Wissam Keyrouz
Civil Engineer
Languages
Arabic
English
Address Najwa El Massira Street, Zouk
Mikael, Kesserwan, Lebanon
Phone +961********
linkedin.com/in/wissam-keyrouz-53b3b780
French
ArcGIS
AutoCAD
E-mail adofky@r.postjobfree.com
Date of birth 1989-05-28
2013
Notre Dame University Louaize, Lebanon
Bachelor degree in Civil and Environmental Engineering Autodesk ROBOT
Structuralanalysis
Primavera
WaterCAD
Basketball, Swimming
Art painting, Music
EXPERIENCE
2015-07 -
present
Project Engineer
Bureau Technique Pour le Développement (BTD)
• Quality Control Manager at Bqosta Village for the construction of “Elevated Water Tank” in coordination with CSP organization
• Monitoring of the UNICEF project in Tyre district “Water Supply System” (Constructing two regional reservoirs 2500 m3 each, with distribution networks and lift lines).
• Involved in designing sewage lines in East Zahle, which benefits more than 25 villages
• Implemented and supervised the design (structure, rehabilitation, drainage, shaft and tunnels), reports and cost estimation for 8+ catchment springs funded by UNICEF
• Led the proposal design of El Marj Wastewater Treatment Plant project benefiting 12 villages with new sewage lines, implemented by Council for Development and Reconstruction (CDR)
• Manage contractors and sub-contractors, supervise workers during implementation of infrastructural water and sanitation works: processing wells, construction of reservoirs, valve chambers, pump stations and water networks in collaboration with Ministry of Energy and Water
• Monitoring and managing CISP’s project in Zgharta district “Extension of Water Supply System in El Fouar”
(Constructing a water tower, pumping station and a lift line).
• Taking responsible measures in all the civil works for “Kfarhilda Waste Water Treatment Plant” to ensure that all engineering deliverables are met. (Huge retaining walls and concrete cyclopean construction).
• Manage and improve the quality process system on construction sites and do the comparison table
• Led the structural design of pumping stations, wells, valve chambers, water towers and reservoirs using structural robot software and the manual calculation for 8 projects in North Lebanon and Baalbeck.
• Prepared, the Bill of Quantities (BoQs) and assist in the pricing of tender and enquires and valuations.
• Managed the construction of 22 km of water networks in Miniyeh-Dinniyeh area
• Supervised the Koura Lateral Sewer Project in Koura area in collaboration with CDR
• Managed as built drawings for Gheb el Talab Projects with the MoEW for more than 85 villages in North Lebanon and Zahle
• Designed 3 projects with UNICEF: processing wells, construction of reservoirs, valve chambers… Interests
Skills
Education
2014-02 -
2015-05
Site Engineer
Gebco Steel Industry Company
A) (Ashrafieh 2030 project), execution of all the steel structure for back elevation facade at block A (34 F) & block B (21 F):
• Installed the HEA & IPE steel beams and columns with competence by using pro-laser, and surveyed equipment needed to install photo-voltaic shells and zinc systems on these structures.
• Implemented inside rail hand stairs and fire escape stairs consisting of fifty-five floors.
• Inspected on: welding (using liquid penetration test), levels (using surveying equipment), measures (using tape and laser), and force capacity for threaded bolts (using torque meter machine test).
• Took measurements, and producing shop drawings for stairs, louvers, shafts, openings, doors, ladders, gratings and landscape covers then follow up in fabrication field.
• Managed the final phase aesthetically, by covering the deficiencies and committing in paint thickness and specifications, using the Elco-meter.
B) Expertise in structural engineering as designing structures for mezzanines, roofs, platforms and steel stairs using hand calculations and Auto CAD.
2012-09 -
2014-01
Site engineer
INJAZ HOLDING Company
The project was located at Diar El-Mir Dbayeh, and was in progress by its final phase.
• Involved in document control: (Specifications. Submittals, reports, requests, variation orders, schedule and shop drawings)
• The constant monitoring of the project work and also ongoing cost control of: (Civil, Mechanical and electrical installations)
• Waterproofing test inspection (filling the area needed by water and leave it for a week to see the capacity penetrated).
• Supervised on civil works such as form-works, steel fixing, concrete casting, curing, compression test, plastering, tiling, cladding, false ceilings, painting and floor coating.
• Handled daily reports, purchase orders, measurements and level tests according to survey instruments and the as built drawings
2012-07 -
2012-07
Trainee in structural design
ERGA group Naccache
• Compared between the as built drawings and the design to arrange the variations.
• Checked the capacity of steel bars for core walls to see if can expand the slab by using PCA and ROBOT software - project (Achrafieh 4748).
• Computed and designed the capacity of steel bars for specific slabs using RCD software considered for projects (Villa Sultan & Hilton Hotel- Doha)
2/2
2011-07 -
2012-04
Trainee site engineer
INJAZ HOLDING Company
The project was located at Diar El-Mir Dbayeh, and was in progress by its first phase.
• Surveyed and elevate the axial points for structure foundations.
• Set out the volume of the concrete required to be cast.
• Managed the daily reports and purchase orders on daily bases for (steel bars, casting, tools and etc.)