CV of S.Ramalingam
Mail ID : ********@*****.**.** Contact Number: 009**-**-*******
OBJECTIVE:- TO ACHIEVE EXCELLENCE IN THE FIELD OF QHSE MANAGEMENT AND TO WORK IN A CHALLENGING ENVIRONMENT
Date of birth & Age : 25 / 05 / 71 & 49 Years
Nationality : Indian
Marital Status : Married
Spoken Language Proficiency : English, Hindi & Tamil Passport Details : M 2313244 Valid till 26 / 10 / 2024 issued at Dubai, UAE. Driving License : Holding UAE Driving License valid till 29.03.2023 Educational profile
Academic Qualifications/certificates : Degree in Mechanical Engineering (B.E) from Crescent Engineering College, Tamilnadu, India (1988-1993). Technical qualification : Postgraduate Degree in Thermal Power Engineering (M.E) from Annamali University, Tamilnadu, India (1993-1995). Professional qualification/ : Certified Welding Inspector from American Welding society Certificates (AWS-CWI-Expired)
ASNT LEVEL II in
Radiography Testing
Magnetic Particle Testing
Ultrasonic Testing
Liquid Penetrant Testing
Postgraduate Diploma Personnel Management & Industrial Relations. IMS Internal auditor
Training courses : ISO 9001:2015,ISO 14001:2015 & ISO 45001:2018 Computer literacy : Conversant with Microsoft office 2000 package in particular Word and Excel. Have in use of the Internet and e-mail.
Work experience : 25 years
Present employment : December 2006 to Till date
Employer : Eversendai Corporation Berhad
P.O.Box 52756, Dubai, U.A.E.
Designation : Deputy General Manager (QHSE) and Management Representative Company profile:
Structural steel construction project management including design, fabrication, blasting and painting and fireproofing. An IMS, AISC and CE certified company. CV of S.Ramalingam
Page 2 of 11
Job Responsibilities:
Preparation of project specific quality plans / inspection & test plans, Inspection procedure and method statements.
Preparation of welding procedure specifications as per AWS D1.1,AWS D1.5,AWS D1.6 & BS EN ISO 15614-1
Witnessing of Welder/Operator Qualification tests and preparation of PQRs & WPQRs as per AWS D1.1, AWS D1.5, AWS D1.6 & ISO 9606-1
Liaise with third party inspection agencies such as MI, RMTUV, LLYODS, SGS & BV etc.
Witnessing of Chemical and mechanical testing (Tensile, Bend test and impact test and through thickness testing) of raw material samples and PQRs test coupons at testing Laboratories.
Establishment and maintenance of quality systems as per requirements of ISO 9001:2015, ISO 14001:2015 & ISO 45001:2018
Fully involved for establishment and maintenance of quality systems for ASME initial certification for
“U”,”U2”,”S”&”R” stamps.
Conduct Internal IMS audits and preparation of audit reports
Sub-contractor evaluation, monitoring and re-evaluation.
Monitor customer satisfaction.
Review of customer complaints, identify root cause and take corrective action to avoid reoccurrence.
Interpretation of Radiographs
Ensuring the Company’s Quality Management System (QMS) is implemented and maintained effectively in accordance with the agreed procedures, and the requirements of the subscribed standard.
Reporting all QMS relevant data and information to the Executive management and ensuring the implementation and review of agreed actions in order to maintain the effectiveness of the system and any need for improvement.
Planning, implementing, reporting and reviewing internal IMS audits and ensuring the implementation of agreed corrective actions.
Assisting personnel to prevent the occurrence of any non-conformities relating to the IMS.
Communicating the performance of Company’s IMS to all employees.
Ensuring the promotion of awareness of client requirements throughout the organisation.
Reviewing QMS at defined intervals sufficient to ensure the stability of the QMS and its effectiveness in satisfying the latest version of standard AISC 207 and AISC420.
Ensuring all quality related requirements has been implemented as per ITP, Project specifications and international standards.
Coordinate with client and 3rd party to complete the inspection as per agreed ITP.
Ensuring all quality control dossier has been submitted to client on time.
