Post Job Free

Resume

Sign in

L.L.C Cycle Power

Location:
Dubai, United Arab Emirates
Posted:
September 13, 2021

Contact this candidate

Resume:

CV of S.Ramalingam

Page * of **

Mail ID : adontp@r.postjobfree.com Contact Number: 009**-**-*******

: 009**-**-*******

: **** 739-***-****

OBJECTIVE:- TO ACHIEVE EXCELLENCE IN THE FIELD OF QHSE MANAGEMENT AND TO WORK IN A CHALLENGING ENVIRONMENT

Date of birth & Age : 25 / 05 / 71 & 49 Years

Nationality : Indian

Marital Status : Married

Spoken Language Proficiency : English, Hindi & Tamil Passport Details : M 2313244 Valid till 26 / 10 / 2024 issued at Dubai, UAE. Driving License : Holding UAE Driving License valid till 29.03.2023 Educational profile

Academic Qualifications/certificates : Degree in Mechanical Engineering (B.E) from Crescent Engineering College, Tamilnadu, India (1988-1993). Technical qualification : Postgraduate Degree in Thermal Power Engineering (M.E) from Annamali University, Tamilnadu, India (1993-1995). Professional qualification/ : Certified Welding Inspector from American Welding society Certificates (AWS-CWI-Expired)

ASNT LEVEL II in

Radiography Testing

Magnetic Particle Testing

Ultrasonic Testing

Liquid Penetrant Testing

Postgraduate Diploma Personnel Management & Industrial Relations. IMS Internal auditor

Training courses : ISO 9001:2015,ISO 14001:2015 & ISO 45001:2018 Computer literacy : Conversant with Microsoft office 2000 package in particular Word and Excel. Have in use of the Internet and e-mail.

Work experience : 25 years

Present employment : December 2006 to Till date

Employer : Eversendai Corporation Berhad

P.O.Box 52756, Dubai, U.A.E.

Designation : Deputy General Manager (QHSE) and Management Representative Company profile:

Structural steel construction project management including design, fabrication, blasting and painting and fireproofing. An IMS, AISC and CE certified company. CV of S.Ramalingam

Page 2 of 11

Job Responsibilities:

Preparation of project specific quality plans / inspection & test plans, Inspection procedure and method statements.

Preparation of welding procedure specifications as per AWS D1.1,AWS D1.5,AWS D1.6 & BS EN ISO 15614-1

Witnessing of Welder/Operator Qualification tests and preparation of PQRs & WPQRs as per AWS D1.1, AWS D1.5, AWS D1.6 & ISO 9606-1

Liaise with third party inspection agencies such as MI, RMTUV, LLYODS, SGS & BV etc.

Witnessing of Chemical and mechanical testing (Tensile, Bend test and impact test and through thickness testing) of raw material samples and PQRs test coupons at testing Laboratories.

Establishment and maintenance of quality systems as per requirements of ISO 9001:2015, ISO 14001:2015 & ISO 45001:2018

Fully involved for establishment and maintenance of quality systems for ASME initial certification for

“U”,”U2”,”S”&”R” stamps.

Conduct Internal IMS audits and preparation of audit reports

Sub-contractor evaluation, monitoring and re-evaluation.

Monitor customer satisfaction.

Review of customer complaints, identify root cause and take corrective action to avoid reoccurrence.

Interpretation of Radiographs

Ensuring the Company’s Quality Management System (QMS) is implemented and maintained effectively in accordance with the agreed procedures, and the requirements of the subscribed standard.

Reporting all QMS relevant data and information to the Executive management and ensuring the implementation and review of agreed actions in order to maintain the effectiveness of the system and any need for improvement.

Planning, implementing, reporting and reviewing internal IMS audits and ensuring the implementation of agreed corrective actions.

Assisting personnel to prevent the occurrence of any non-conformities relating to the IMS.

Communicating the performance of Company’s IMS to all employees.

Ensuring the promotion of awareness of client requirements throughout the organisation.

Reviewing QMS at defined intervals sufficient to ensure the stability of the QMS and its effectiveness in satisfying the latest version of standard AISC 207 and AISC420.

