MICHAEL L. CARREON
San Lorenzo Street Tigbi, Tiwi, Albay
Mobile No.: +63-915-***-****/+639*********
E-Mail Address: adoeq4@r.postjobfree.com
CAREER OBJECTIVE
To dedicate my skills and experience in a progressive work organization that will contribute to my growth and harness my potential to the fullest.
QUALIFICATION
ROPE ACCESS LEVEL III
PCN LEVEL II- DYE PENETRANT TESTING
PCN LEVEL II - MAGNETIC PARTICLE TESTING
PCN LEVEL II - ULTRASONIC TESTING 3.1, 3.2, 3.8, 3.9
ASNT LEVEL II -RADIOGRAPHIC TESTING
ASNT LEVEL II- MAGNETIC PARTICLE TESTING
ASNT LEVEL II- DYE PENETRANT TESTING
ASNT LEVEL II- ULTRASONIC TESTING
EDUCATION, TRAINING & SKILL
BS MECHANICAL ENGINEERING (Under Graduate)
AUTOMOTIVE MECHANIC - TESDA Certified as Third Class Mechanic
VALID DRIVER’S LICENSE (License No. E04-00-054450 Restriction 123)
BASIC OFFSHORE SAFETY INDUCTION & EMERGENCY TRAINING (BOSIET)
IN HOUSE TRAINING IN NON-DESTRUCTIVE TESTING IN RADIOGRAPHY, ULTRASONIC,
MAGNETIC AND DYE PENETRANT TESTING, EDDY CURRENT TESTING AND EXAMINATION IN ACCORDANCE WITH ASNT-TC-1A (LEVEL II)
TRAINING IN THE SAFE USAGE OF INDUSTRIAL ISOTOPES, SAFETY AWARENESS, AND EFFECTS TO HUMANS AND PREVENTIVE AND CORRECTIVE MEASURES IN CASE OF EMERGENCY.
OFFSHORE SURVIVAL TRAINING
H2S AND BA DONNING
BASIC FIRST AID
BASIC FIREFIGHTING
WORK EXPERIENCE
NOV 2021 – PRESENT SGS LUANDA ANGOLA - offshore April 2021 – July 2021
POSITION: NDT/ROPE ACCESS LEVEL 3 SUPERVISOR
PROJECT ASSIGNMENTS
Rope Access Supervisor for multiple sites within TLP-A, FPSO-A & FPSO-B, TLP-B covering all aspects of day to day running for all Rope Access tasks as requested by our multiple client base Offshore. Conducted different NDE methods using Rope Access technique such as UT, MPI, DPI, and Crane Inspection, Base line inspection such as corrosion/erosion of pipeline and prepared reports on all joints tested and raise Anomaly reports if findings are below the minimum allowable thickness.
NOV 2017 – PRESENT PREVENT AND PROTECT (PRETECT)
POSITION: NDT/ROPE ACCESS LEVEL 3 SUPERVISOR
PROJECT ASSIGNMENTS
NORTH OIL COMPANY (NOC), QATAR (Offshore) November 2017 – Present
Rope Access Supervisor for multiple sites within Qatar covering all aspects of day to day running for all Rope Access tasks as requested by our multiple client base. Initiated, demonstrated & started RA Digital Radiography (First in Qatar) now being utilized throughout all Pretect company sites in Qatar both Onshore & Offshore.
Conducted different NDE methods using Rope Access technique such as CVE/CVI, UT, MPI, DPI, DIGI RAD and Crane Inspection, Base line inspection such as corrosion/erosion of pipeline and prepared reports on all joints tested and raise Anomaly reports if findings are below the minimum allowable thickness.
AUG 2008 – OCT 2017 OCEANEERING OIS W.L.L. DUBAI, UAE
POSITION : ROPE ACCESS MULTI-DISCIPLINE NDT TECHNICIAN
ROPE ACCESS Level III Supervisor March 2017
PROJECT ASSIGNMENTS
BRITISH PETROLUEM BAKU, AZERBAIJAN (Onshore / Offshore) July 2009 – October 2017
Conducted different NDE methods such as CVE/CVI, UT, MPI, DPI, ECI and Crane Inspection with Rope Access Base line inspection such as corrosion/erosion of pipeline and prepared reports on all joints tested and raise Anomaly reports if findings are below the minimum allowable thickness.
CENTRAL AZERI PLATFORM PDQ/CWP BAKU (Offshore) March 2017 – October 2018
Assigned as Rope Access L3 Supervisor, to performed Rope Access NDT inspection on all pipe works as per Work Pack scheduled by Oceaneering.
