Post Job Free
Sign in

Power Plant Electrical

Location:
Amman, Amman Governorate, Jordan
Posted:
September 13, 2021

Contact this candidate

Resume:

MALEK AMER ABURABE'EA

Electrical Engineer power & control, 7 years' experience Mobile: +962*********

Email: *****.********@*****.***

LinkedIn: https://www.linkedin.com/in/malekaburabee/ Address: Amman, Jordan

Objective:

To obtain a position at any electrical engineering field (Power plant field, industrial electrical maintenance, automation and control systems design and maintenance) Personal information:

Date of birth: 1/10/1989

Place of birth: AL-Karak, Jordan.

Gender: male

Marital status: Married

Nationality: Jordanian

Education:

Bachelor Degree in Electrical Engineering / power & control From Jordan University of Science and Technology, Irbid, Jordan [2008-2013]

High school certificate from Latin patriarchate high school AL-Wassieh [2008] Experience & training:

Position: Electrical maintenance Engineer (Power & Automation) Duration: August 2016 Up to Date

Employer: Al Rajhi cement - Jordan (Cementra)

Supervisor Electrical Maintenance work MV/LV panels, MV /LV, VFD, Local Control panels, Motors and MCC and Switchgear Panels

Modifying and troubleshooting the Siemens PLC S7-200,300,400,1200

Supervisor the DCS System PCS 7, SCADA and Make Modification at the system a New control loops, logic modifications and graphic display

Follow Up MIS project with FLS Automation and administrate the system

Commissioning and Supervisor Electrical work of New Projects Vertical Cement Mill ( Electrical power, Automation and Instruments ) reporting to electrical Maintenance

Commissioning and Supervisor Electrical work of New projects packing cement Reporting to electrical maintenance

Position: Electrical Project Engineer

Duration: February 2015 Up to august, 2016

Employer: Electro-Mechanical & Communication Engineers (EMC) Type of Projects:

1) Jordan Switchgear and Ancillary Equipment for Amman West 400/132/33kV Client: National electric Power Company (NEPCO)

Construction works at substation (Double bus-bar OHL, Electrical bay, Transformer’s 400 MVA, 33kv SG, 33kV Capacitor Bank and Reactor, control systems, relay panels, Cable ladder,

Doing all drumming schedules. Routing, cable pulling works at the site.

All cable Termination.

Testing and commissioning for equipment’s and systems. 2) DCS and Electrification Works at APC Hot Leach

Client: The Arab Potash Co. Ltd

Proper man power allocation as per site requirement.

Design the routes, ordered the material and Installation cable ladder and cable tray, more than 20000 m are installed at Power plant, Switches rooms, Main Pipe rack and production area

Installation lighting DB’s and fixture and sockets outlets

Pulling cables 100 km included instruments cables, control cables, fiber cables, power cables LV 0.4KV 0.69KV, MV 3.3KV 11KV 33V

Termination power cables LV 0.4KV, 0.69 KV, MV 3.3KV, 11KV,33KV

Termination control cable at DCS Cabinets, J.B, P.B, MCC’s

Prepare as-built drawings with draftsman every month

Design, sketch drawing and fabricated the stands fixing for JUNCTION BOXES, LOCAL CONTROL STATION.

Manpower Planning & Deployment.

Position: Electrical & instruments Engineer

Duration: March 2014 to January 2015

Employer: MECHANICAL ENGINEERS & CONTRACTORS (MEC) Type of Projects:

1) Sulphur Recovery Unit ZARKA (SRU).

Client: JORDAN PETROLEUM REFINERY CO.LTD.

Contractor: Le Gaz Integral

Installations of HONEYWELL DCS, ESD MARSHALLING cabinets, PLC SIEMENS S7-300 cabinets VFD Allen-Bradley & SIEMENS UPS CABINETS switch between DCS/ESD

Instruments equipment’s installation include PDT, PT, ZSL, ZSH, LS, TT, LT

installation of JUNCTION BOXES(JB), LOCAL CONTROL STATION (LCS) (instrument, power)

Termination control cable at DCS Cabinets, J.B, P.B, MCC’s

lighting system & Fixtures installation

CABLE pulling Supervision & data acquisition [ 20km]

Design and sketch drawing the stands fixing for JUNCTION BOXES, LOCAL CONTROL STATION, INSTRUMENTS TRINSMITERS

Breakdown variation order & Extra works for all E/I work 2) Screening unit

Client: The Arab Potash Co. Ltd.

Instrument, relay room assembly & termination, diverter, screw conveyer, screen, sensors, slide gate.

Control panel, MCC unit modification, Testing and commissioning of MCC

Lighting system & Fixtures installation.

Daily & weekly reports & Variation Order & Extra Works Preparation, Control Panel Continuity

& Mugger testing.

• Position: production and maintenance Engineer

Duration: September /2013 to March /2014,

Employer: Kibar Industry Assan Panel

Specific Duties and Responsibilities/ Scope of Works:

Supervision and Responsible for the Production line [control process, quantity, operators, specific properties, quality control, etc.]

supervision and Responsible for the maintenance program and schedule

[ Electrical and mechanical]

Lighting system & fixtures installation.

Languages:

- Arabic [mother tongue]

- English (speaking, writing, reading) [very good] Licenses & Certifications:

Siemens Certified Training Course on PLC <S7-300 & 400>

PLC Siemens S7=1200 scada run time and motion technology servo motor Course

Substation assets testing with OMICRON Test sets: CMC356, CPC100, CP TD1, CT Analyzer

Circuit Breaker Testing with CIBANO 500

Training Of Trainers (TOT) from PIONEERS ACADEMY

Excel Advanced from PIONEERS ACADEMY

MS Project (Microsoft Project ) from PIONEERS ACADEMY Skills:

Interactive and fast enough to learn new technologies and sciences.

I have a very good background in programming, installing & trouble shooting microcontrollers and small control systems including: PIC.

I have a good background in printed circuit boards (PCB) and electronic sensors.

Good communication skills.

Able to work under pressure.

A good team player.

Self-confidence.

Excellent self-studying ability.

Have a driving license from Jordan and (third class) & own a car.

Engineering software knowledge:

- MS office

- AutoCAD

- Internet researching & Data fetching



Contact this candidate