Communicating with external parties on matters relating to the IMS.
To ensure correct coating system has been applied as per approved painting system and Painting and fireproofing ITP.
Identify Root cause for internal and external NCRs and take corrective action to avoid reoccurrence in future.
Coordination with site QC Engineer and ensure all inspection and testing activities carried out as per erection and fireproofing ITP.
CV of S.Ramalingam
Page 3 of 11
Jan 2001 to Dec 2006
Employer : Petron Emirates Cong & Mfg Co (L.L.C),
P.O.Box 52756, Dubai, U.A.E.
Designation : Asst. Manager (QA / QC) and Management Representative Company profile:
Fabrication & construction of equipment, vessels & structural for petrochemical, refinery, food-processing & cement plants including ASME Code Stamped Vessels, Ship loaders / unloaders and heaters and stacks. Job Responsibilities:
Preparation of project specific quality plans / inspection & test plans, Inspection procedure method of statements.
Preparation of welding procedure specifications as per ASME IX, AWS D1.1 & BS 287-1
Witnessing of Welder/Operator Qualification tests and preparation of PQRs & WPQRs
Liaise with third party inspection agencies such as MI, ABS, RMTUV, VELOSI, SGS, LLOYD ‘S, VINCOTTE INTERNATIONAL & BV etc.
Witnessing of mechanical testing (Tensile, Bend test and impact test) at EIL and Lonestar technical services
Establishment and maintenance of quality systems as per requirements of ISO 9001:2000
Internal Quality audits and preparation of audit reports
Sub-contractor evaluation, monitoring and re-evaluation.
Monitor customer satisfaction.
Interpretation of Radiographs
Painting inspection
Review of PWHT Charts
Gulf Projects handled:
Major projects listed ahead were handled with responsibilities including preparation of Quality assurance Plan / Inspection & Test plans, inspection procedures, Establish and Qualification of Welding Procedures, Perform stage inspections and liaise with client or third Party inspectors. YEAR PROJECT/EQUIPMENT / ITEM/CLIENT
2001
Project : ASAB THAMAMA ZONE A / B GAS INJECTION PROJECT Equipment : Heavy wall carbon steel & incoloy piping Design code : ASME B 31.3
Client : ADCO / GALFAR Engineering & Contracting co. 2001
Project : TENGIZCHEVRIL
Equipment : Supply & Fabrication of structural steel Design code : --
Client : M /S Enersul technologies, Canada.
2001
Project : BHP-OHANET GAS DEVELOPMENT PROJECT
Equipment : Manifold skid assembly fabrication
Design code : ASME 31.3
Client : Petrofac international ltd
2002
Project : CLINKER COOLER REVAMPING PROJECT, UCC, RAH. Equipment : Fabrication of air ducts & Housings
Design code : --
Client : M/S IKN GMbh, Germany.
CV of S.Ramalingam
Page 4 of 11
YEAR PROJECT/EQUIPMENT / ITEM/CLIENT
2002
Project : TCO Down stream – TENGIZCHEVRIL UBIT 600 SULPHUR FORMING FACILITIES Equipment : CONVEYING & RAILCAR LOADING FACILITY-550 TONNE SILO Design code : --
Client : M /S Enersul limited partnership, Canada. 2002
Project : EDIBLE OIL MILL PROJECT-NATIONAL FLOUR MILL Equipment : Supply & fabrication of stainless tanks / Equipments Design code : --
Client : Alghurair Invesments
2002
Project : PROPOSED RESIGN PLANT AT JEBELALI
Equipment : Resign Blenders,Reactors & stainless steel piping Design code : --
Client : Poly chem Resign international industries 2002
Project : ABUDHABI INDUSTRIAL CITY DISTRICT COOLING SCHME Equipment : Thermal storage tank
Design code : --
Client : M/ S Drake & skull international (L.L.C) Abu Dhabi. 2002
Project : TANKS FOR NEW FACTORY IN ALQUOZ
Equipment : Supply & Fabrication of stainless steel and carbon steel tanks Design code : ASME VIII Div 1
Client : Jotun U.A.E Ltd(L.L.C)
2003
Project : ALSCHWEIHAT S1 COMBINED CYCLE POWER & DESALINATION PLANT,U.A.E. Equipment : Shop fabrication of 2 Nos Exhaust steel stacks Design code : ASME VIII Div 1
Client : G+H SCHALLSCHUTN GmbH, Germany.
