PHONE ( * * * ) * * * * * * * E - MAIL : *****-******@*******.***
ELIAS MERHEB
EDUCATION
September 2004 – July 2009 LEBANESE UNIVERSITY HADATH, LEBANON Bachelor in Civil Engineering FACULITY OF ENGINEERING PERSONAL DATA
Languages: Fluent in Arabic, English.
Computer Skills: AutoCAD, Etabs, Safe.
2
PROFESSIONAL EXPERIENCE
July 2016 – July 2018
Municipal Engineer – Municipality Of Bsaba, Bsaba-Baabda
Duties and responsibilities :
- Thoroughly analyzing all permits introduced to the municipality before giving acceptance.
- Inspect project sites to ensure conformance to permit/design specifications and safety or sanitation standards.
- Estimate quantities and cost of materials, equipment or labor.
- Prepare or present public reports on topics such as bid proposals, environmental impact statements, or property and right-of-way descriptions.
- Plan and design transportation and hydraulic systems or structures.
- Direct engineering activities ensuring compliance with governmental regulations.
Structural design and supervision :
- “ Azouri suspended road “ Bsaba-Baabda, design of suspended new road supporting heavy loaded trucks.
- “ Bsaba roads project ” Bsaba-Baabda, design of various cantilever retaining walls supporting new internal and main roads + design of road islands and roundabouts.
- “ AL Ain project “ Bsaba-Baabda, design of columns and footings to support new slab above existing water pool + design of cyclopean retaining walls to support new road. 3
October 2015 – Present
Free Lance – Bureau Elias Merheb – Bsaba, Samir Merheb Building
Personal Projects :
* Site Management :
- “ Rehabilitation Project Of Bsaba Dispensary “, Bsaba-Baabda ; a) Supervise and manage demolition works, Block construction works, electro- mechanical works, finishing works ( mortar, painting, tiles, …..)
- “ Hakim Apartment “, Fanar ;
a) Supervise, lead and manage a group of 1 junior civil engineer, 2 foremen, 3 electrical workers and 3 sanitary workers.
b) Prepare detailed daily work schedule for each worker. c) Prepare detailed daily activity report for each worker. d) Follow up Client’s visits and requests.
e) Follow up with suppliers and BOQ.
f) Inspect all electro-mechanical works before consultant inspection visit.
* Structural execution design and study :
- “ Bsaba Escape Garden “ Bsaba-Chouf, 2 stories guest house building + suspended pool with technical room, guards and wine room .
- “ Solid household waste sorting, composting and recycling center of Bsaba Village “ .
- “ Btaaboura 346 “ 3 stories residential building + pitched top roof .
- “ Kidz club limited “ St.Lucia-Caribbean islands, 3 stories residential building + pool + guard room and cantilever retaining walls supporting external car parking.
- “ Ain Anoub 29 ” renovation of existing 2 stories stone structured building and addition of 1 new story + new external stairs and terrace.
- “ Wakim Residence “ Beit chabeb, design of 300m
2
slab supported on one column in
the middle and on new external double and triple height columns + pitched roof . 4
- “ Daroun 1263 “,
a) Analytical evaluation to check the capacity of the constructed raft foundation and basement columns to safely carry gravity and lateral loads, if extra floor is added to the original building design.
b) Design Jackets for the constructed basement columns to safely support extra loads from the additional floor.
c) Value engineering for the original structural design file ‘presented by others’ and redesign of slabs framing plans.
* Shop drawings preparation :
- “ Kidz club limited “ detailed shop drawings for footings, columns, shear walls, slabs beams and retaining walls + detailed BOQ and bar bending schedules .
* Site Supervision :
- “ Ain Anoub 29 ” supervise and inspect all structural works and concrete pouring .
* Structural tender design :
- “ Harb Building “ Bsaba-Baabda
a) Tender design drawings for 100m
2
slab serving as external car parking + 12m
2
pedestrian connection bridge between existing building and new parking. b) Detailed BOQ and pricing.
5
September 2009 – December 2020
Structural Engineer – Bureau Marwan Khalife – Sin El Fil, Michel Sfeir Building December 2019 to December 2020
Project coordinator and structural designer for “ Mejdlaya Prison Prototype “ A 50,000 m2 complex that serves as male, female and juvenile prison which includes different types of buildings such as parking, Kitchen, checkpoint, administration, control and guards building, roads, guards towers and external play grounds .