NEW SHA DENIZ 2 PLATFORM BAKU AZERBAIJAN (Onshore) June 2016 – February 2017
Assigned as NDT Supervisor on ATA Yard and Multi discipline Technician UT, MPI, DPI, ECI and Rope Access Inspection as per Work Pack schedule by OCEANEERING
EAST AZERI PLATFORM BAKU AZERBAIJAN (Offshore) May 2016 – June 2016
Assigned as Team Leader Multi discipline Technician UT, MPI, DPI, ECI and Rope Access Inspection as per Work Pack schedule by OCEANEERING
EAST AZERI PLATFORM BAKU AZERBAIJAN (Offshore) March 2016 – April 2016
Assigned as Team Leader Multi discipline Technician UT, MPI, DPI, ECI and Rope Access Inspection as per Work Pack schedule by OCEANEERING
WEST CHIRAG PLATFORM BAKU AZERBAIJAN (Offshore) January 2016- February 2016
Assigned as Rope Access NDT Technician as ADHOC. Conduct ECI, UT, MT, DPI Inspection on various pipe works in West Chirag Platform as per Work Pack Schedule by OCEANEERING
EAST AZERI PLATFORM BAKU AZERBAIJAN (Offshore) October 2015 – November 2015
Assigned as Team Leader Multi discipline Technician UT, MPI, DPI, ECI and Rope Access Inspection as per Work Pack schedule by OCEANEERING
CHIRAG1 PLATFORM BAKU AZERBAIJAN (Offshore) August 2015- September 2015
Assigned as Rope Access NDT Technician as ADHOC. Conduct VI, ECI Inspection on North and South Crane of Chirag1 Platform as per Work Pack Schedule by OCEANEERING
EAST AZERI PLATFORM BAKU AZERBAIJAN (Offshore) June 2015 – July 2015
Assigned as Team Leader Multi discipline Technician UT, MPI, DPI, ECI and Rope Access Inspection as per Work Pack schedule by OCEANEERING
SANGACHAL TERMINAL BAKU AZERBAIJAN (Onshore) February 2015 – April 2015
Assigned as Team Leader Multi discipline Technician UT, MPI, DPI, ECI and Rope Access Inspection as per Work Pack schedule by OCEANEERING
EAST AZERI PLATFORM BAKU AZERBAIJAN (Offshore) July 2012 – January 2014
Assigned as Team Leader Multi discipline Technician UT, MPI, DPI and Rope Access Inspection as per Work Pack schedule by OCEANEERING
CENTRAL AZERI PLATFORM PDQ/CWP BAKU (Offshore) February 2012 – June 2012
Assigned as Team Leader Multi discipline Technician UT, MPI, DPI, ECI and Rope Access Inspection as per Work Pack schedule by OCEANEERING
WEST AZERI PLATFORM BAKU AZERBAIJAN (Offshore) February 2011 – January 2012
Assigned as Team Leader Multi discipline Technician UT, MPI, DP and Rope Access Inspection as per Work Pack schedule by OCEANEERING
EAST AZERI PLATFORM BAKU AZERBAIJAN (Offshore) September 2009 – January 2011
Assigned as Team Leader Multi discipline Technician UT, MPI, DPI and Rope Access Inspection as per Work Pack schedule by OCEANEERING
TOTAL ABK ABU-DHABI (Offshore) Jul 2009 – Aug 2009
Assigned as Multi discipline Technician UT, MPI, DPI, RT on various sizes of pipes for Shutdown Program
MAERKS OIL QATAR (Offshore) Mar 2009 – Jul 2009
Assigned as NDT Technician and conducted UT, RT, DPI, MPI, on various sizes of pipes. FSO KNOCK NEVIS OIL TANKER Perform Ultrasonic flaw detection on various structural assemblies.
NPCC QATAR GAS II QATAR (Offshore) Oct 2008 – Mar 2009
Assigned as Radiographer/Scanner Technician for Pipeline Project performing velocity checks on wall thickness and diameter. Covering aspects of weld production with natural defects, system scanning and analysis, macro and sizing of selected defects onboard NPCC pipe lay barge DLB 750.
NPCC QATAR GAS II QATAR (Offshore) Oct 2008 – Mar 2009
Assigned as Radiographer/Scanner technician at NPCC – Qatar Gas II Project 38” & 34” diameter pipeline project onboard pipe lay barge DLB 1000.
NPCC QATAR GAS II QATAR (Offshore)
Assigned as Radiographer/Scanner Technician for Pipeline Project performing velocity checks on wall thickness and diameter. Covering aspects of weld production with natural defects, system scanning and analysis, macro and sizing of selected defects onboard NPCC pipe lay barge PLB 648.
NPCC QATAR GAS II – DEV. PROJECT (Offshore) Sep 2008
Assigned as Radiographer onboard PLB 648 for NPCC Project Qatar Gas II Development – Hook up Phase
DEC 2006 – JUL 2008 FUGRO – SUHAIMI LTD. (K.S.A.) DAMMAM, KINGDOM SAUDI ARABIA
POSITION: MULTI-DISCIPLINE NDT TECHNICIAN
PROJECT ASSIGNMENTS
HADEED STEEL PLANT JUBAIL KSA (Onshore)
Assigned as NDT Technician and conducted UT, RT on various sizes of pipes for Hadeed Expansion Project at the Steel Plant in Jubail Kingdom of Saudi Arabia. Perform Ultrasonic flaw detection on various structural assemblies and Roller Shafting.
