Post Job Free

Resume

Sign in

Sec School Site Engineer

Location:
New Delhi, Delhi, India
Salary:
35000 minimum
Posted:
September 03, 2021

Contact this candidate

Resume:

NAME

PRAVESH PAL

DATE OF BIRTH

** **** ****

FATHER’S NAME

SH. JAGDISH

COUNTRY OF CITIZENSHIP

INDIAN

TOTAL EXPERIENCE

* *****

CURRENT CTC

* **** + ACCOMMODATIONS

ADDRESS

H.NO-1485, NANGLA ENCLAVE PART 2, N.I.T FARIDABAD, HARYANA

MOBILE

782-***-****(P), 881-***-****

EDUCATION

S.NO

QUALIFICATION

SCHOOL/COLLEGE

BOARD/UNIVERSITY

MARKS %

1

10TH (2011)

AGGARWAL MODERN SR. SEC SCHOOL, FARIDABAD, HR

H.B.S.E BHIWANI, HARYANA

82%

2

12TH (2013)

AGGARWAL MODERN SR. SEC SCHOOL, FARIDABAD, HR

H.B.S.E BHIWANI, HARYANA

82%

3

DIPLOMA IN CIVIL ENGINEERING

(2013 TO 2015)

B.K.N GOVT. POLYTECHNIC, NARNAUL, M/GARH, HR

H.S.B.T.E PANCHKULA, HARYANA

75%

4

B-TECH IN CIVIL ENGINEERING

(2016 TO 2019)

D.I.T.M.R COLLEGE IN FIROZPUR KALAN, FARIDABAD, HR

M.D UNIVERSITY

ROHTAK, HARYANA

65%

COMPUTER SKILLS

S.NO

COURSE

VERSION

WORKING EXPERIENCE

1

AUTO CAD

2016,2019

NO

2

M.S EXCEL

2016

YES

3

M.S WORD

2016

YES

4

SKETCH UP 2021 FOR 3D MEDELING AND RENDERING

2021

NO

3

3DS MAX FOR 3D MEDELING AND RENDERING

2022

NO

4

STAAD PRO V8I FOR STRUCTURE ANALYSIS AND DESIGN

2020

NO

EMPLOYMENT RECORD RELEVANT TO THE ASSIGNMENT

PEROID

EMPLOYING ORGANIZATION AND TITLE /POSITION.

LOCATION

SUMMARY OF ACTIVITIES PERFORMED RELEVANT TO THE ASSIGNMENT

FROM JULY 6TH 2015 TO DECEMBER 2015

TECSIDEL INDIA PVT LTD

COMPANY ROLE : HARDWARE AND SOFTWARE INSTALLATION OF TAG LANE

POSITION : SITE ENGINEER

REPORTING TO : MR. VISHNU SHARMA –PM)

BADARPUR –FARIDABAD TOLL PLAZA

HODEL TOLL PLAZA, PALWAL, HARYANA

NAME OF ASSIGNMENT

HARDWARE INSTALLATION IN TAG LANE OF TOLL PLAZA

CLIENT – BFTL TOLL FARIDABAD

TYPES OF ACTIVITIES PERFORMED:

1.HARDWARE INSTALLATION

2.REPORTING OF WORK TO PM

3.REPORTING OF DAILY WORK

TO CLIENT

4.PREPARING OF COMPARATIVE

STATEMENT

5.CO-ORDINATION WITH CLIENT RELATED TO DRAWING AND SPECIFICATION

PEROID

EMPLOYING ORGANIZATION AND TITLE /POSITION.

LOCATION

SUMMARY OF ACTIVITIES PERFORMED RELEVANT TO THE ASSIGNMENT

FROM APRIL 2TH 2016 TO MAY 2017

RAS DEVOLEPMENT PVT. LTD

POSITION : SITE ENGINEER

REPORTING TO : MR. RIZWAN –PM)