Duties and responsibilities :
- Coordinate with the head of structural design, Senior Engineer “ Mr. Khalife “
- Prepare design criteria’s and Load key plans for each block in compliance with the adopted building codes, then coordinate with the “ Control office “ for their check and approval .
- Prepare different design proposals for specific structural parts of the project then coordinate with the “Contractor Project Manager “for approval.
- Lead, manage and supervise a group of civil engineers during all stages of their work.
- Design and execute all the preliminary structural drawings needed to kick start the modeling phase, then coordinate with the “BIM team “and check their work during all stages.
- Structural design of the various buildings and facilities of the project, and preparation of detailed execution layouts and drawings.
- Provide calculation notes and reports for the main structural components.
- Present the execution file to the “Control office”, and then follow up through calls and meetings until receiving their final approval reports. 6
September 2009 to November 2019
Head of Structural design for :
- “ Kornet chahwan 3278 ”, 5 stories and 2 basements for 2 residential blocks.
- “ Dr. Farhat hospital ”, 3 stories and 4 basements building .
- “ American specialized hospital ” Zahle, 5 stories and 3 basements building.
- “ Loft 8 “ Kfardebian, 4 stories and 2 basements building serving as chalets with pool.
- “ Ouyoun 893 ”, 4 stories and 2 basements for 2 residential blocks.
- “ Baabdat 1500 ”, 4 stories and 2 basements for 4 residential blocks.
- “ Mansourieh Building ”, 6 stories and 3 basements for 3 residential blocks .
- “ Adma 236 ”, 5 stories and 2 basements for 4 residential blocks .
- “ Sama 700 ” Daychounieh, 5 stories and 2 basements for 2 residential blocks.
- “ Residential building Ouyoun ”, 3 stories and 1 basement building.
- “ Saidet Al Najat ” Zahle, 5 stories and 3 basements residential building.
- “ Chambre de Commerce, Industrie & Agriculture ” Zahle, 4 stories building.
- “ Beit Meri 6006 ”, 4 stories and 2 basements residential building . 7
Lead the Structural design works and the civil engineers team, under the supervision of the head of structural design, Senior Engineer “ Mr. Khalife “ for :
- “ Baabdat Villas ”, rehabilitation and retrofitting of 3 under design villas, suffering from lack of the needed steel in the constructed slabs and drop beams in addition to lack in the area of the constructed shear walls needed to resist lateral forces .
- “ Pullman Hotel Ghana ”, 2 basement + 12 stories tower serving as hotel.
- “ Indevco “ Halat
a) Unipack factory-new steel structure roof ( A=4560 m 2
) to carry photovoltaic
panels.
b) Unipack 2 factory–reinforcement of existing steel structure to perform safely and correctly against high wind speeds, while supporting the additional loads of photovoltaic panels.
- “ Al zahraa hospital ” Jnah, 3 blocks with 3 basements serving as car parking operating rooms, amphitheater including a separate helipad tower diameter 25m, cantilever 9.25 m, 30 m above ground floor, supported on 27m deep foundation piles.
- Existing hospital building was suffering from differential settlement and 17cm tilting the building was reinforced to stop and reverse the overturning of the structure.
- “ Al Karama school ” Chouaifet, 5 stories + 3 basements building, that includes a sportive hall with clear spans of 19.4 m.
- “ Saint Francis wellness hospital ” Nigeria, 10 stories building supported on deep foundation piles.
- “ Villa Broumana “, renovation of existing stone structured 2 stories villa and addition of one slab + attic.
- “ McDonald’s “ Nabatieh,Zghatra,Baabda,Jounieh, 2 stories building serving as restaurant.
- “ Byblos town hall “, 3 blocks with clear spans of 17 m.
- “ Ashrafieh 315 ”, 17 stories and 5 basements residential tower.
- “ Acsess-Business Center ” Sin El Fil, 13 stories and 4 basements offices building.
- “ Chammas hotel ” Sin El Fil, 15 stories and 5 basements building.
- “ Rehabilitation of council of the south building “ Jnah, jacketing of existing columns and reinforcement of cracked and deflected slabs.