2003
Project : UNITED OLEFINS COMPLEX PROJECT
Equipment : Supply of steel structures and carbon steel tanks. Design code : API 650
Client : John zink company (L.L.C)
2003
Project : ALSCHWEIHAT PROJECT
Equipment : ATMOSPHERIC TANKS(5 No U Stamped vessels) Design code : ASME VIII DIV 1
Client : M/S Nooter / Eriksen,Italy
2003
Project : DOROOD ONSHORE FACILITIES PROJECT,KHARG ISLAND, IRAN Equipment : Fabrication of platform,pipesupports,handrails & ladders Design code : --
Client : Petrofac international ltd
2003
Project : BAB FIELD PRODUCTION FACILITIES EXPANSION PROJECT Equipment : 2 Nos hot water heaters and Burner piping Design code : API 560
Client : FURNACE ENGG / JGC / ADCO
2003
Project : TANKS FOR JEBELALI POWER & DESALINATION STATION “L” PHASE-I Equipment : Design, supply, fabrication,erection, testing & painting of carbon steel tanks and stainless steel tanks
Design code : API 650
Client : M/S TOSHIBA CORPORATION(LLC)
2004
Project : RAS LAFAN ON-SHORE EXPANSION PROJECT
Equipment : Supply & Fabrication of Liquid Incinerator and burner piping Design code : --
Client : John zink /Chiyoda
2004
Project : STEAM PIPING FOR UMM AL NAR - IWPP AND JEBELALI Equipment : Pre fabrication of pipe spools including mitres & “t” joints from plates Design code : B 31.1
Client : IHI UAE Co., Ltd / TOSHIBA
2004
Project : STEAM PIPING FOR UMM AL NAR - IWPP AND JEBELALI Equipment : Pre fabrication of pipe spools including mitres & “t” joints from plates Design code : B 31.1
Client : IHI UAE Co., Ltd / TOSHIBA
2004
Project : TANKS FOR JEBEL ALI POWER AND DESALINATION STATION “L” PHASE 1 Equipment : Design,Drawing,Fabrication,Surfacetreatment and delivery of carbon steel and stainless steel tanks Design code : ASME VIII Div 1
Client : IHI UAE Co., Ltd / TOSHIBA
CV of S.Ramalingam
Page 5 of 11
YEAR PROJECT/EQUIPMENT / ITEM/CLIENT
2004
Project : AL KHALEEJ GAS PROJECT,QATAR
Equipment : Fabrication of Radiant section and coil for heater no.197-F081 for Al khaleej Gas Project, Qatar Design code : API 530
Client : Furnace Engineering INC.,Japan
2004
Project : RAS LAFFAN EXPANSION PROJECT
Equipment : Refurbishment of heater 33-E-002
Design code : API 530
Client : CMS&A
2004
Project : SOHAR REFINERY PROJECT,OMAN
Equipment : Supply, fabrication and painting of 1 no quencher unit and 1 No. Reheat mixing unit. Design code : ---
Client : Alstom Norway AS
2004
Project : RAS GAS ONSHORE EXPANSION PROJECT
Equipment : Shop Fabrication of 1 no. steel stack for train 4 NGL extraction (option-6) (item no. : 45-x001) Design code : API 560
Client : RPCO Enterprises limited, Japan.
2004
Project : POTLINE - 7 PROJECT
Equipment : Fabrication & Erection of silos for fume treatment plant Design code : ---
Client : Alstom Norway as / Dubai aluminium company (Dubal) 2004
Project : JEELALI POWER AND DESALLNATION “L”STATION PHASE 1 Equipment : 4 Nos “U” stamp air receiver tanks
Design code : ASME VIII Div 1
Client : Toshiba corporation,Japan.
