SRINIVAS THUNGANI

Email: adod9p@r.postjobfree.com / adod9p@r.postjobfree.com / adod9p@r.postjobfree.com

Contact: +971-**-*******

- . -. -. - . - . - . -. -. -. -. -. - . - . - . - . - . - . - . - . - . - . - . - . - . - . - . - . - . - . - . - . - . - . - . - . - .

Career Objective:

To obtain a challenging position in the field of Management and Engineering, that enables me to learn, improve & upgrade my skills, keeping in focus the company’s objectives & also my career advancement.

Technical Skills:

Software Packages: Carrier HAP (Heat load), Plan Swift, AutoCAD, Microstation-V8, MS-Office, PDS (Plant Design System), Knowledge in Primavera (Project Planner)

Pursuing: PMP from PMI

Academic Qualification:

Degree in Mechanical Engineers from RVDU

Diploma in Mechanical Engineering from SBTET, Hyderabad, India with First Division in 1998

Intermediate (10+2) in (Maths, Physics & Chemistry) from Board of Intermediate Education, Hyderabad, India with First Division in 1995

SSC (10th) From Board of SSC, Hyderabad, India with First Division in 1993

Experience: around 21+ years of Experience in Oil & Gas, Building Services

Professional Competencies:

Project Management:

Having Good experience with MEP and EPC projects like Oil & Gas, Residential, Commercial and Industrial Plants / Infrastructure.

Familiar with Oil & Gas HSE policy/procedures (Offshore & onshore).

Verify / scrutiny the tender documents & rise the queries if any discrepancy.

Prepare Pre-Qualification documents and Presentation to client.

Prepare preliminary conceptional drawing (FEED).

Prepare Executional philosophy for Refurbishment and Maintenance projects.

Client, Site Co-ordination for Technical Clarifications & approvals.

Aware and Analyze the current market trends, identify competitors and discuss with management team.

Prepare method statement, project schedule, Manpower histogram.

Attend the client clarification and negotiations meetings for Techno-Commercial.

Prepare the lessons learned register for all kind of aspects for future.

Project Integration services between Civil, Mechanical, Electrical and F&G.

Estimation:

Prepare CAPEX and OPEX projects Budget for client.

Site visits and prepare site observations, clarifications (if not in line with the scope of work).

Determine the Company and Project assets.

Floating enquiries for material cost based on specifications and Subcontract for special service. Interact & introduce the new reputed suppliers / subcontractor to the company.

Quantity take-off for each service, maintain project wise tender document files and data bank.

Manpower calculations, Equipment calculations, Costing & tendering for projects.

Prepare Technical and Commercial submission based on tender documents for Projects and Maintenance.

Calculate Spare parts & Consumable for maintenance jobs.

Review quotations for technical spec compliance, deviations, cost comparisons and exclusions.

Prepare the project strategy and Identify risks list.

Prepare PCA (Project cost analysis) or Estimate the project as service wise based on BOQ.

Operations & Execution:

After award of the project handling the project execution based on company requirement.

Execute Projects and Maintenance, Planning for Preventive, Corrective & Reactive/Breakdown maintenance

Acquire Resources, Prepare requests for Procurement of the Material and Material Submittal.

Supervision for Detail Engineering, Execution Team and Manpower allocation for task wise.

Design & Calculations for HVAC, Piping and Plumbing.

ESP Calculation for AHU, FCU & Fans and Pump static head calculation.

Duct design and routing based on Air flow distribution and Chilled water pipe sizing & routing.

Heat load calculation with Carrier E20 form & HAP. Knowledge in ASHRAE 62.1.

Prepare GA drawings for different services and ISOMETRIC drawings

Preparation of Schedule, Schematic and riser diagrams

Preparation of SLD for Consultant approvals.

Coordinating with Architectural and Structural consultants.

Reports preparation for any discrepancy in inputs like Mech.Design, Architectural or Structural drawings.

Prepare and participate in Testing & Commissioning as per procedures.

Responsibilities with Companies:

1. Presently working for Intergulf General Contacting (Emdad) at UAE as Sr. Mechanical & Estimation Engineer- from Dec’ 2014 to till date

Projects Handled:

Oil & Gas

• ADNOC, TAKREER, GASCO, ADMA-OPC, ZADCO, FERTIL, BOROUGE and ADGAS etc., Abu Dhabi, Projects - Refurbishment of Technical Bldgs., Control Bldgs., Admin and Substations.

Maintenance and Repair Service

• Maintenance services like FM, HVAC, Civil, Electrical (LV), RO & STP, etc. for All ADNOC facilities, ADNOC Distribution, GASCO Pipeline, ADPC, ADMC, ADMM (Yas marina Circuit), ADSSC etc.

Preventive, Corrective and Breakdown Maintenance:

• HVAC – Chiller, AHU, FCU, Pumps, Ducting, Chilled water pipe, Valves, Grills & Diffusers etc.

• PLUMBING – Water Distribution for Buildings, Irrigation, Utilities, Valve and Pump stations etc., Drainage, Sewage and Rain water - Piping network, collections pits & tanks and lifting stations etc.

