 2, & 3)

Saudi Aramco Contract # 660*******

(SHY – 1 P / L Capacity, Shedgum Booster Pump)

Saudi Aramco Contract # 660*******

(Khurais Seawater Injection and Distribution Headers)

DUTIES AND RESPONSIBITIES:

Responsible to review as built drawings for compliance with issued for construction drawing as related to piping.

Reviews proposed engineering changes received from the constructors and the advices the Constructions and advises the Construction Manager or Assistant Construction Manager of any potential issues related to area of expertise.

Work with the Construction Team to define workable engineering solutions as required for the construction package(s) assigned with focus on the piping requirement for water storm sewer.

Reviews Method Statement and provide comments related to piping engineering designs.

Provide answer to engineering related RFI's in conjunction with the Design Team and Engineer.

May conduct inspections, to determine if specialty and other piping works have been done in accordance with contract specifications.

Maybe required to witness pressure test, destructive and non – destructive test on metals and other materials through magna flux, dye penetrant, radiographic tension, point thickness and resistivity.

Calls for additional testing or repeat testing as required.

Prepares periodic special reports summarizing engineering related issues related piping installation, testing and acceptance.

Responsible for following up on instructions and commitment associated with the construction matter.

Perform other engineering task as may be deemed necessary by the construction and assistance construction manager.

July 01, 2002 to September 10, 2003: NACAP – SUEDROHRBAU SAUDI ARABIA LIMITED

Dammam, Kingdom of Saudi Arabia

Position: Site Engineer

Contract / Project: Saudi Aramco

Saudi Aramco Contract # 660010935

(Haradh Al – Crude Increment III Pipeline Project)

Saudi Aramco Contract # 660012727

(Khuff Gas Project)

DUTIES AND RESPONSIBILITIES:

Monitors the day to day activities of the Contractor. Works with the Construction Superintendents to ensure that there is proper inspector coverage in their discipline area is adequate in the field.

Coordinate the day to day activities of the Company provide pool inspectors in their discipline area.

Ensure that all work is performed in accordance with the scope of work, the specifications, the approved plans and procedures and the Approved of Construction drawings.

Monitor that all quality inspection activities are in accordance with the Project Quality Plan and Company and Contractor QA / QC procedures.

Provide expertise to Site Team to Avoid / resolve issues in their discipline area.

Ensure that works and surveillance are performed in accordance with the Inspection and Test plans.

Ensure that all inspection reporting is performed in the field in a consistent manner and that the inspection complies with the Company and Contractor Quality Assurance and Control Plans.

Act as lowering – in inspector or other inspections slot during period of resource need.

Perform QC of all daily inspections reports. Ensure that inspections reports are properly and completely filled out.

Keep the Site Quality coordinator and the constructions Superintendent updated of the status of work performance for invoicing purposes and quality issues.

Ensure proper lift and civil related techniques are performed per industry standards and practices.

Ensure coating inspection (jeeping) and any associated repairs take place in the lowering in process.

Ensure that pipe is properly supported and not in contact with French walls after lowering – in.

Perform spot reviews and check of contractor's records in their discipline area to ensure proper documentation is maintained.

Assist with quality assessments being performed in their area.

Perform regular assessment and audit to ensure that each equipment, machinery, or tool operator is qualified for work in accordance with their job task, Project requirement and industry practices.

June 03, 2001 to June 30, 2002 NACAP – SUEDROBAU SAUDI ARABIA LIMITED

Dammam, Kingdom of Saudi Arabia

Position: Mechanical Engineer / Procurement Engineer

Contract / Projects: Saudi Aramco

Saudi Aramco Contract # 44496 / 00”

(Haradh Gas Gathering Manifolds and Transmission Pipe lines)

Saudi Aramco Contract # 640*******

(Qatif Downstream Pipeline Project)

DUTIES AND RESPONSIBILTIES:

Mechanical, Structural Construction, hook up for both piping and structural activities.

Assignment as Spare parts data Packages Coordinator for Haradh Gas Gathering Manifold and Transmission Pipeline including other Aramco Project.

Prepare and / or approve preliminary materials list, test and assembly procedures and data packages.

Work out design changes on part or assemblies resulting from new requirement, changed concepts, test, manufacture or service requirements.

Assist in and / or perform the testing of product / components, results analysis and conclusions.

Determine and establish specifications through engineering calculations and layouts.

Study drawings, specifications and bill of quantities of material requisitions.

Prepare inquiries and evaluate quotations from the supplier and sub-contractors for both on going and tender projects.

Prepare RFQ's and BCM's and coordinate to the Site Engineer with their material requisition.

Quantity take off, prepare site material requisition and purchase orders,

maintain engineering records and files for future availability.

March 12, 1990 to July 30, 2000 MOHAMMED AL – MOJIL GROUP

Dammam, Kingdom of Saudi Arabia

Position: Mechanical / Piping Superintendent

Contract / Projects:

Saudi Aramco Riyadh Refinery Shutdown Works turn around Services

(Riyadh, Saudi Arabia)

Saudi Aramco Berri Gas Plant DE mothballing and Inlet Piping Facilities

(Jubail, Saudi Arabia)

Saudi Aramco Recondition of Jeddah Refinery fluid

(Jeddah, Saudi Arabia)

Qassim Cement Plant Shutdown

(Qassim, Saudi Arabia)

Berri Piping Facilities Project

(Jubail, Saudi Arabia)

Ar-Razi Methanol Plant Project

(Jubail, Saudi Arabia)

UOC Mechanical Fabrication & Erection Works

(Jubail, Saudi Arabia)

SADAF Expansion Project

(Jubail, Saudi Arabia)

SHARQ Sped II Expansion Project, Debottlenecking/Shutdown Works

(Petrochemical Plant) – Jubail, Saudi Arabia

Catalytic Cracking Unit

(FCCU) – Jeddah, Saudi Arabia

Yanpet Maximum Capacity Expansion Projects Shutdown Works

(Yanbu, Saudi Arabia)

MAIN FUNCTIONS:

Responsible for the mechanical construction and maintenance for tank and vessels, equipment, piping system, pipe rack and pipe supports construction, electrical and instrumentation system installation, construction of ladder and platform and all other related mechanical/piping and maintenance works in the following major project of MMG.

DUTIES AND RESPONSIBILITIES:

Responsible for the mechanical piping, supports, hanger and welding installation

Provide leadership for the safety, accident prevention, fire prevention progress on the project.

Determine manpower tools, equipment and material requirements for the crafts.

Evaluate and collaborate piping support installation, small and large bore pipe installation, insulation activities with flushing and pressure testing.

Develop daily craft assignments to be performed and review work accomplished.

Prepare short end long term schedule, interface with other discipline superintendents and field engineer,

Supervise and direct subordinate personnel and craft in construction activities within the piping discipline.

Develop civil craft loading and manpower forecasts. Monitor actual works performance compared to the project budget and schedule.

Coordinate activities with other disciplines and clients residence representative as instructed by construction management.

Perform personal evaluations on subordinate personnel. Ensure the most current design documentation is being utilized to complete activities.

Coordinate sub-contractor labor supervision and craft distribution as required, Interface with labor relation for Craft Recruitment and training programs.

October 11, 1984 to Jan. 25, 1990: MOHAMMED AL-MOJIL GROUP

Kingdom of Saudi Arabia

Position: Site Engineer

Contract/Projects:

Petro Rabigh Refinery Complex Mechanical Erection Subcontract

(Robigh Saudi Arabia)

Shedgum GOSP 2 & 3 Wet Crude Facilities Project

(Saudi Armco Project / Shedgum, Saudi Arabia)

Yanbu Petrochemical Complex Z-004 Offlot Areas Above Grade Project

(Yanbu, Saudi Arabia)

Petrokemya Maintenance Works

(Jubail, Saudi Arabia)

Shedgum GOSP 3 Desalting Facilities Project

(Abqaiq, Saudi Arabia)

Berri Desalting Facilities Project

(Jubail, Saudi Arabia)

DUTIES AND RESPONSIBILITIES:

Review project specification, technical clarification and construction drawing.

Carryout works scheduling, material requisition, cost control project supervision and documentation.

Supervision of works and coordination with client’s representative, consultants and sub contractors on technical matters.

Ensure timely and smooth progress of works.

Ensure quality of works is achieved and safety regulations are complied.

Maintain documentation relating to work on the contract.

Monitor the work of contractors and consultants to ensure contract and project objectives are achieved or exceeded.

Jan. 06, 1980 to Sept. 30, 1984: ENGINEERING EQUIPMENT INC.

Manila, Philippines

Position: Mechanical/Piping Supervisor

PROJECT

Involves in the Crude Distribution Debottlenecking Pre-Shutdown Works at Pilipinas Shell Petroleum Corporation, Shell Refinery

Handles the erection of 100,000 m3 double steel floating rook tanks

Participate in mechanical and equipment installation at Nomoc Nickel Refinery Project.

DUTIES AND RESPONSIBILITIES:

Handles the supervision of fabrication, installation of structures, pipe spools, platform, pressure vessel above ground and underground tanks for the various oil refineries in the Philippines.

Witness hydrostatic testing of valves, riser, cross main & branch line piping

Implement safety rules & regulation

ACHIEVEMENTS/TRAINING/SEMINARS

NSC Defensive Driving Course ( Saudi Arabia ) June 24, 1988

Basic Safety Supervisory Course ( Jubail, Saudi Arabia ) June 10, 11, 1992

Centrifugal Compressor September 19, 1999

Power Plant Operation and Proper Waste Disposal December 8, 1995



Contact this candidate