2004
Project : RAS LAFFAN ONSHORE EXPANSION PROJECT
Equipment : Regenerant Heater for Train-3
Design code : API 560
Client : CMS&A.
2006
Project : SHARJAH ELECTRICITY AND WATER AUTHORITY
Equipment : Fabrication and site erection of HRSG "E,F, G&H” Design code : ASME Sec 1,ASME Sec VIII Div 1,ASME B 31.1 & ASME B 31.3 Client : NEM-MHS
2006
Project : QATAR GAS II DEVELOPMENT PROJECT
Equipment : Supply & fabrication of ducting, bypass stack & outlet stack for four HRSG installations Design code : ASME STS 1 2000
Client : Aarding Thermal Acoustics BV
2006
Project : QATAR GAS III DEVELOPMENT PROJECT
Equipment : Stacks for compressor gas turbine 52-X0621& 53-X0621 and Regenerant heaters 52-F0301& 53- F0301
Design code : --
Client : KIRCHNER ITALIA
2007
Project : DUBAI FESTIVAL CITY PROJECT
Equipment : --
Design code : BS
Client : AL FUTTAIM CARILLION
2007
Project : BURJ DUBAI PROJECT
Equipment : --
Design code : BS
Client : SAMSUNG ENGINEERING
2007
Project : DUBAI MALL PROJECT
Equipment :--
Design code : BS
Client : ALICO
2007
Project : AL MAS TOWER PROJECT
Equipment :--
Design code : BS
Client : TAISEI ACC JV
CV of S.Ramalingam
Page 6 of 11
YEAR PROJECT/EQUIPMENT / ITEM/CLIENT
2007
Project : INDEX BUILDING PROJECT
Equipment :--
Design code : BS
Client : ACC
2007
Project : NEW DOHAINTERNATIONAL AIRPORT PROJECT - QATAR Equipment : --
Design code : BS
Client : SOJV
2008
Project : QIPPCO TOWER PROJECT
Equipment :--
Design code : BS
Client : SIX CONSTRUCT
2008
Project : BURJ AL SALAM (AL RAFI CAR PARKING) PROJECT Equipment :--
Design code : BS
Client : BELHASA ENGINEERING & CONSTRUCTION COMPANY(LLC) 2008
Project : MOTOR CITY-AUTOSHOW ROOM & OFFICE TOWER PROJECT Equipment :--
Design code : BS
Client : NASAMULTIPLEX LLC
2008
Project : BURJ DUBAI - SPIRE STEEL WORKS PROJECT
Equipment :--
Design code : BS
Client : SAMSUNG ENGINEERING
2008
Project : AL SHAMMS TOWER PROJECT
Equipment :--
Design code : BS
Client : ACC
2008
Project : PRINCESS TOWER PROJECT
Equipment :--
Design code : BS
Client : ACC
2008
Project : TIARA TWIN TOWERS PROJECT
Equipment :--
Design code : BS
Client : ARABTEC CONSTRUCTION LLC
2008
Project : ANANTARA PALM JUMEIRAH&TIARA RESIDENCES PROJECT Equipment :--
Design code : BS
Client : ARABTEC CONSTRUCTION LLC
2008
Project : DUBAI TOWER PROJECT
Equipment :--
Design code : BS
Client : DTP
2008
Project : ADNEC: PHASE 3-FEATURE TOWER (CAPITAL GATE) PROJECT Equipment : --
Design code : BS
Client : ALHABTOOR ENGINEERING ENTERPRISES
2009
Project : DUBAI MALL -UPPER ROOF CINEMA
Equipment :--
Design code : BS
Client : TURNER CONSTRUCTION -INTERNATIONAL(L.L.C) 2009
Project : ETIHAD TOWERS PROJECT – TOWER 4 (CURTAIN WALL GLAZING SUPPORT) Equipment :--
Design code : BS
Client : ARABIAN CONSTRUCTION COMPANY(ACC)
2009
Project : SAADIYAT-AL-MANARA
Equipment :--
Design code : BS
Client : ALEC
CV of S.Ramalingam
Page 7 of 11
YEAR PROJECT/EQUIPMENT / ITEM/CLIENT
2009
Project : CONVENTION CENTRE
Equipment :--
Design code : BS
Client : QATAR PETROLEUM