PALM SOCIETY AT SEC 75, GREATER FARIDABAD, HARYANA

1.MAKING DAILY PROGRESS REPORT

2.REPORTING OF WORK TO PM

3.HANDLING AND MANAGING OF SKILLED AND UNSKILLED LABOURS

4.PLAN LAYOUT OF WATER TANK, MUMTY AND LIFT ROOM ON TOP TERRACE

5.BAR BENDING SCHEDULE ACCORDING TO DRAWING

6.QUALITY CHECKING OF CASTING AND ALL FINISHING WORK LIKE PLASTER, FLOOR &WALL TILE

7.MAKING BAR CHART OF WEEKLY AND MONTHLY PERFORMANCE

8.MEASUREMENT OF ALL EXECUTION WORK AT SITE

9.SHARE DAILY PROGRESS REPORT OF EVENING TO HEAD OFFICE BY MAIL

10.CHECKING AND VERIFY ALL CONTRACTOR RUNNING BIL

PEROID

EMPLOYING ORGANIZATION AND TITLE /POSITION.

LOCATION

SUMMARY OF ACTIVITIES PERFORMED RELEVANT TO THE ASSIGNMENT

FROM JULY 2017 TO OCTOBER 2019

FUTURE BUILD WELL PVT. LTD

POSITION : SITE ENGINEER

REPORTING TO : MR. RAKESH SHARMA –MD)

WORK : INDUSTRIAL CONSTRUCTION

CLIENT : HPM CHEMICAL AND FERTILIZER PVT LTD, KHUSKERA, ALWAR, RAJASTAN

DEATIL WORK-(HPM PVT LTD)

1)CONSTRUCTION OF MANUFACTURE PLANT

2). ISOLATED & COMBINED FOOTING

3). PEDESTAL AND TIE BEAM

4). FIXING BASE PLATE FOR FIXING BUILT UP SECTION OF COUMN GIRDER WITH ANCHORING BOLTS

DETAIL WORK – ( GUGUGRAM )

1). EXACAVATION AND P.C.C (100MM) FOR UNDER GROUD WATER TANK ACC TO DWG

2). LAYOUT AND PROVIDING STEEL FOR RAFT FOOTING WITH WALL (150MM)

3). CASTING OF WALL AND SLAB AFTER PROPER INSPECTION OF SHUTTERING

4) FIXING WALL AND FLOOR TILE AFTER PROPER WATERPROOFING

1.MAKING DAILY PROGRESS REPORT

2.REPORTING OF WORK TO SENOIR

3.HANDLING AND MANAGING OF SKILLED AND UNSKILLED LABOURS

4.PLAN LAYOUT OF FOOTING FOUNDATION AND COLUMN.

5.BAR BENDING SCHEDULE ACCORDING TO DRAWING.

6.QUALITY CHECKING OF CASTING AND ALL FINISHING WORK LIKE PLASTER, FLOOR &WALL TILE.

7.MAKING BAR CHART OF WEEKLY AND MONTHLY PERFORMANCE.

8.MEASUREMENT OF ALL EXECUTION WORK AT SITE.

9.TRIMIX FLOORING IN GODOWN.

10.CO-ORDINATION WITH CLIENT RELATED TO DRAWING & WORK SPECIFICATION.

11.ESTIMATE ALL MATERIAL LIKE STEEL, SAND, AGGREGATE, BRICK AND ALL NECESSARY FOR PURCHASING TO CLIENT

12.CONSTRUCT OF UNDER GROUND WATER TANK FOR FIRE SAFTEY IN KHEDKIDAULA GURUGRAM, HR

PEROID

EMPLOYING ORGANIZATION AND TITLE /POSITION.

LOCATION

SUMMARY OF ACTIVITIES PERFORMED RELEVANT TO THE ASSIGNMENT

FROM NOVEMBER 2019 TO SEPTEMBER 2020

NEW AGE ACOUSTICS PVT. LTD

POSITION : SITE ENGINEER

REPORTING TO : MR. C.V PATHAK – GM)

1).CLIENT : SHRI RAM INTERNATIONAL SCHOOL, DLF PHASE 4, GURUGRAM, HR

WORK : INTERIOR AND ACOUSTICS WORK IN SCHOOL AUDITORIUM

2).CLIENT : B.L INFRA PVT LTD, IIT INDORE, VILLAGE SIMROL, INDORE, M.P

WORK : INTERIOR AND ACOUSTICS WORK IN 20 CLASS ROOM IN IIT INDORE

DETAIL WORK-( IIT INDORE )