8
- “ Tebnine educational complex “,compound includes high school, preschool technical school and theater .
- “ DH CITY CENTER ” Abidjan,8 stories and 2 basements residential and office building.
- “ Baabda governmental hospital “, rehabilitation of existing building and addition of new 3 stories block.
- “ Bab Ali Project ” Najaf Iraq, conceptual design of different types of residential buildings, including luxury apartments, hotels, offices, mall ( 40,000 s.q.m ),and hyper market.
- “ Kfour prison complex ” Nabatiyeh, 35,000 m
2
serving as prison in addition to
different types of buildings such as parking, Kitchen, checkpoint, administration control and guards building, roads, guards towers and external play grounds .
- “ Urban residences ” Ashrafieh, 15 stories and 3 basements building.
- “ 20 /30 towers ” Ashrafieh, 6 basements + 33 floors block A (138m heigh above G.F relying on foundation piles net of 120cm and 33m deep) + 23 floors block B (88m heigh above G.F ) .
- “ Al tal school “ Tripoli ‘’ 18,000 m
2
‘’.
- “ Al Manara City ” Maysan Iraq, 212,000 m
2
to include 600 residential unit, schools
municipality, medical center, police station, mosque and mall.
- “ Yazbek project ” Jdeideh, 11 stories and 2 basements residential building.
- “ Maritime sciences & technology institute ” Batroun, 23,000 m2 marine school consisting of different blocks serving as class rooms, including administration building workshop building and dormitory.
- “ Mina building ”, rehabilitation of 4 stories building and addition of 1 slab.
- “ Bizri project ” Chayh, 10 stories and 1 basement residential building.
- “ Akkawi project ” Ain Saade, 6 stories and 2 basements residential building.
- “ Hitachi center 2 ” Sin El Fil, 13 stories and 3 basements building .
- “ Total fuel stations “ Hazmieh,Jamhour, structural design for all station’s facilities .
- “ Total fuel station “ Bechara Al Koury,Dekweneh, rehabilitation and retrofitting of existing steel canopies .
- “ Shababik Sweets “ Saudi Arabia, addition of steel structure mezzanine between ground and first floor and construction of external steel frame for elevator and steel pergola .
9
Owner representative and project coordinator for :
- “ Ascendant Business Center ” Sin El Fil, 12 stories and 3 basements offices building.
- Duties and responsibilities :
- Site supervision as owner representative and coordinator between the contractor and the consultant to ensure conformance of all Architectural, Mechanical, Electrical and Structural works to the design drawings and specifications.
- Inspect all structural works before consultant inspection visit.
Site Supervision for :
- “ Baabdat Villas ”.
- “ Ashrafieh 315 ”.
- “ Al Karama school ” .
- “ Al zahraa hospital ”.
- “ Villa Broumana “.
- “ Ouyoun 893 ”.
- “ Baabdat 1500 ”.
- “ Kornet el hamra “ project, 4 stories and 1 basement residential building.
- “ Baabda governmental hospital “.
- “ Sama 700 “.
- “ Acsess-Business Center “.
- “ Yazbek project “.
- “ 20 /30 towers “.
- “ Urban residences ”.
- “ Mazraa project “, 16 stories and 3 basements residential building.
- “ Hitachi center 2 ”.
10
- Duties and responsibilities :
- Inspect earth works and excavation, foundation piles and sheet piles works, and all structural works (foundations, columns, walls, slabs, beams, etc ...).
- Inspect rehabilitation and retrofitting works (column jacketing, reinforcement of cracked and deflected slabs and beams, etc …).
- Inspect steel welding, epoxy and groove works.
- Supervise on site and lab tests (pile test, slump test, compressive strength test, tensile strength test, epoxy strength test, etc …).
- Monitor concrete pouring and vibration.
February 2009 – March 2009
Junior Civil Engineer – Scale Consultant & Engineering – Antelias, Rim bldg.
Residential buildings design.
July 2008 – September 2008
Site Engineer – Chibani Group – Jdeideh, Milan Plaza Bldg. Villa Nemer – Kfaremmay, Alley
Supervision and coordination between all Architectural, Mechanical, Electrical Structural plans and works.