Packiaraj Pandeeswaran
Production / Project Engineer
************@*****.***
Qualification Passport No
B. Tech (Production Eng.) M6147859
Mobile No.
Years of Experience Languages known
8 English, Hindi & Tamil
Date of birth
05/07/1990
Nationality Current Residence
Indian United Arab Emirates
Professional History
Around 8 years of experience in Fabrication of Boiler Storage Tanks, Mitre Bends, Structural & Non-Structural works of Mechanical Engineering. Having 4 years of experience in GCC, I have extensive knowledge in
Production Planning & control, Estimation, Documenting QC procedures, AutoCAD, & Primavera (P6). Worked as a Project Engineer in Metro Tunnels & High raise Building Projects for Structural & Non-Structural works.
I can work methodically yet quickly, either by own or as part of a team.
Work Experience
Mar 2019 – Present
Core Metal LLC – Sharjah, UAE
Project Engineer – Structural & Non-Structural
May 2017 – Aug 2018
Vision Steel Industries Factory – Abu Dhabi, UAE
Production / Project Engineer – Structural & Non-Structural May 2016 – March 2017
Chennai poly pack Pvt ltd
Production Engineer – Foam & Packaging
Aug 2012 – Mar 2016
Southern Heavy engineering Pvt Ltd.
Production Engineer – Boilers, Pressure vessels.
Software Skills
• Auto CAD
• Primavera P6
• ASME, ISO 2015 (Basics)
• Revit (Basics)
• MS office
Project Experience
Structural and Non-Structural
Emaar Boulevard Heights (EBH)
(Dubai, UAE)
• As a Project Engineer, responsible to complete the works as planned with estimated time & budget.
• Involved in erection of shear plates, beams, columns SS & MS handrails, Bollards & ss cladding works.
• Identifying project variations, completing month schedule & invoicing.
• Reviewing the inspection & test method as per MS.
• Hold weekly coordination meetings with project team members & subcontractors, & reporting to concerned Project managers.
• Determining quality control standards, maintaining daily & monthly QC documents.
• Involved in snagging & De-snagging works for
handover.
Metro - Metallic walkway - Alstom (Expo 2020)
(Dubai)
• Involved in erection of making platforms with Beams, Channels, Angles & Chequer plates inside Metro
tunnel.
• Monitoring all QC related activities as per ITP of the project, Identifying project risks & health and safety Measures.
• Supervise all welding, coating, painting in
accordance with ASME, ISO standards.
• Reviewing the inspection and testing methods and procedures for Radiographic, Dye Penetrant,
Magnetic Particle, and Ultrasonic inspections
• Co-ordinate with other contractor Engineers to work as per site requirements.
• Making all QC final inspection documents like MIR, WIR, MAR, MS, ITR etc.,
2
D1D2 Forte towers
(Dubai)
• Involved in erection of shear plates, beams, columns SS & MS handrails, lifting beams, GRC Brackets.
• Coordinating with engineering & design team and
verifying the site activities
• Clearing inspections & monitoring without any non- conformance report.
• Witnessing of welder qualifications testing and
procedures qualification testing, conducting visual and measurement tests, rejecting and returning
unacceptable materials, compile and submit daily
reports, inspection reports, and inter office
communications.
• Coordination with the field subcontractors for all welding procedure specifications and Quality
procedures qualifications Acceptance & Arranging
Third-Party NDT Inspection.
• Review course and effects of welding defects and take remedial actions
ADNOC – Housing project Ruwais
(Abu Dhabi, UAE)
• Involved in fabrication & Erection of Handrails, Platforms inside OTS shaft with beams & gratings,
substation Grating works, Electrical rooms Landing gratings, bollards & roof cat ladder.
• Worked with Project Manager in developing Project controls, requirements & schedules, Reporting and
recording deficiencies on Site & in Office also.
• Clearing inspections on time, completing month
schedules & Invoicing and collecting payment
certificates.
• Ability to assist in project design, development and commissioning activities.
• Ability to identify and mitigate project risks through Primavera P6.
• Familiar with Primavera systems (Assigning,
Scheduling, Resources & Estimation)
Fabrication Reconciliations:
Power Plant Structures
• Involved in the Fabrication of Pressure vessels, Boilers, Storage tanks, Pipelines, Dished ends,
Flanges & Mitre bends
• Preparation of General arrangement in
Production Planning & Control by weekly &
monthly.
• Involved in process of NDT - Ultrasonic Test,
Radiography test, Hydro Test & LP Test.
• Preparation of QC & Production reports and
Documents.
• Checking Final dimensions & Assigning for final
inspection to Dispatch.
• Maintaining Stores & Procuring materials.
• Projects involved BHEL and Larsen & Toubro
Selected Accomplishment:
• Kaizen project - Implemented control points to
reduce manual errors and simplify process.
• 5S Project – Implemented in shop floor & make
workspace free for manpower.
Education:
• BACHELOR OF ENGINEERING:
PRODUCTION ENGINEER (July 2008 - May
2012)
JJ COLLEGE OF ENGINEERING &
TECHNOLOGY – TRICHY, TN, INDIA
Declaration:
I hereby declare that all the above-mentioned details are true and correct to the best of my knowledge and belief. Thanking you,
Place:
Date:
PACKIARAJ PANDEESWARAN