ad Bin Khalifa Steet
Fabrication Factory WLL
BS EN 1SO 9608-1: 2017
WPS-MMAW-PC PF.01
Rev. 0
W-27375
‘TITU BISSAS UTTAM
Hamad Bin Khalid Steel
Fabrication Factory
Bin Khalid Steal
[__DeTatcs oF auatiric;
Welder iD No.
Butt wold. PA(Fiat), PC (Horizontal), Zz
Butt wold’ ¢ (vertical up eas and D2
PA(Fia),PB, PO (Horzonta)PD PB, PC and PD r
‘illet Wok "
lot Wold! 5 PE(Overhiead)
(The qualifications of a welder for a process shail be confirmed every 6 months:
'o compliance with Clause 9 of BS EN 180 9608-1:2017 by the person respons
welding activites or examinerfexamining body )
Date of Test
ososzo1 Hw.27s7s MMA
Position
marae 5 jorizontal 1
at
PF(Verical up) be
erwin PARED PE, PC OREO r
Met Weld: 5. PE(Overhead
(The quaifications of a welder for a process shall be confirm
to-compllance with Clause 9 of BS ENISO 213 by
[nee eee a Steel Fabrication Factory
SEED! DETAILS OF QUALIFICATION RANGE
Date of Test [Operator 1D No. [Machine [Materiat
W-27375 ELTOP Stud:$235J2+C450
TITU BISWAS:
pecification=S365JR agers
Position (WPS.No:
HBKSF-STUD-WPS-001
Rev.0
03.10.2019
IDOWN HAND (PA)