• ELECTRICAL – LV maintenance, Electrical Panels, Control Panels, Distribution boards, Breakers, Junction Boxes, Cables and Cable Management system etc.,

• FIRE & GAS AND FIREFIGHTING: Fire, Gas, Smoke and Heat detection system, FACP, Sprinkler, Hydrants, Foam and extinguisher system, Piping network, Valves and Pump stations.

• RO & STP – Operation and Maintenance for RO & STP Plants.

• INFRASTRUCTURE – Water, Drainage and Sewage network systems, Electrical Cabling (HV & MV) systems.

• CIVIL – Excavation and Backfilling, Repair works for Pavements, Curbs, Culverts, Roads, Fencing, Masonry, Carpenter, Joinery and Painting works etc.

CONTRACTS WON DURING PERIOD 2015-TILL DATE

FY 2020 - 2021 – Total Contracts Won (30.00 million AED)

• ADNOC Refining (Takreer) – Revamp Phase-5 of HVAC Project

• ADNOC OFFSHORE (ZADCO) - Upgrading of existing HVAC System at Zirku Control Room (S1474)

FY 2019 - 2020 – Total Contracts Won (183.00 million AED)

• ADNOC Polymers (BOROUGE) & ADNOC Fertilizer (FERTIL) – HVAC Operations & Maintenance Services for Borouge & Fertilizers

• ADNOC OFFSHORE (ZADCO) - Civil Maintenance Services for ADNOC Offshore

• ADNOC OFFSHORE (ZADCO) - Operation & Maintenance Support Services for ADNOC Offshore Installation for Package 3, Region 6 (Zirku Island) and Package 1, Region 1 (Upper Zakum Field)

FY 2018 - 2019 – Total Contracts Won (15.00 million AED)

• ADNOC Refining (Takreer) – Revamp Phase-3 of HVAC Project

• ADNOC Polymers (BOROUGE) – Call out Services for Chilled and Cooling Water Refrigeration Units in B3-LDPE Plant at Ruwais

• ADNOC Refining (Takreer) – Work Service Orders 3no.s

FY 2017 - 2018 – Total Contracts Won (62.00 million AED)

• Abu Dhabi Polymers Company Limited (BOROUGE)- Procurement and Installation Works for Terminal Lights at Ruwais Abu Dhabi

• Abu Dhabi Gas Industries Ltd. Gasco – Habshan-5 & HSGP – Filtration Ducting System for Maintenance Building in HSGP & Dosing Unit for Chilled Water System in IFS Buildings

• Abu Dhabi Marine Operating Company (ADMA-OPCO) – Civil Maintenance Services for ADMA-OPCO and ADGAS at Das Island

FY 2016 - 2017 – Total Contracts Won (20.00 million AED)

• Elixier ADNOC Linde - HVAC Systems Services Contract

• Abu Dhabi Oil Refining Company (Takreer) – Revamp Phase-2 of HVAC Project

• Abu Dhabi Gas Industries Ltd. Gasco – ASAB – Enhancement of ASAB-1 Non-Process Building HVAC System Abu Dhabi Gas Industries Ltd. Gasco – ASAB – Upgrade of HVAC Systems in Old Arc Room - ASAB

FY 2015 - 2016 – Total Contracts Won (25.00 million AED)

• Abu Dhabi Oil Refining Company (Takreer) – Revamp of HVAC Project

• Zakum Development Company - Supply, Installation & Commissioning of New PCB Controllers for HVAC DDC Control Panel at Satah Ler in Zirku Island

• Abu Dhabi Gas Industries Ltd. Gasco – Ruwais – Operation and Maintenance support service

2. Worked for Al Fara'a Group at UAE as Mechanical Engineer-(Design & Estimation) from March’ 2012 to Dec'2014

Major Type of Projects Handled:

Industrial/infrastructure

• BRF Food processing, Kizad, Abu Dhabi

• Dates Form, Strata Manufacturing Pjsc, Al Ain

Airports

• Abu Dhabi International Airport Gate Expansion A-380, Commercial Bldg, etc., Abu Dhabi

• Al Bateen VIP terminal, Abu Dhabi

Hospital

a. Specialty type

• SKMC Dialysis center, Tawam Dialysis, Gayathi community, Al Silla Community Hospitals, Abu Dhabi

• Mediclinic City Hospital- Dubai

b. Clinic type

• Al Towayya, Mushrif, Khalifa City-A, Al Falah Ambulatories, Abu Dhabi

• City walk Clinic-Dubai

• Health Center at Budaiya, Bahrain

Educational

• Chinese, Al rawfat, Al Bayya & Al Falah, New Global intl., Amity international schools - Abu Dhabi

• Secondary technical school - Al Ain

Residential

A. High rise

• Plaza view tower(45storey), Corniche Residential Tower (50storey), ENI Shams (30 Storey), ADCP Apartment Tower, Hotel Apartment towers, Etihad Tower etc. - Abu Dhabi

• