Post Job Free
Sign in

Power Plant Cycle

Location:
Bangladesh
Salary:
150000tk
Posted:
September 24, 2021

Contact this candidate

Resume:

Application for the post of Maintenance Engineer

Resume ofMD. Ejarat Ali

Now at present Works ASIA PROJECTS ENGINEERINGPTE. LTD.( APECO )

Contact-Email: adosw2@r.postjobfree.com : 018********, 017********, 019********.

WorkingExperience 20 Years over of Power generation site All Kind of mechanica l Erection,Commissioning Maintenance works.

# Summary of Works

Skilled Mechanical Engineering & Technical with more than 20 years of Erection, Commissioning,Maintenance in the most modern power plants including USA based Multinational Power Company,AES/GLOBELEQ/PENDEKER ENERGY, and other big power plants in Bangladesh. Worked on Gas Turbine Frame AEG 5, 6, GE-9E,MHI-M701F3,MHPS-M701F4 Ansaldo V-94.2 or Fuji Steam Turbine &Thermal power plant(TPS Russia & IHI Com of Japan) or HFO/DFO power plant, Another works of power plant side, Hyundai HRSG, IHI- Boiler,-BFP,HP by Pass, LP by Pass Valve, CCI Valve etc. Water wall Erection & maintenance, I also works power plant all Auxiliary mechanical equipment, High Skilled Engineer & Technical Team Leader of overall supervision of power plant project Erection, Installation, Assembly Service, repair & maintenance, Commissioning or dismantling works power station project of Bangladesh,

# Worked with several international vendors & Company such asAEG- BABCOCK,MHI, IHI, CCI, FUJI, ALSTOM, SIEMENS, CPGS, Hyundai, Bastak, BHEL,,JEL

# Skilled in Mechanical maintenance of Gas and Steam turbines, compressors, boiler, pumps, Water Treatment and Waste Water Treatment. I have Works Such as CCPP,GT,GTG, ST, STG, TPS, HFO/DFO power plant. Works including piping systems, steel structures, all types of pump, valve, compressors, & water or air cooling system all kind of fabrication & Welding Qc works or DPT, NDT, Hydro Test, in power plant site

objective;Develop my career as a power plant Construction or maintenance in technical & Engineering position with an expanding company where my strength and knowledge can play a significant role to achieve the business targets. strong interested in pursuing Professional development opportunities, including specialized training & challenging career in a private organization’s growth area.

Education Qualification

BidyutUnnouneBord High School

#Examination’s Secondary School Certificate (Science)

Passing Year: 1990

Board: Jessore

Kushtia polytechnic Institute

#Examination: Diploma-in-Engineering ( Mechanical )

Passing Year: 1993-94

Board: Dhaka

Professional Training Courses

Industrial Training for Renwick Jajneswer& Co (BD) Ltd,

Kushtia, from 22nd January to 24th March 1994,

Personal Information

NAME: MD, EJARAT ALI

Father’s Name : MD. YOUNUS ALI.

Mother’s Name: Mrs. Hashina Begum

Present Address: Borpa, Rupshi, Rupganj, Narayanganj.

Post Cord : 1464

Contact No : 018********,019********, 017********..

Email ID : adosw2@r.postjobfree.com

Date of Birth:16th December 1975.

Nationality : Bangladesh [ by birth ].

National ID No ; 733-***-**** .

Passport No .

Religion : Islam

Marital status : Married

Introduction of Working Experience-

#Maintenance of Power plant in Bangladesh.( maintenance & commissioning works)

01.Now at present Works ASIA PROJECTS ENGINEERINGPTE. LTD.( APECO )

Joint Date 1st February 2020

02.EGCB Haripur 412MW CCPP( MHPS- M701F4 Gas Turbine Maintenance of Ti+ Works )

Period. 19 October 2018 – 15 November 2018.

03.NWPGC Bheramara 412 MW CCPP ( MHPS – M701F4 Gas Turbine Maintenance of CI )

Period. 06 June 2018 to 29 June 2018

04.Combined cycle two Plant unite 01 .360mw Haripur unite 02 .450mwMegnaghat(01.MHI GT M701F,

02.V94.2)

Period : under maintenance team from 01/08/2004 to still now ( works only plant outage time)

05..EGCB Siddhirganj 2 X 120MW Peaking power plant.( Gas Turbine GE 9E,)

Period: under maintenance team from 12/08/ 2015 to still now ( Works only plant outage time )

06.71MW Gas Turbine power plant Baghabari.(Fore BPDB Baghabari power station.)

