Cyril Maghames
Nationality: Lebanese
Marital Status: Married
Address:Jbeil,Lebanon
Email: **************@*******.***
Mobile: +961********
CAPABILITIES
Graduated with a 3.27 GPA
Multilingual
Deal with people from multicultural backgrounds
Ability to solve design and site problems
IEC and NFPA standards
Computer literate
Planning
Electrical Design
FIDIC-MDB Harmonized
Subcontracts
Claims
Variation Orders
Estimation (MEP) (Lebanon, Qatar & Africa)
Estimation (Interior Works) (Lebanon)
Procurement (MEP) (Lebanon, Qatar & Africa)
Procurement (Interior Works) (Lebanon)
Market Prices (check the copper and steel prices daily)
Cost Control
Monthly Coordination meetings with Project managers & CEO
Monthly report to CEO showing (Estimated Cost/Actual Cost)/Creating Solutions for cost problems
Business Presentation about the company to clients
Sales Deals
Finding New Tenders that fit the company’s target
Connection with International Suppliers
Dealing with Freight Forwarders
Calculation of Customs & Clearance
Negotiation
Shop Drawings
BMS & Control
EIB & KNX
Team Management (Electrical & Mechanical)
Value Engineering
Mechanical Engineering
Interior Design
Architecture
Civil Engineering
Dealing with Clients
Meetings & Negotiation
Coordination with other trades
Respecting Safety Procedures
Strong work ethics
Ability to work under pressure
EDUCATIONAL BACKGROUND
2011-2012 EduDMG Sodeco, Lebanon
OEA certificate in Electrical System Design
OEA certificate in BMS design, - EduDMG
2003-2008 Notre Dame University (NDU) Zouk Mosbeh, Lebanon
BE (with distinction - 3.27 GPA), Electrical Engineering, July 2008
PAST WORK EXPERIENCE:
2020-Current CARITAS LIBAN
Technical Consultant
●Technical Assessment of works needed for apartments in Beirut Explosion Area
●Social Assessment of beneficiary
●Technical Assessment of works needed for commercial shops
●Technical analysis of financial budget needed for commercial shops
●Coordination between Technical and Social teams at Caritas
●Coordination with contractors concerning work in progress and prices
●Checking and approval of quotations prepared by contractors
●Handing over all works based on the required specs
●Weekly meeting with head of departments
●Daily report on all activities done including photos and requirements
●Organizing Food donation days including choosing people, locations, and fastening the whole process in order to deliver around 1000 boxes/day
2018-2019 Pride Invests SAL
Electrical Projects Manager
●Electrical Design for 3 projects based on the required specs
●Shop drawings and asbuilt drawings
●Electrical estimation
●Electrical procurement from local and foreign suppliers
●Coordination with Freight Forwarders
●Contracts & Coordination with subcontractors
●Cost Control for the execution based on the estimation
●Coordination with the accounting manager concerning all payments needed
●Supervision on execution based on shop drawings and time planning
●Leading a team of a site engineer, a foreman and 20 labors
●Coordination with Mechanical and All related trades for execution
●Weekly meetings with project managers and Architects concerning work progress
●Monthly meeting with the owner
Pride Of Jamhour, Pride Of Yarze, Pride of Louwayze (3 million Dollars Electrical)
●Pride Of Jamhour(10000 m2) consists of 80 apartments in addition to 7 basements, swimming pool and basketball & Tennis courts. Pride Of Yarze consists of 6 Townhouses (800m2 each) that are embedded in 2 Mansions: “Mansion Redwood” & “Mansion Magnolia” in addition to parking area, Gym & Swimming pools. Pride Of Louwayze(24000 m2) consists of 286 apartments in addition to 18 basements, swimming pools and basketball & Tennis courts.
2014-2018 BAT SARL/GET
MEP Estimation & Procurement Manager
●Electrical Estimation based on project specs & based on client budget
●Mechanical Estimation based on project specs & based on client budget
●Interior Estimation for shops and villas.
●Interior Execution of New BAT office in Jal Al Dib
●Calculation of Overhead
●Leave a margin in pricing for Euro, Copper price & Steel price
●Caculation of Customs & Clearance in foreign countries based on the HS code of each item
●Dealing with suppliers
●Dealing with freight forwarders
●Coordination between management and Project Engineers
●Coordination between accounting & Project Engineers & Suppliers
●Coordination with store keeper manager
●Cost Control for each project
●Variation Orders
●Coordination & meetings with clients
●Working on bidding documents
●Creating a procurement software that links all project engineers to the latest supplier’s prices
●Value Engineering
●Monthly Cost Reports
●Technical Meetings with suppliers & consultants
●Linking between Accounting & Procurement monthly
●Getting quotations & procurement of goods from International Suppliers (Turkey,UK,India,…)
●Negotiating with clients & suppliers
●Negotiating Subcontracts (Material Supply Schedule, payment terms,…)
2013-2014 BAT SARL/GET
Electrical Project Engineer
●Installation of power, lighting systems
●Installation of LC systems such as music, WIFI, telephone and data,
SMATV, CCTV, and Fire alarm system in addition to BMS
●Installation and Shop Drawings of distribution boards
●Installation and Shop Drawings of control panel boards
●Shop Drawings and Asbuilt Drawings
●Pricing Several Projects (Estimation, Request for Quotations, Dealing with Suppliers...)