Ensuring all quality related requirements has been implemented as per ITP, Project specifications and international standards.

Coordinate with client and 3rd party to complete the inspection as per agreed ITP.

Ensuring all quality control dossier has been submitted to client on time.

Communicating with external parties on matters relating to the IMS.

To ensure correct coating system has been applied as per approved painting system and Painting and fireproofing ITP.

Identify Root cause for internal and external NCRs and take corrective action to avoid reoccurrence in future.

Coordination with site QC Engineer and ensure all inspection and testing activities carried out as per erection and fireproofing ITP.

CV of S.Ramalingam

Page 3 of 11

Jan 2001 to Dec 2006

Employer : Petron Emirates Cong & Mfg Co (L.L.C),

P.O.Box 52756, Dubai, U.A.E.

Designation : Asst. Manager (QA / QC) and Management Representative Company profile:

Fabrication & construction of equipment, vessels & structural for petrochemical, refinery, food-processing & cement plants including ASME Code Stamped Vessels, Ship loaders / unloaders and heaters and stacks. Job Responsibilities:

Preparation of project specific quality plans / inspection & test plans, Inspection procedure method of statements.

Preparation of welding procedure specifications as per ASME IX, AWS D1.1 & BS 287-1

Witnessing of Welder/Operator Qualification tests and preparation of PQRs & WPQRs

Liaise with third party inspection agencies such as MI, ABS, RMTUV, VELOSI, SGS, LLOYD ‘S, VINCOTTE INTERNATIONAL & BV etc.

Witnessing of mechanical testing (Tensile, Bend test and impact test) at EIL and Lonestar technical services

Establishment and maintenance of quality systems as per requirements of ISO 9001:2000

Internal Quality audits and preparation of audit reports

Sub-contractor evaluation, monitoring and re-evaluation.

Monitor customer satisfaction.

Interpretation of Radiographs

Painting inspection

Review of PWHT Charts

Gulf Projects handled:

Major projects listed ahead were handled with responsibilities including preparation of Quality assurance Plan / Inspection & Test plans, inspection procedures, Establish and Qualification of Welding Procedures, Perform stage inspections and liaise with client or third Party inspectors. YEAR PROJECT/EQUIPMENT / ITEM/CLIENT

2001

Project : ASAB THAMAMA ZONE A / B GAS INJECTION PROJECT Equipment : Heavy wall carbon steel & incoloy piping Design code : ASME B 31.3

Client : ADCO / GALFAR Engineering & Contracting co. 2001

Project : TENGIZCHEVRIL

Equipment : Supply & Fabrication of structural steel Design code : --

Client : M /S Enersul technologies, Canada.

2001

Project : BHP-OHANET GAS DEVELOPMENT PROJECT

Equipment : Manifold skid assembly fabrication

Design code : ASME 31.3

Client : Petrofac international ltd

2002

Project : CLINKER COOLER REVAMPING PROJECT, UCC, RAH. Equipment : Fabrication of air ducts & Housings

Design code : --

Client : M/S IKN GMbh, Germany.

CV of S.Ramalingam

Page 4 of 11

YEAR PROJECT/EQUIPMENT / ITEM/CLIENT

2002

Project : TCO Down stream – TENGIZCHEVRIL UBIT 600 SULPHUR FORMING FACILITIES Equipment : CONVEYING & RAILCAR LOADING FACILITY-550 TONNE SILO Design code : --

Client : M /S Enersul limited partnership, Canada. 2002

Project : EDIBLE OIL MILL PROJECT-NATIONAL FLOUR MILL Equipment : Supply & fabrication of stainless tanks / Equipments Design code : --

Client : Alghurair Invesments

2002

Project : PROPOSED RESIGN PLANT AT JEBELALI

Equipment : Resign Blenders,Reactors & stainless steel piping Design code : --

Client : Poly chem Resign international industries 2002

Project : ABUDHABI INDUSTRIAL CITY DISTRICT COOLING SCHME Equipment : Thermal storage tank

Design code : --

Client : M/ S Drake & skull international (L.L.C) Abu Dhabi. 2002

Project : TANKS FOR NEW FACTORY IN ALQUOZ

Equipment : Supply & Fabrication of stainless steel and carbon steel tanks Design code : ASME VIII Div 1

Client : Jotun U.A.E Ltd(L.L.C)

2003

Project : ALSCHWEIHAT S1 COMBINED CYCLE POWER & DESALINATION PLANT,U.A.E. Equipment : Shop fabrication of 2 Nos Exhaust steel stacks Design code : ASME VIII Div 1

Client : G+H SCHALLSCHUTN GmbH, Germany.

