Post Job Free
Sign in

Power Co Plant

Location:
Ahmedabad, Gujarat, India
Posted:
September 06, 2021

Contact this candidate

Resume:

Curriculum Vitae

Objective:

To obtain a challenging position in the area of applications where i can put my skills to the best use as well as which provides me with an opportunity to assimilate more knowledge.

Personal Profile:

Name : PATEL ASHVIN VISHNUBHAI

Date Of birth : 16th Oct’1978

Gender : male

Marital Status : married

Permanent Address : plot no 114 .Vastudham socie

Survey no 90.

Adipur .Kutchh 370205

Contact no. : (M) 942**-***** /846*******

Languages Known : English, Gujarati and Hindi

Email : ****************@**********.***

: **************@*****.***

Educational Qualifications

TECHNICAL:

: First Class Boiler Competency in the year of 2005.

: Second class Boiler Competence in the year of 2002.

Academc-

: Secondary School Certi.Exam in the of March’ 1995.

Skill &Achivement: - : Leading controlling of various department function effective to archive organization objectives goals

Replaced preventive maint. Program in to predictive mint. Program for all Rotating equipment.

Supporting the team members.

Planning and supporting of Boiler annual shut-down & IBR inspection.

Present Employee : M/S RENUKA SUGARS LTD, GANDHIDHAM, KUTCH

Total Experience:- 16 YEARS

Duration : Since December 2010 to till date.

Job Profile : 45 MW Captive Power Plant field & DCS Operation.

02 70 TPH Thermax) Ltd. (AFBC).

86 kg /cm2 working pressure.

520 C steam temperature.

30 mw extraction cum condensing turbine.-(S.N.M MAKE JAPAN)

15 mw back pressure turbine. (S.N.M MAKE JAPAN)

DCS = YOKOGAWA CENTUM VP.

Project Exposure : Duration the project stage of plant I was involved with activity of Fabrication, Erection and Commissioning.

Organization : M/S ELECTROTHERM (INDIA) LTD, SAMAKHIALI, KUTCH Duration : Since January 2010 to 15 December 2010..

Job Profile : 30 MW Captive Power Plant field & DCS Operation.

30 MW (CPP)

02 65 TPH Cetthar Vessels (P) Ltd. (AFBC).

01 28.5 TPH Cethar Vessels (p) Ltd.(WHRB-1).

01 37.5 TPH Cethar Vessels (p) Ltd.(WHRB-2).

65 kg /cm2 working pressure.

490 C steam temperature.

30 mw HTC turbine-Generator.

Organization : M/S VARRASANA ISPAT LTD, Gandhidham, KUTCH.

Duration : since January 2009 to dec. 2009.

Job Profile : 36 MW Power Plant field &DCS Operation.

36 MW CAPTIVE POWER PLANT

02 80 TPHCethar Vessels (P) Ltd.

86 kg /cm2 working pressure

520 C steam temperature

36 mw (S.N.M JAPAN)turbine With (ACC).

• H.P & L.P Feed Water Heater.

• Power Plant operate on D.C.S. ( Siemens).

Project Exposure : Duration the project stage of plant I was involved with activity of Fabrication, Erection and Commissioning

. .Organization : M/s. JINDAL SAW LIMITED.Samaghogha – Mundra, Kutch.

Duration : From : Oct.2006 to Jan . 2009

Job Profile : Turbo Blower Dept as Boiler operation DCS in ( B.F. Dept) ( Op. &Maint).

• 2 16 TPH, 420 C, 40 kg /cm, B.F Gas & LDO fired (Make: Thermal System)

2.2 MW – China make steam CandensingTurbine(Xian shaangu power co, Ltd,

• 02 Nos. – Turbo Driven Centrifugal Blower ( Xian shaangu power co, Ltd, . • K.S.B. make feed pumps

• A.B.B.-D.C.S. Operation system.

• Condition monitoring.

Organization : M/s AQUAGEL CHEMICALS (P) LTD.Gandhi ham –kutch.

Duration : From: May-2006 to Oct.2006.

JOB PROFILE : I worked in Aquagel Chem. Ltd. As a First Class Boiler Attendant in Boiler House Dept

1 14 tph – f.b.c. Boiler (Make : Cethar vessels Ltd – Tamilnadu)

3 6 TPH – Oil fired smoke tubes Boilers (Make: IBL Ltd).

2 TPH 2– Oil fired smoke tubes Boilers (Make: Thermax)

20 Lac .K.Cal /Hr .-Thermopac Automatic Boiler.

Organization :M/S ARVIND MILLS LTD. Nr. KhatrajChokdi, A’Bad.

Duration : Sept.2005 to May2006.

Job Profile : First Class Boiler Operator

6 TPH Oilfired smoke tubes Boilers (Make: Thermax)

6 TPH Coal fired smoke tubes Boilers (Make: IBL Ltd).

Organization : M/S. NIRMA LTD.Mandali – Mehsana. Gujarat.

Duration : .From: July 1998 to 2005.

Job Profile : Second class Boiler Operator

2 18 TPH Cobimax Boiler (Make)

6 TPH I.A.E.C. Boiler.

2 2 TPH Thermax Water tube boiler.

2 3.5 TPH Thermax Water tube boiler.

22 TPH WHRB Singal pass A.V.U.Boiler.

Thanking you. Yours truly,