Period : 22nd Dec 2006 to 11th January 2007

07.150MWx 2 Ashganj thermal power plant ( JURONG Engineering Bangladesh & IHI com of Japan.)

Period : 1st January 2006 to 20th December 2006

08.Rehabilitation of two AEG kings 20MW x 2 Gas Turbine & 20MW x 1 Hitachi Gas Turbine atBheramara

power station. Bangladesh.(Works at. BABCOCK LENTJES KRAFTWERKSTECHNIK GMBH )

Period : April 1997 to 10th August 1999.

Construction project of Power Plant in Bangladesh (Erection & Commissioning)-

01.Combined Cycle power plant project works (two project) at

.(a).AES Haripur 360 MW combined cycle power plant project,( Period: March 28/2000 to May 05/2001 )

.(b).AES Meghnaghat 450MW combined cycle power plant project,(Period: 25/06/2001 to 25/07/2002 )

02.Thermal power plant project works (one project) 01. TPS Russia 210 MW Siddhirgonj power project

Period : August 17, 2002 to July 05 / 2004

03.EGCB Siddhirgonj 2 x 120MW Peaking power plant project Unite 1,2.GE 9E Gas Turbine simple cycle

.Period : December 2007 to October 2009

04..Caterpillar power generation System ( 2 x 100MW HFO power plant construction Unite – two

Period : June 05, 2011 to October 25th 2011

05..Acorn Infrastructure Services Ltd. ( Caterpillar power generation system )

.Period : 1st November 2011 to 31 January 2012.

Maintenance Works of power plantDetail s:

#Maintenance Team Leader of Combined cycle power plant( Contact bases)-

I am involve Haripur Power Ltd 360MW., &Meghnaghat Power Ltd.450MW, (Combined Cycle Power Plant)

Period : under maintenance team from 01/08/2004 to still now ( works only plant outage time Contact System) Duties/Function: Maintenance of MHI GT M701F Gas Turbine & Ansoldo-VS94.2 GasTurbine Major overhauling (At the time of Outage) works in CI, HGPI, MI& all mechanical auxiliary equipment works at the time outage plant,

Responsibility of works :C.ICombustor Inspection, Fuel Nozzle Combustor basket Transition piece, by pass elbow cross Flame TubeHGPI – Hot Gas Path Inspection, Flame indicator, Flame Detector, fuel nozzles, combustor baskets, Transition pieces, Turbine blades, Turbine vanes, compressor last Row & OGV’S blades and diaphragms, Exhaust cylinders, bypass elbow, cross flame tube, etc. M.I – Major Inspection of Gas Turbine Components: Inlet Duct, IGV Compressor, Fuel nozzle, Combustor basket, Transition piece, by pass elbow, Cross Flame Tube, vane Segment & Turbine Blade ring [ row 1,2,3,4 upper & lower . seal ring housing, Disassemble and assemble vane & ring segment, Replace the brush seal ring housing..all components dismantling & mantling.

#Maintenance Team Leader ofGas Turbine( Contact bases )

Company : Electricity Generation Company of Bangladesh Limited ( EGCB )

Project : Siddhirganj 2 X 120MW Peaking power plant.

Period : under maintenance team from 12/08/ 2015 to still now ( Works only plant outage time Contact System)Duties/Function: Maintenance of GE 9E Gas Turbine Works in CI, HGPI, MI,& all mechanical auxiliary equipment works at the time of outage plant

Responsibility of jobs:Gas turbine components, inlet duck, igv, fuel nozzle, combustor basket, transition piece, cross flame tube, turbine nozzle, & turbine blade, turbine coupling bolt, thrust bearing, journal bearing, all disassemble and assemble works, supervise works before working tools & manpower arrangement

#Mechanical Supervisor of Gas Turbine ( Contact bases )

Company : Bharat Heavy Electrical Limited

Period : 22nd Dec 2006 to 11th January 2007

Position : Mechanical Supervisor

Project :71MW Gas Turbine power plant Baghabari.(Fore BPDB Baghabari power station.)

Duties/Function: Maintenance of Gas Turbine (MI)

Responsibility of jobs:Gas turbine components, inlet duck, igv, fuel nozzle, combustor basket, transition piece, cross flame tube, turbine nozzle, & turbine blade, turbine coupling bolt, thrust bearing, journal bearing, all disassembleand assemble works, supervise works before working tools & manpower arrangement.