2003

Project : UNITED OLEFINS COMPLEX PROJECT

Equipment : Supply of steel structures and carbon steel tanks. Design code : API 650

Client : John zink company (L.L.C)

2003

Project : ALSCHWEIHAT PROJECT

Equipment : ATMOSPHERIC TANKS(5 No U Stamped vessels) Design code : ASME VIII DIV 1

Client : M/S Nooter / Eriksen,Italy

2003

Project : DOROOD ONSHORE FACILITIES PROJECT,KHARG ISLAND, IRAN Equipment : Fabrication of platform,pipesupports,handrails & ladders Design code : --

Client : Petrofac international ltd

2003

Project : BAB FIELD PRODUCTION FACILITIES EXPANSION PROJECT Equipment : 2 Nos hot water heaters and Burner piping Design code : API 560

Client : FURNACE ENGG / JGC / ADCO

2003

Project : TANKS FOR JEBELALI POWER & DESALINATION STATION “L” PHASE-I Equipment : Design, supply, fabrication,erection, testing & painting of carbon steel tanks and stainless steel tanks

Design code : API 650

Client : M/S TOSHIBA CORPORATION(LLC)

2004

Project : RAS LAFAN ON-SHORE EXPANSION PROJECT

Equipment : Supply & Fabrication of Liquid Incinerator and burner piping Design code : --

Client : John zink /Chiyoda

2004

Project : STEAM PIPING FOR UMM AL NAR - IWPP AND JEBELALI Equipment : Pre fabrication of pipe spools including mitres & “t” joints from plates Design code : B 31.1

Client : IHI UAE Co., Ltd / TOSHIBA

2004

Project : STEAM PIPING FOR UMM AL NAR - IWPP AND JEBELALI Equipment : Pre fabrication of pipe spools including mitres & “t” joints from plates Design code : B 31.1

Client : IHI UAE Co., Ltd / TOSHIBA

2004

Project : TANKS FOR JEBEL ALI POWER AND DESALINATION STATION “L” PHASE 1 Equipment : Design,Drawing,Fabrication,Surfacetreatment and delivery of carbon steel and stainless steel tanks Design code : ASME VIII Div 1

Client : IHI UAE Co., Ltd / TOSHIBA

CV of S.Ramalingam

Page 5 of 11

YEAR PROJECT/EQUIPMENT / ITEM/CLIENT

2004

Project : AL KHALEEJ GAS PROJECT,QATAR

Equipment : Fabrication of Radiant section and coil for heater no.197-F081 for Al khaleej Gas Project, Qatar Design code : API 530

Client : Furnace Engineering INC.,Japan

2004

Project : RAS LAFFAN EXPANSION PROJECT

Equipment : Refurbishment of heater 33-E-002

Design code : API 530

Client : CMS&A

2004

Project : SOHAR REFINERY PROJECT,OMAN

Equipment : Supply, fabrication and painting of 1 no quencher unit and 1 No. Reheat mixing unit. Design code : ---

Client : Alstom Norway AS

2004

Project : RAS GAS ONSHORE EXPANSION PROJECT

Equipment : Shop Fabrication of 1 no. steel stack for train 4 NGL extraction (option-6) (item no. : 45-x001) Design code : API 560

Client : RPCO Enterprises limited, Japan.

2004

Project : POTLINE - 7 PROJECT

Equipment : Fabrication & Erection of silos for fume treatment plant Design code : ---

Client : Alstom Norway as / Dubai aluminium company (Dubal) 2004

Project : JEELALI POWER AND DESALLNATION “L”STATION PHASE 1 Equipment : 4 Nos “U” stamp air receiver tanks

Design code : ASME VIII Div 1

Client : Toshiba corporation,Japan.

