Post Job Free
Sign in

Power Plant Civil Engineering

Location:
Akora Khattak, Khyber Pakhtunkhwa, Pakistan
Salary:
Negotiation
Posted:
September 24, 2021

Contact this candidate

Resume:

RESUME

NIAZ FARAZ KHAN SWATI

QA/QC INSPECTOR CIVIL

Have 18 Years of professional experience as a QA/QC Inspector civil Senior QA/QC Inspector civil in different Kazakhstan and Pakistan Oil & Gas Projects. I have operated with diversified domain projects in Civil Engineering from medium to large scale industries which gave me in depth understanding for handling various domain areas in Civil Engineering. I have handled various critical and challenging projects from design stage to implementation stage and ensured that the projects gets implemented as per specification in stipulated time with quality. Having equipped with various latest engineering tools and techniques, I can handle high pressure environmental with ease. I am open minded and a good team player with efficient communication skill to present my points precisely to listeners.

PERSONAL INFORMATION:

Nationality : Pakistani

Religion : Islam

Marital status : Married

Pass Port No : BQ8911222

D.O.B : 03-03-1978

Language Spoken : Urdu, Pashto, English

Cell No : 034*-*******033*-*******

E-mail ID : *********.******@*****.***

ACADEMIC DURATION BOARD/INSTITUTE

B. TECH (Hons) 4 years D.I.H.E SINDH (Karachi)

D.A.E 3 years B.T.E KPK (Peshawar)

S.S.C B.I.S.E KPK (Abbottabad)

ADDITIONAL QUALIFICATION

QUANTITY SURVEYING 6 Months N.E.S.T SINDH (Karachi) COMPUTER SKILL

Auto Cad

MS Office

PROFESSIONAL EXPERIENCE:

PROJECT NO .03

Employer : Descon Engineering Limited Pakistan.

Period : December, 2010 To, August, 2021

Project : Karak Makori Oil & Gas Field Power Station, Pipe Line,

: Power Plant & GOSP Project Pakistan.

Client : Petroleum Pakistan Limited.

Position : Senior QA/QC Inspector civil

Contractor : Descon Engineering Limited Pakistan.

Consulting : Petrochemical Engineering Consultants (PEC), Assignment

A. Quality Control & Quality Assurance.

B. Quality Control & Quality Assurance.

C. Site Corresponding work through on QMIS

D. Monitoring & Inspection of site construction activities.

E. Checking & Verification of barbending scheduling.

F. Rebar,s fixing (Checking of nos, dia, space, spacer, bending, construction sequence & coating).

G. Formwork fixing (Checking of vertical and horizontal alignment, vertical plumb, concrete cover between the steel/formwork, inner side smooth face, all corner taiyet & fair,).

H. Flasework (Checking of vertical and horizontal pipes, joints, x-pipes, wood picker, through bolts).

I. Supervision of Concrete (Monitoring of weather & concrete temperature, insure the height of shoot use for concrete fall, slump, human workability, use of vabrator, 30 cm layer & 45 degree concrete draf & bleed points).

J. Inspection of daily bases casting item of concrete (Checking of burlap, curing, control the honeycombing after the stripping of formworks).

K. Daily, weekly & monthly site briefing, corresponding, progress reporting to QA/QC Manager Department.

L. Inspection of field area link road (Checking of CG, NGC, Sub base ABC, Prime coat, Asphalt Concrete Wearing Course).

M. Pipe Line (Monitoring of pipe line excavation, base compaction, RD wise depth & width, layer wise compaction around the pipe, and use the technical knowledge in water loge area).

N. Monitoring of Non-Shrinkage Grout (Use embedded plate for foundation, and for foundation anchors rods, Rock bolts).

O. Monthly Inspection and Monitoring & Evaluation of site Laboratory equipment’s, calibration, test record.

P. Monitoring of Post Tensioning System.

Q. Monitoring of drilling & blasting for pipe line.

S. Checking & verification of shop drawings.

T. Inspection of retaining walls, breast walls, cement sand motor ratio. PROJECT NO .02

Employer : Descon Engineering Limited Pakistan.

Period : March, 2005 To August 2010.

Project : Hub Power Plant & 120 V Grid Station Project Pakistan. Client : China Electricity Power Company China.

Position : QA/QC Inspector civil.

Consulting : BARQAAB Consulting Services Pvt Ltd Pakistan Contractor : Descon Engineering Limited Pakistan.

Assignment

A. Quality Control & Quality Assurance.

B. Monitoring of Drilling & Blasting.

C. Monitoring of Anchors Nails.

D. Monitoring of Ground Anchors.

E. Monitoring of Blinding Anchors.

F. Monitoring of Anchors Assembly.

G. Supervision of Anchors Stressing.

H. Inspection & Checking of Rebar’s fixing

I. Inspection & Checking of bar bending Schedule.

K. Supervision of Concreting.

L. Inspection of Form work.

M. Checking of Sharpe Drawing.

N. Daily, Weekly & Monthly Progress Report.

O. Decision of site Technical Issus.

P. Inspection of Prime Coat & Asphaltic Concrete.

Q. Preparation of Request for Inspection (RFI).

R. Monitoring of Non-Shrinkage Grout.

S. Office work.

T. Monitoring of site all construction activates. PROJECT NO .01

Employer : Tekfan Construction Company Kazakhstan. Period : February, 2000 TO, November, 2004.

Project : Eastern Prova & Kenbai Oil & Gas Field Project. Client : Oil & Gas Sector Kazakhstan.

Position : QA/QC Inspector civil.

Contractor : Tekfan Construction Company Kazakhstan. Consultant : SMEC Consulting Kazakhstan.

Assignment

A. Quality Control & Quality Assurance.

B. Preparation of Request for Inspection (RFI).

C. Site Corresponding work through on QMIS

D. Monitoring & Inspection of site construction activities.

E. Rebar,s Inspection (Nos, Space, Dia, Sequence, Cover)

F. Checking of Formwork (Vertical & Horizontal alignment, plumb, inner face finishing & bleeding points).

G. Supervision of concreting (Ensure height of fall, range of slump, weather & concrete temperature, Note the TM timing).

H. Inspection of flasework (vertical & horizontal pipe distance, x-pipes, joints, woodpeckers & supports).

I. Monitoring earth work excavation for 20 inch sewing pipe lie

(Assure the depth & width RD wise excavation trench & layer wise granular fill compaction).

J. Checking of bar binding scheduling.

K. Site briefing to consulting members.

L. Daily site progress report to QA/QC Manager.

M. Monitoring of Non-shrinkage grout all types.

O. Inspection of Pipe line approach roads.

P. Monthly Inspection and Monitoring & Evaluation of site Laboratory equipment’s, calibration, test record.



Contact this candidate