RESUME
MD SADIQUE RAHMAN
Email:*****************@*****.***
Contact No: +91-787*******
MECHANICAL ENGINEERING Graduate with 9.4 years rich experience of site execution. OBJECTIVE
Seeking Position in an organization that offers challenging, professional growth and sample opportunities to learn enrich my competencies in the field of project Management, Focusing on Planning Scheduling and Monitoring of the piping system in oil l& gas sector, Refineries, Petrochemical
& Construction field. And MEP field also.
SKILL SUMMARY
• Excellent ability to lead a team of foreman, charge hand and skilled/unskilled workers..
• Good inter-personal and public relation skill.
• Efficiently working on shutdown &Non Shutdown Activities.
• Acquaintance with MS-Offices, Auto Cad, Internet, &other computer based Activities. EDUCATIONAL QUALIFICATION:
PROFESSIONAL : B-TECH (MECHANICAL) -2011: Pursued from RITS, HYDERABAD TECHANICAL : Certified Course of NDT LEVEL-II (RT, UT, MT, DPT, WELD VISUAL)
: Certified Course of QA/QC For ATI,(HYDERABAD)
FAMILIARITY WITH INTERNATIONAL CODES& STANDARDS.
• Knowledge of ASME section I, section VIII, Div-1 and Div-2, section ll, Part A, Part B, Part C, section IX and section V.
• Knowledge of ASME B31.1, ASME B31.3, ASME 16.5, ASME 16.20. PROFESSIONAL WORK EXPERIENCESS
A) ARSH INFRASTRUCTURE PIPING ENGINEER ( SEP 2020 TO TILL DATE) PROJECT : LAYING OF CARBON STEEL PIPE LINE PROJECTS FOR FIVE SEGMENT CLIENT : M/s INDRA PRASTHA GAS LIMITED
CONSULTANT: M/s VCS QUALITY SERVICES PVT LTD.
B) COMPANY: HEAVY ENGINEERING INDUSTRIES & SHIPBULIDING CO. (HEISCO),KUWAIT
,MECHANICAL SITE ENGINEER AND PTW COORDINATOR, ( FEB 2019 TO SEP 2019) CONTRACTOR: TECNICAS RUNIDAS (TR)
PMC : KUWAIT NATIONAL PETROLIUM COMPANY (KNPC)
PROJECT : GASS TRAIN 5(GT-5)
JOB RESPONSIBILITY
• Fabrication and erection of pipe.
• Performing Hydro testing & Pneumatic Testing for process and utility piping.
• Clearing the punch list items, constructions activities and site modifications advices from client
& quality control department as well.
• Worked with Pre-commissioning activities.
• Prepare weekly reports of the total spool erection, isometric weight installed, welded dia inches of supports and joints and the remaining work front with the materials available.
• Co-ordinate with the sub contractors to achieve the targets and schedule set by the planning.
• Site supervision during installation for all pipe work as per the consultant approves drawing.
• Supervision the production and fallow specific quality control discipline.
• Prepare the QC report.
• Conducts follow up the initial inspection.
C) KENTZ Engineering and Constructor DOHA, QATER, MECHANICAL SUPERVISOR) (July 2015 to July2018)
JOB RESPONSIBILITY
• Supervision the production and fallow specific quality control discipline.
• Maintain daily logs and supplement inspection records with photograph.
• . Hands on experience to water based sprinkler Fire fighting system, hydrant based Fire fighting systems, Fixed extinguishing system, Pre-Action System, Foam Suppression system, FM200 system.
• Installation for LPG GAS piping with support.
• startup of stainless steel pipes for steam line to hot water S/R, steam clarifiers system,Buffer vessel, HEAT exchanger, clean steam system for hospital operation rooms serving to AHU Include all type of valves strainers & fittings.
• Closed cell elastomeric insulation & cladding for domestic cold water, hot water, chilled, steam, CI pipes and rainwater piping system .
• Installation inspection for equipment piping for compressor, Boiler, Heater. PROJECT HANDLED
1) project- SMRC PROJECT
SUB CONTRACTOR - QATER KENTZ
2) PROJECT - QATER RAIL
SUB CONTRACTOR - QATER KENTZ
SHOT DOWN EXPERIENCE IN OIL AND GASS
COMPANY - AARVIENCON ENGINEERING PVT LTD.
PROJECT - HINDUSTAN PETROLEM CO.LTD CHEMBUR (MUMBAI) POSITION - INSPECTION ENGINEER
DURATION - FEB 2015 TO APRIL 2015
C) OFFSHORE INFRASTRUCTOR LTD –GUGRAT,INDIA QA/QC ENGINEER (MAY 2011 TO JAN2015 )
JOB PROFILE
• Complete execution, testing, and commissioning of all installation pipe.
• Erection and installation of CS, SS, LTCS and ALLOY PIPE.
• Material take off from approve engineering drawing.
• AS-Built correction on the shop drawing.
• Supervising installation and commissioning of equipment and follow by trial run.
• Approve material to be used in accordance with contract drawing and specifications.
• Responsible for all testing and inspections.
PROJECT HANDLED
Petro Chemical plant dahej Gujarat (OPEL)
Site Inspection and responsibility
• Inspect and monitor Welding, fabrication and NDT for piping and pipelining.
• Preparing and Updating Daily NDT and Repair Status.
• Witnessing Hydro testing.
Personal Profile
Father Name - Late Md. Saifur Rahman
Date of Birth - 14 Jan 1988
Material Status - Married
Language Known - English, Hindi, Urdu
Passport No - K3118041
Date of expiry -05.03.2022
DATE MOHAMMAD SADIQUE RAHMAN