2009
Project : THE GATE DISTRICT TOWER (SHAMS ABU DHABI) Equipment :--
Design code : BS
Client : ARABIAN CONSTRUCTION COMPANY(ACC)
2009
Project : PENTOMINUM TOWER PROJECT
Equipment :--
Design code : BS
Client : ARABIAN CONSTRUCTION COMPANY(ACC)
2009
Project : AL NASER HEADQUATERS
Equipment :--
Design code : BS
Client : AL ROSTAMANI
2010
Project : ALGERIA / OMAN FERTILIZER PROJECT
Equipment :--
Design code : BS
Client : SHAPOORJI PALLONJI MIDEAST LLC/SAIPEM
2010
Project : CLEVELAND CLINIC ABUDHABI (CCAD)
Equipment :--
Design code : BS
Client : BESIX - SAMSUNG JV
2010
Project : CMA TOWER, RIYADH, KSA
Equipment :--
Design code : BS
Client : CAPITAL MARKET AUTHORITY
2010
Project : KING ABDULLAH PETROLEUM STUDIES & RESEARCH CENTRE (KAPSARC) Equipment :--
Design code : AWS
Client : SAUDI ARAMCO
2011
Project : Al Naser HQ
Design code : AWS
Client : Al Rostamani
2011
Project : Capital Gate
Design code : BS
Client : AL HAPTOOR
2011
Project : ADNOC HQ
Design code : AWS
Client : SIXCO
2012
Project : KAIA
Design code : AWS
Client : SBG
2013
Project : Crescent City
Code : AWS
Client : AECOM
2013
Project : Al Jalila Children’s Specialty Hospital
Design code : BS
Client : AFC
2014
Project : Alin Mosque
Code : AWS
Client : ACC
CV of S.Ramalingam
Page 8 of 11
YEAR PROJECT/EQUIPMENT / ITEM/CLIENT
2014
Project : Hub Zero
Design code : AWS
Client : Besix
2016
Project : ADIA
Design code : BS
Client : TCA JV
2017
Project : AL MARYAH CENTRAL PEDESTRAIN BRIDGE
Design code : AWS
Client : Multiplex
2017
Project : ALwadha arches
Code : AWS
Client : Hyundai
2017
Project : Opera house
Code : AWS
Client : Multiplex
2017
Project : NASARENA
Code : BS
Client : ALNABODAH
2017
Project : DUBAI FRAME
Code : BS
Client : Alrostamani
2018
Project : THE ADDRESS LINK BRIDGE
Code : AWS
Client : ACC
2018
Project : The Royal Atlantis hotels and Residences Code : AWS
Client : Multiplex
2018
Project : ICD BROOKFIELD PLACE
Code : BS
Client : Multiplex
2018
Project : KL 118
Code : BS
Client : Samsung
2018
Project : MASHREQ BANK HQ
Code : AWS
Client : ACC
2018
Project : Dubai I
Code : BS
Client : Hyundai
2018
Project : Museum of the future
Design code : AISC
Client : BAM international
2018
Project : JUMEIRAH GATE
Design code : AISC
Client : Multiplex
CV of S.Ramalingam
Page 9 of 11
Previous Employments:
Oct 2000 – Jan 2001
Employer : Prasanth Projects Ltd., Mumbai.
Profession : QA/QC Engineer
Company Profile : Fabrication and erection of LPG mounted bullets, storage tanks and Pipe lines Project : 3 x 1000 MT LPG mounted bullets.
Client : Hindustan Petroleum Corporation Ltd.Loni, UP. Job responsibilities:
Preparation of QA Plan, Welding procedures & Qualification of welders
Raw material inspection
Carrying out stage inspection during fabrication (fit up to hydro test)
Co-ordination with Clients and Third party inspection agencies (BVIS).
Interpretation of Radiographic films.
Witnessing DPT, MPT & UT.
Verification of PWHT Charts.
Documentation.
Feb 2000 - Sep 2000.