#Mechanical Supervisor Boiler ( over all site)

Company : The Bengal Electric Ltd.

Project : 150MWx 2 Ashganj thermal power plant ( JURONG Engineering Bangladesh &IHI com of Japan.)

Period : 1st January 2006 to 20th December 2006.

Position : Mechanical Supervisor ( over all site)

Duties/Function : Maintenance of Boiler site including all mechanical works. & prepare of commissioning.

Responsibility of duties :Supervise of rotor m/c such as FD fan, recycling motor, BFP, Compressor, Supervise boiler excurse – water well, air preheated, boiler dram, super heater, Lp, Ip, Hp dram,Hp heater, Lp heater, orburner site, Supervise of Hp / LP valve including boiler site all valve maintenance, repair or replacement works, prepare weekly look ahead activities and preparation in the execution of job assignment. supervise of manpower arrangement or distributions .

#Sub-Assistant Engineer Mechanical.

Company : BABCOCK LENTJES KRAFTWERKSTECHNIK GMBH

Project :Rehabilitation of two AEG kings 20MW x 2 Gas Turbine & 20MW x 1 Hitachi Gas Turbine at Bheramara power station. Bangladesh.

Period : April 1997 to 10th August 1999.

position : Sub-Assistant Engineer Mechanical.

Duties/Function : Mechanical works including realignment of Gas Turbine & Generator(AEG kings 5001.Frame)

Responsibility of Works : Mechanical works Including complete Refurbishment of the frame 5001 main Gas Turbine. mechanical works including Realignment of turbine & generator, Checking, cleaning & changing IGV Spear, Hot Gas Path spear, Thrust bearing & journal bearing, I have also works generator dismantling, open generator rotor whitener ring & inside fiber piece after air & chemical cleaning of rotor inside and all fiber piece cleaning or installation agene, after checking insulation up of generator rotor,last all are mantling & fitting, I am also works overhaul of Detroit A77 500HP Diesel engine, installation of torque converter, & repair or installation of gearbox.

Experience of power plant Construction project Erection, Commissioning Details.

#Mechanical Inspection Engineer ( for contact bases)

Company: ACORN INFRASTRUCTURE SERVICES LTD. ( CATERPILLAR POWER GENERATION SYSTEM.)

Project ;100MW HFO ACORN INFRASTUCTURE SERVICES. ( Bangladesh 8 X 16CM43 Jhulda power plantChittagong. )

Period : 1st November 2011 to 31 January 2012.

position : Mechanical .Inspection Engineer

Duties/Function;- Inspection & Checking of Project Works.

Responsible Of jobs :all Installation Erection & commissioning ( final inspection checks for B-CAT / MOODY INTERNATIONAL or CPGS Team Together checking point check in – Turbo Charger Cleaning,Exhaust Duct Installation erection, & cleaning, Sliding & fixed point checking and duct line leveling, Alignment of all Expensionjoint /Compensator this site.

#Project Engineer Mechanical:

Company: Dipon Gas Co Ltd :(CATERPILLAR POWER GENERATION SYSTEM ( 2 X 100MW PROJECT IN Bangladesh.)

Project 01. 8 X 16CM43 at Karaniganj.( 100MW HFO Power PAC MutiaraKaraniganj power plant Ltd. Dhaka.)

project 02. 8 X 16CM43 Jhulda Chittagong. ( 100M HFO ACORN INFRASTRUCTURE SERVICE LTD. Jhulda power plant Chittagong Bangladesh. )

period : June 5, 2011 to October 25th 2011.

position : Project Engineer Mechanical

Duties/Function:- Fabrication, Assembly, Installation,Erection for exhaust duct, Combustion air Line, water, fuel & other pipe line, Including all over mechanical works.

Responsible Of jobs : all Fabrication, Assembly, Installation, Erection for exhaust duct, Combustion air Line, water, fuel & other pipe line, Including all over mechanical works Erection & commissioning .

#Assistant Engineer Mechanical

Company : The Bengal Electric Ltd. Bangladesh & Bharat Heavy Electrical Limited India ( BHEL India )

Project: EGCB 2 x 120MW peaking power plant constructionproject at SiddhirganjNarayanganj, Bangladesh

Period:December 2007 to October 2009

Position; : Assistant Engineer (Mechanical)

Duties/Function :Dismantling of 80 MW after Erection & Commissioning of Frame GE- 9E, 2 Pieces power plant including works.