1). FIXING VERTICALLY G.I FRAME ON WALL 600MM C/C FOR SOUND SLATED AND FABRIC

2). FIXING 12 & 18 MM PLYWOOD 150MM WIDTH FOR FIXING SLATED WOODEN

3).INSERTING GLASS WOOL 50MM UNDER SOUND SLATED FOR ABSORB SOUND

4). FIXING FABRIC HALF UPPER PART OF WALL ( 1200 MM) AND 18 MM SOUND SLATED LOWER HALF PART (1600 MM)

1.MAKING DAILY PROGRESS REPORT

2.REPORTING OF WORK TO SENOIR

3.ARRANGE ALL MATERIAL FOR SITE EXECUTION

4.CO-ORDINATION WITH CLIENT RELATED TO DRAWING AND WORK SPECIFICATION

5.DAILY MEASUREMENT OF ALL EXECUTION OF WORK

6.MAKING RUNNING ACCOUNT BILL AND SUMMIT TO CLIENT

7.CO-ORDINATION WITH PETTY CONTRACTORS FOR COMPLETION OF WORK UNDER TIME

8.MINIMIZE THE WASTAGE OF MATERIAL

9.CALCULATE AND ESTIMATE OF ALL MATERIAL ACCORDING TO SITE CONSUMPTION FOR PURCHASING BEFORE STOPPING THE WORK

10.CHECKING AND VERIFY THE MEASUREMENT WORK AND BILL WITH CLIENT

PEROID

EMPLOYING ORGANIZATION AND TITLE /POSITION.

LOCATION

SUMMARY OF ACTIVITIES PERFORMED RELEVANT TO THE ASSIGNMENT

FROM OCTOBER 2020 TO CURRENT

S.N ENVIRO TECH PVT LTD

POSITION : SITE & BILLING ENGINEER

REPORTING TO : MRS. POOJA TOMAR – GM)

1).CLIENT : N.B.C.C

WORK - GIRL HOSTEL RENNOVATION WORK IN C.R.S GOVT. UNIVERSITY,DISTT JIND, HARYANA

DETAIL WORK – 1).DISMANTING AND FIXING OF ALL FLOOR AND WALL TILE IN ALL WASHROOM AND SAME AS PLUMBING FITTING

2). FIXING OF NEW WALL TILE IN ALL CORRIDOR IN G.H

3). DISMANTLING AND PATCHING PLASTER IN ALL ROOM (117) DUE TO DAMPNESS

4). SCRUBING IN LOOSE PAINT AND NEW COAT OF PUTTY,PRIMER AND OBD IN INTERNAL AND EXTERNAL IN G.H

5). WATERPROOFING IN ALL WASHROOM AND TERRACE FLOOR

6). APPLY ENAMEL PAINT IN ALL DOOR & WINDOW IN G.H

7). DISMATLING AND PATCH PLASTER WITH CONCRETING BEAM IN OUTER BOUNDARY WALL OF UNIVERSIY (3KM) IN BOTH SIDE WITH FINISHING PAINT

1.MAKING DAILY PROGRESS REPORT

2.REPORTING OF WORK TO GENERAL MANAGER

3.ARRANGE ALL MATERIAL FOR SITE EXECUTION

4.CO-ORDINATION WITH CLIENT RELATED TO DRAWING AND WORK SPECIFICATION

5.DAILY MEASUREMENT OF ALL EXECUTION OF WORK

6.MAKING RUNNING ACCOUNT BILL AND SUMMIT TO CLIENT

7.CO-ORDINATION WITH PETTY CONTRACTORS FOR COMPLETION OF WORK UNDER TIME

8.MINIMIZE THE WASTAGE OF MATERIAL

9.CALCULATE AND ESTIMATE OF ALL MATERIAL ACCORDING TO SITE CONSUMPTION FOR PURCHASING

10.WITH CLIENT

LANGUAGE SKILL

HINDI AND ENGLISH

E-MAIL: adoivy@r.postjobfree.com

CONTACT-782-***-**** (P) & 881-***-****

CERTIFICATION

I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualification and my experience and I am available to undertake the assignment in case of an award I understand that my misstatement or misrepresentation described herein may lead to my disqualification or dismissal by the client

PARVESH PAL



Contact this candidate