●Coordination with suppliers
●Attending Engineering meetings
●Coordination of work with other trades
●Preparing Emails and Letters
●Value Engineering
RadioTV & Polyclinic (Jounieh, Lebanon) (7 million dollars MEP):
●The project contained 2 buildings: Radio & TV building & a polyclinic building. There was a common basement which included the parking area and technical rooms (18000 m2). The radio and TV building included 4 flours where the GF (1400m2) area served the radio studios and offices for the employees in addition to a cafeteria. The other 3 floors included the TV studios, offices and meeting rooms. The polyclinic building included 4 flours: First flour for the doctors clinics, second floor for laboratories and surgery rooms and the other 2 flours were divided as 12 rooms in each floor for patients.
2012-2013 MCC SAL
Project Electrical Engineer
●Installation of power, lighting systems
●Installation of LC systems such as music, WIFI, telephone and data,
SMATV, CCTV, and Fire alarm system
●BMS Shop Drawings and coordination with other trades
●Installation and Shop Drawings of distribution boards
●Installation and Shop Drawings of control panel boards
●Installation of Chiller and AHU's BMS system including sensors, actuators and BMS panel assembling.
●Installation of Home automation system
●Earthing & Lightning Installation
●Attending Engineering meetings
●Coordination of work with other trades
●Preparing Emails and Letters
●Value Engineering
●Procurement
●Coordination with suppliers
●Pricing Several Projects (Estimation, Request for Quotations, and Dealing with Suppliers...)
Pangea Hotel (Jieh-Lebanon) (2 million dollars MEP):
●The Hotel contains 4 floors, spa and entertainment area. There were 3 floors containing 21 rooms in each floor. The GF area included 2 restaurants in addition to 2 kitchens. The spa area included 4 saunas and 2 Jacuzzis in addition to multiple massage rooms. Finally, the entertainment area included 2 multipurpose rooms, a squash area, toilets and showers.
Beirut City Center (1 million dollars MEP):
●The project consists of MEP works inside 10 tenants including H&M.
2010-2012 Potel SARL
Site Electrical Engineer
●Installation of power, lighting systems, and rolling shutters
●Installation of LC systems such as music, WIFI, telephone and data,
SMATV, CCTV, and Fire alarm system
Installation of the queuing management system
●Installation of distribution boards
●Earthing & Lightning Installation
●Installation of BMS and control panel boards
●Cable pulling (power and data cables) based on riser diagrams and shop drawings
●Coordination of work with other trades
●Making shop drawings and as built drawings for power, lighting and data systems
●Working on “APAVE” recommendations concerning lifts (shafts & machinery rooms)
●Paper works submittals such as daily reports, document submittals, request for information, field inspection request…
●Working on Variation Orders
The DANA Building (Ain El Mraisse-Lebanon) (10 million dollars MEP):
●The project contained 5 basements, 9 floors and a Roof. The basements (2200 m2) each contained parkings area and technical rooms. The GF was a reception area in addition to 2 main lobbies and a security room. Then, there was 6 typical floors including 2 apartments (800 m2 each). The 7th,8th and 9th floors were divided into 1 apartment(1600m2). The roof area is divided into a technical part and a relaxation part (Pergola & Bar + sitting room + swimming pool).
2009-2010 NN Contracting
Site Electrical Engineer
●Installation of power, lighting systems, and rolling shutters
●Installation of LC systems such as music, WIFI, telephone and data,
SMATV, CCTV, and Fire alarm system
Installation of the queuing management system
●Installation of distribution boards
●Earthing & Lightning Installation
●Installation of BMS and control panel boards
●Cable pulling (power and data cables) based on riser diagrams and shop drawings
●Coordination of work with other trades
●Making shop drawings and as built drawings for power, lighting and data systems
●Paper works submittals such as daily reports, document submittals, request for information, field inspection request…
Bank Audi (Mar Elias-Lebanon) (150000 dollars MEP):
●The Bank contained 2 floors: The ground floor included the counters area, back offices and office of the Director. The second floor included the other offices, the Safe, technical rooms, kitchens and showers.
Summer 2007 CCC
Trainee Electrical Engineer
The DUBAI MALL
●The The Dubai Mall is a shopping mall in Dubai. It is the world's largest shopping mall based on total area and fourth largest by gross leasable area.[1] Located in Dubai, (U.A.E), it is part of the 20-billion-dollar Downtown complex, and includes 1,200 shops project contained 5 basements, 9 floors and a Roof. The basements (2200 m2) each contained parkings area and technical rooms. The GF was a reception area in addition to 2 main lobbies and a security room. Then, there was 6 typical floors including 2 apartments (800 m2 each). The 7th, 8th and 9th floors were divided into 1 apartment (1600m2). The roof area is divided into a technical part and a relaxation part (Pergola & Bar + sitting room + swimming pool).
*** FURTHER REFERENCES CAN BE PROVIDED UPON REQUEST
ADDITIONAL INFORMATION
●Graduated with a 3.27 GPA & 7 times on the Dean’s List
●Fluent in English, French and Arabic, and conversational in Portuguese
●Computer Skills include Microsoft Office Products: Word, Excel and Power point. C++, Matlab, AutoCad and Revit Architecture, Ecodial and Dialux
●Date of Birth: October 9,1985