PETROKEMYA AL SAFANIYA KSA (Onshore)
Assigned as Multi discipline Technician. Conducted RT, MPI, DPT on various sizes of pipes, socket welds for Olefins III Expansion project subcontracted by PetroKemya Al Safaniya Kingdom of Saudi Arabia.
IBN ZAHR KSA (Onshore)
Assigned as Multi discipline Technician. UT, MPI, DPT, RT on various sizes of pipes for Shutdown Program at Ibn Zahr KSA.
KINGABDULAZIZ INTERNATIONAL AIRPORT DESALINATION PLANT YANBU KSA (Onshore)
Conducted Radiographic Testing, Magnetic Particle, DPT on various sizes of pipes attached on the boiler for Rehabilitation and expansion Project at the King Abdul Aziz International Airport Desalination Plant Yanbu, KSA.
NITCC/FAHSS/TUV JUBAIL KSA (Onshore)
UT, RT, MPI, DPT on various pipe spools for shutdown project including tie-in welds for NITCC/FAHSS/TUV Jubail KSA. Implemented an acceptable level of technique in actual code and standard. Interpreted and evaluated test results as per applicable code and standard. Prepared and submitted final report as per client procedure and specification. Coordinated with QA/QC personnel in conducting the required testing of all welded joints.
ATCC / USTAY JUBAIL KSA (Onshore)
RT, UT, MPI and DPT on various sizes of pipes for their petrochemical expansion projects located in Jubail.
MEPCO DAMMAM KSA (Onshore)
X-ray machine was used to test various types of pipes in this project as requested by the client.
MMG DAMMAM KSA (Onshore)
Welding procedure and welder’s qualification testing.
QUORRAYAH POWER PLANT (Onshore)
UT, RT, MPI, DPT on various sizes of pipes for repairs of boiler tubing’s, down comers, heat exchangers, during their Shutdown Project in Quorrayah Power Plant.
KAMCO JUBAIL KSA (Onshore)
RT, MPI, DPT done on petrochemical refinery piping.
SAUDI BIN LADDIN GROUP JUBAIL KSA (Onshore)
Performed MPI, DPT during re-qualification on pressure vessels and storage tanks.
NOV 2001 – NOV 2006 WELDERS TESTING LABORATORIES INC. MAKATI CITY PHILIPPINES
POSITION: MULTI-DISCIPLINE NDT TECHNICIAN, LEVEL II
PROJECT ASSIGNMENTS
CHEVRON PHILIPPINES TIWI, ALBAY PHILIPPINES (FORMERLY UNOCAL PHILIPPINES INC)
Conducted different NDE methods such as RT, MPI, and PT on their Rehabilitated steam pipelines, newly installed piping, vessels, heat exchangers and structural supports and Base line inspection on all well-site piping, wellhead casing and cross-country steam pipeline. Also perform Radiographic Test Verification on suspected eroded line as per Client requirements. Prepares reports on all joints tested and raise Anomaly reports if findings are below the minimum allowable thickness. Dark room processing and preliminary film interpretation conducted prior to client’s final acceptance.
CALIFORNIA ENERGY LUZON LEYTE PHILIPPINES
Conducted Radiographic Testing on Rotor Blade for Verification Shot
SEMIRARA MINING CORPORATION ANTIQUE PHILIPPINES
Conducted Radiographic Testing and Magnetic Particle inspection on their new pipeline (1”Ø up to 12” Ø) and structural supports, and prepares all the necessary documentation.
METAPHIL/PETRON BATAAN REFINERY LIMAY BATAAN PHILIPPINES
Conducted Radiographic Testing and Magnetic Particle inspection on the new oil refinery piping (1” Ø up to 12” Ø) and structural supports, and prepares all the necessary documentation.
MIESCOR – UNOCAL PHILIPPINES INCORPORATED TIWI, ALBAY PHILIPPINES
Perform Non-Destructive Testing (RT, MT, PT) on welds in miscellaneous piping including stainless steel and components, tubes, tank plates and fitting for workmanship and for corrosion monitoring to determine the remaining thickness of classified piping. Prepares final report on all welds tested.
PETRON LUBE CENTER NAGA CITY PHILIPPINES 2000 – 2001
Assigned as Auto Mechanic and Sales Representative.
PERSONAL
Date of Birth : 08 SEPTEMBER 1979
Civil Status : MARRIED
Nationality : FILIPINO
Religion : ROMAN CATHOLIC
Height : 5’4”
Weight : 87 kgs.
REFERENCES:
Teodoro Villarin – adoeq4@r.postjobfree.com
Christopher Fulton – adoeq4@r.postjobfree.com
Cecil Bardouille - adoeq4@r.postjobfree.com
Alisdair Still - adoeq4@r.postjobfree.com