Employer : Baby Industries, Trichy, India
Profession : QA/QC Engineer
YEAR PROJECT/EQUIPMENT / ITEM/CLIENT
2018
Project : One Zaabeel tower and Bridge
Design code : AISC & AWS
Client : ALEC
2019
Project : KAFD -WADI ARCH SUSPENSION BRIDGE
Design code : AISC & AWS
Client : KAFD
2019
Project : Zayed National Museum
Design code : AISC & AWS
Client : Besix
2019
Project : Mohammed VI Tower
Design code : BS
Client : Besix
2020
Project : Marsa Al Arab project
Design code : AISC & AWS
Client : Al Shafar General Contracting(ASGC)
2020
Project : Kifaf Development Project
Design code : AISC & AWS
Client : Ssangyong
2020
Project : Al wasl tower
Design code : AISC & AWS
Client : Arabtec
CV of S.Ramalingam
Page 10 of 11
Company Profile : A major contractor specialized in the field of Fabrication of Pressure Vessels & Heat exchangers
Job responsibilities :
Inspection of incoming material and brought out items
Carrying out Stage – Inspection during fabrication
Co-ordination with clients and third Party Inspection agencies.
Reporting Daily activities to the Manager
Review of quality control procedure
Conducting Welder qualification test
Preparation of WPS/PQR
Co-ordination with NDE agencies
Documentation
July 1999 - Jan 2000
Employer : M/s Control Contracting &Trading Company, Abu Dhabi, UAE. Profession : QA/QC Engineer
Company profile : A Major contractor specialized in the field of Architectural, Piping, HVAC, plumbing
& Electrical works.
Project : Zakum Gas Injection Project (Oil & Gas)
Client : ADMA-OPCO
Job Responsibilities:
Raw Material inspection
Witnessing welders test as per WPS/PQR
Carrying out all stage wise inspection. (For Buffer vessel, Expansion vessel, Chilled water piping, Process piping, Refrigerants piping (Brazing),
& instrument piping)
Witnessing NDE (MT&PT)
Interpretation of Radiographic films.
Inspection of painting, Insulation and Cladding.
Co-ordination with clients (NPCC, TPG&DNV) and NDE Agencies
Co-ordination with different Departments with in the organization for smooth Execution of jobs
Keeping all records pertaining to the Stage wise inspection(Material Identification to hydro test)
Preparing final documentation & Precommissioing punch list. June 1995 - June 1999
Employer : M/s. Veesons Energy systems (pvt) Ltd, Trichy, india Profession : QA/QC Engineer
Company profile : A major contractor specialized in the Fabrication of boilers, chimneys and boiler components
CV of S.Ramalingam
Page 11 of 11
Job Responsibilities:
Tests and establishing welding Procedure qualification records and other welding document.
Inspection of pressure parts and non pressure parts.
Preparation of quality plan and getting approval from the client.
Co-ordination with clients, Third party inspection Agencies, Testing laboratories and NDE Agencies.
Selection of welding consumables.
Verification of Time-Temperature chart of post weld heat treatment.
Co –ordination with different departments within the organization like planning, Production, design for the smooth execution of the job.
Experienced in Mechanical Testing laboratory, especially in hardness, Tensile, impact, Macro & micro examination.
Codes / standards familiar with :
1 ASME SEC VIII DIV 1 BPV Code.
2 ASME SEC IX
3 ASME SEC II Parts A, B & C,
4 ASME SEC V.
5 ASME B 31.1
6 ASME B 31.3
7 ASTM Standards
8 API 1104
9 API 650.
10 API 530
11 API 560
12 AWS D 1.1
13 AWS D 1.4
14 AWS D 1.5
15 AWS D 1.6
16 AWS D 1.8
17 AISC 207
18 AISC 303
19 AISC 341
20 AISC 360
21 AISC 420
22 RCSC
23 BS EN ISO 15614
24 EN 1090-1 & 2
25 BS EN ISO 1460
26 BS EN ISO 12944
27 ISO 3834- 1,2,3,4,5 & 6
28 BS EN 1011-1 & -2
29 ISO 9606-1
30 SSPC PA1 & PA2