2004

Project : RAS LAFFAN ONSHORE EXPANSION PROJECT

Equipment : Regenerant Heater for Train-3

Design code : API 560

Client : CMS&A.

2006

Project : SHARJAH ELECTRICITY AND WATER AUTHORITY

Equipment : Fabrication and site erection of HRSG "E,F, G&H” Design code : ASME Sec 1,ASME Sec VIII Div 1,ASME B 31.1 & ASME B 31.3 Client : NEM-MHS

2006

Project : QATAR GAS II DEVELOPMENT PROJECT

Equipment : Supply & fabrication of ducting, bypass stack & outlet stack for four HRSG installations Design code : ASME STS 1 2000

Client : Aarding Thermal Acoustics BV

2006

Project : QATAR GAS III DEVELOPMENT PROJECT

Equipment : Stacks for compressor gas turbine 52-X0621& 53-X0621 and Regenerant heaters 52-F0301& 53- F0301

Design code : --

Client : KIRCHNER ITALIA

2007

Project : DUBAI FESTIVAL CITY PROJECT

Equipment : --

Design code : BS

Client : AL FUTTAIM CARILLION

2007

Project : BURJ DUBAI PROJECT

Equipment : --

Design code : BS

Client : SAMSUNG ENGINEERING

2007

Project : DUBAI MALL PROJECT

Equipment :--

Design code : BS

Client : ALICO

2007

Project : AL MAS TOWER PROJECT

Equipment :--

Design code : BS

Client : TAISEI ACC JV

CV of S.Ramalingam

Page 6 of 11

YEAR PROJECT/EQUIPMENT / ITEM/CLIENT

2007

Project : INDEX BUILDING PROJECT

Equipment :--

Design code : BS

Client : ACC

2007

Project : NEW DOHAINTERNATIONAL AIRPORT PROJECT - QATAR Equipment : --

Design code : BS

Client : SOJV

2008

Project : QIPPCO TOWER PROJECT

Equipment :--

Design code : BS

Client : SIX CONSTRUCT

2008

Project : BURJ AL SALAM (AL RAFI CAR PARKING) PROJECT Equipment :--

Design code : BS

Client : BELHASA ENGINEERING & CONSTRUCTION COMPANY(LLC) 2008

Project : MOTOR CITY-AUTOSHOW ROOM & OFFICE TOWER PROJECT Equipment :--

Design code : BS

Client : NASAMULTIPLEX LLC

2008

Project : BURJ DUBAI - SPIRE STEEL WORKS PROJECT

Equipment :--

Design code : BS

Client : SAMSUNG ENGINEERING

2008

Project : AL SHAMMS TOWER PROJECT

Equipment :--

Design code : BS

Client : ACC

2008

Project : PRINCESS TOWER PROJECT

Equipment :--

Design code : BS

Client : ACC

2008

Project : TIARA TWIN TOWERS PROJECT

Equipment :--

Design code : BS

Client : ARABTEC CONSTRUCTION LLC

2008

Project : ANANTARA PALM JUMEIRAH&TIARA RESIDENCES PROJECT Equipment :--

Design code : BS

Client : ARABTEC CONSTRUCTION LLC

2008

Project : DUBAI TOWER PROJECT

Equipment :--

Design code : BS

Client : DTP

2008

Project : ADNEC: PHASE 3-FEATURE TOWER (CAPITAL GATE) PROJECT Equipment : --

Design code : BS

Client : ALHABTOOR ENGINEERING ENTERPRISES

2009

Project : DUBAI MALL -UPPER ROOF CINEMA

Equipment :--

Design code : BS

Client : TURNER CONSTRUCTION -INTERNATIONAL(L.L.C) 2009

Project : ETIHAD TOWERS PROJECT – TOWER 4 (CURTAIN WALL GLAZING SUPPORT) Equipment :--

Design code : BS

Client : ARABIAN CONSTRUCTION COMPANY(ACC)