Responsibility of job :supervise of materials Shifting, Caring &Lifting* Erection &installations before finial preparation or alignmentchecking. * Supervise works before working tools & manpower arrangement. * Organizedarrangement manpower Distribution to their respective areas of works . * Supervise completion of different construction related civil and mechanical works, like fixing,fitting & alignment of insert plate and anchorbolts. all kind of fabrication & Erection works, like Gas Turbine, by passduck, by pass stake, air duck/filter, exhaust diffuser, or water& cooling system, including all works of power station,( this site 132 KV sub station Erection & anchor bolts fitting works), prepare weekly look ahead activities and preparation in the execution of job assignment

#Mechanical Supervisor( Boiler site )

Company: The Bengal Electric Ltd.

Project : TPS Russia 210 MW Thermal Power Plant Project.SiddhirganjNarayanganj Bangladesh.

Period : August 17, 2002 to July 05, 2004

Position: Mechanical Foreman

Duties/Function : Including boiler site Erection & commissioning.

Responsibility of job;Erection of Boiler Structure, Economizer, Super heater & Combustion Chamber.# Maintenance of Boiler, Economizer, Super heater & Combustion Chamber,# Organized arranger manpower distributions to their respective areas of work.# Prepare weekly look ahead activities and preparation in the execution of job assignment.

#Mechanical Team Leader

Company:Bastek Company LTD.(HYUNDIA 450MW CCPP CONSTRUCTION PROJECT.)

Project : AES Meghnaghat 450MW Combined Cycle Power Plant Project.

Period : June 25, 2001 to July 25, 2002

Position:Mechanical Foreman.

Duties/Function: Erection, Maintenance & commissioning of HRSG- Unit 1, 2 + 2- Ansaldo V 94.2 Gas turbine.Responsibilityof jobs:#Supervise of shifting, caring,& lifting of materials, preparation or installation before finial alignment checking. organized arrangement of manpower,distributions to their respective areas of works# Erection, fitting and alignment of gas turbine combustion chamber, generator, air intake filter, silencer, damper and duck exhaust diffuser, air dryer system,GTcompressor washing system, IGV actuator, ignition gas system intermediate shaft coupling, including all works of ( 2-HHI, HRSG) Heat Recovery Steam Generator & Unit 1,2.,Gas Turbine Including all mechanical works as a Alignment, Leveling, Clearance, bolt tightening for 2-Ansaldo V94.2Gas turbine.,Documentation arrange for testing activities such as Hydro test and pneumatic test. I also works 150MW Fuji steam turbine.

#Mechanical Team Leader

Company: Cathweld&BastekJoint Venture Company BD, LTD.(HYUNDIA 365MW CCPP CONSTRUCTION PROJECT.) t

Project; : AES Haripur 360MW Combined Cycle Power Plant Project.

Period : March 28, 2000 to May 05, 2001

Position: Mechanical Foreman

Duties/Function : Assembly, Installation, Erection & commissioning of MHI-M701F Gas turbine or HRSG Unit including all works & water intake site works.

Responsibility of works:-Supervise and prepare lifting materials for H R S G, Main stack or MHI-M701F Gas turbine -accept once of installation and finial alignment.# Supervise pre- commissioning activities of mechanicalequipment such as cooling fan /tower,horizontal & vertical pump and waste water system of the plant.# I also works 118 mw Fuji steam turbine & condenser.# prepare weekly look ahead activities andpreparation in the execution of job assignment.# Organized arranger manpower distributions to their respective areas of work.

Extra works experience

Bangladesh Meteorological Department (BMD)

Company : The Bengal Electric Ltd Bangladesh.

Project ; THE IMPROVEMENT OF METEOROLOGICAL RADAR SYSTEM AT COX’S BAZAR AND KHEPUPARA UNDER JAPAN’S GRANT AID. (Japan weather Association):

Position ; Supervisor

Duties/function; Assembling, installation fabrication Erection &Commissioning

Special works Experience Detail.

Company :The Bengal Electric Ltd

I have working of 1000TON, 600TON,200TON barge carne making works.Assemble, fabrication, installation, grinding and skilled welding or Erection commissioning [including all works inching on by handworks)

Project Safety Training.

# I also participated in all the safety training sessions of each project.I also computer knowledge &works Microsoft word, Excel, Power point, Access or internet use .

Thanks for

MD.Ejarat Ali



Contact this candidate