2009

Project : SAADIYAT-AL-MANARA

Equipment :--

Design code : BS

Client : ALEC

CV of S.Ramalingam

Page 7 of 11

YEAR PROJECT/EQUIPMENT / ITEM/CLIENT

2009

Project : CONVENTION CENTRE

Equipment :--

Design code : BS

Client : QATAR PETROLEUM

2009

Project : THE GATE DISTRICT TOWER (SHAMS ABU DHABI) Equipment :--

Design code : BS

Client : ARABIAN CONSTRUCTION COMPANY(ACC)

2009

Project : PENTOMINUM TOWER PROJECT

Equipment :--

Design code : BS

Client : ARABIAN CONSTRUCTION COMPANY(ACC)

2009

Project : AL NASER HEADQUATERS

Equipment :--

Design code : BS

Client : AL ROSTAMANI

2010

Project : ALGERIA / OMAN FERTILIZER PROJECT

Equipment :--

Design code : BS

Client : SHAPOORJI PALLONJI MIDEAST LLC/SAIPEM

2010

Project : CLEVELAND CLINIC ABUDHABI (CCAD)

Equipment :--

Design code : BS

Client : BESIX - SAMSUNG JV

2010

Project : CMA TOWER, RIYADH, KSA

Equipment :--

Design code : BS

Client : CAPITAL MARKET AUTHORITY

2010

Project : KING ABDULLAH PETROLEUM STUDIES & RESEARCH CENTRE (KAPSARC) Equipment :--

Design code : AWS

Client : SAUDI ARAMCO

2011

Project : Al Naser HQ

Design code : AWS

Client : Al Rostamani

2011

Project : Capital Gate

Design code : BS

Client : AL HAPTOOR

2011

Project : ADNOC HQ

Design code : AWS

Client : SIXCO

2012

Project : KAIA

Design code : AWS

Client : SBG

2013

Project : Crescent City

Code : AWS

Client : AECOM

2013

Project : Al Jalila Children’s Specialty Hospital

Design code : BS

Client : AFC

2014

Project : Alin Mosque

Code : AWS

Client : ACC

CV of S.Ramalingam

Page 8 of 11

YEAR PROJECT/EQUIPMENT / ITEM/CLIENT

2014

Project : Hub Zero

Design code : AWS

Client : Besix

2016

Project : ADIA

Design code : BS

Client : TCA JV

2017

Project : AL MARYAH CENTRAL PEDESTRAIN BRIDGE

Design code : AWS

Client : Multiplex

2017

Project : ALwadha arches

Code : AWS

Client : Hyundai

2017

Project : Opera house

Code : AWS

Client : Multiplex

2017

Project : NASARENA

Code : BS

Client : ALNABODAH

2017

Project : DUBAI FRAME

Code : BS

Client : Alrostamani

2018

Project : THE ADDRESS LINK BRIDGE

Code : AWS

Client : ACC

2018

Project : The Royal Atlantis hotels and Residences Code : AWS

Client : Multiplex

2018

Project : ICD BROOKFIELD PLACE

Code : BS

Client : Multiplex

2018

Project : KL 118

Code : BS

Client : Samsung

2018

Project : MASHREQ BANK HQ

Code : AWS

Client : ACC

2018

Project : Dubai I

Code : BS

Client : Hyundai

2018

Project : Museum of the future

Design code : AISC

Client : BAM international

2018

Project : JUMEIRAH GATE

Design code : AISC

Client : Multiplex

CV of S.Ramalingam

Page 9 of 11

Previous Employments:

Oct 2000 – Jan 2001

Employer : Prasanth Projects Ltd., Mumbai.

Profession : QA/QC Engineer

Company Profile : Fabrication and erection of LPG mounted bullets, storage tanks and Pipe lines Project : 3 x 1000 MT LPG mounted bullets.

Client : Hindustan Petroleum Corporation Ltd.Loni, UP. Job responsibilities:

Preparation of QA Plan, Welding procedures & Qualification of welders

Raw material inspection

Carrying out stage inspection during fabrication (fit up to hydro test)

Co-ordination with Clients and Third party inspection agencies (BVIS).

Interpretation of Radiographic films.

Witnessing DPT, MPT & UT.

Verification of PWHT Charts.

Documentation.

Feb 2000 - Sep 2000.

Employer : Baby Industries, Trichy, India

Profession : QA/QC Engineer

YEAR PROJECT/EQUIPMENT / ITEM/CLIENT

2018

Project : One Zaabeel tower and Bridge

Design code : AISC & AWS

Client : ALEC

2019

Project : KAFD -WADI ARCH SUSPENSION BRIDGE

Design code : AISC & AWS

Client : KAFD

2019

Project : Zayed National Museum

Design code : AISC & AWS

Client : Besix

2019

Project : Mohammed VI Tower

Design code : BS

Client : Besix

2020

Project : Marsa Al Arab project

Design code : AISC & AWS

Client : Al Shafar General Contracting(ASGC)

2020

Project : Kifaf Development Project

Design code : AISC & AWS

Client : Ssangyong

2020

Project : Al wasl tower

Design code : AISC & AWS

Client : Arabtec

CV of S.Ramalingam

Page 10 of 11

Company Profile : A major contractor specialized in the field of Fabrication of Pressure Vessels & Heat exchangers

Job responsibilities :

Inspection of incoming material and brought out items

Carrying out Stage – Inspection during fabrication

Co-ordination with clients and third Party Inspection agencies.

Reporting Daily activities to the Manager

Review of quality control procedure

Conducting Welder qualification test

Preparation of WPS/PQR

Co-ordination with NDE agencies

Documentation

July 1999 - Jan 2000

Employer : M/s Control Contracting &Trading Company, Abu Dhabi, UAE. Profession : QA/QC Engineer

Company profile : A Major contractor specialized in the field of Architectural, Piping, HVAC, plumbing

& Electrical works.

Project : Zakum Gas Injection Project (Oil & Gas)

Client : ADMA-OPCO

Job Responsibilities:

Raw Material inspection

Witnessing welders test as per WPS/PQR

Carrying out all stage wise inspection. (For Buffer vessel, Expansion vessel, Chilled water piping, Process piping, Refrigerants piping (Brazing),

& instrument piping)

Witnessing NDE (MT&PT)

Interpretation of Radiographic films.

Inspection of painting, Insulation and Cladding.

Co-ordination with clients (NPCC, TPG&DNV) and NDE Agencies

Co-ordination with different Departments with in the organization for smooth Execution of jobs

Keeping all records pertaining to the Stage wise inspection(Material Identification to hydro test)

Preparing final documentation & Precommissioing punch list. June 1995 - June 1999

Employer : M/s. Veesons Energy systems (pvt) Ltd, Trichy, india Profession : QA/QC Engineer

Company profile : A major contractor specialized in the Fabrication of boilers, chimneys and boiler components

CV of S.Ramalingam

Page 11 of 11

Job Responsibilities:

Tests and establishing welding Procedure qualification records and other welding document.

Inspection of pressure parts and non pressure parts.

Preparation of quality plan and getting approval from the client.

Co-ordination with clients, Third party inspection Agencies, Testing laboratories and NDE Agencies.

Selection of welding consumables.

Verification of Time-Temperature chart of post weld heat treatment.

Co –ordination with different departments within the organization like planning, Production, design for the smooth execution of the job.

Experienced in Mechanical Testing laboratory, especially in hardness, Tensile, impact, Macro & micro examination.

Codes / standards familiar with :

1 ASME SEC VIII DIV 1 BPV Code.

2 ASME SEC IX

3 ASME SEC II Parts A, B & C,

4 ASME SEC V.

5 ASME B 31.1

6 ASME B 31.3

7 ASTM Standards

8 API 1104

9 API 650.

10 API 530

11 API 560

12 AWS D 1.1

13 AWS D 1.4

14 AWS D 1.5

15 AWS D 1.6

16 AWS D 1.8

17 AISC 207

18 AISC 303

19 AISC 341

20 AISC 360

21 AISC 420

22 RCSC

23 BS EN ISO 15614

24 EN 1090-1 & 2

25 BS EN ISO 1460

26 BS EN ISO 12944

27 ISO 3834- 1,2,3,4,5 & 6

28 BS EN 1011-1 & -2

29 ISO 9606-1

30 SSPC PA1 & PA2



Contact this candidate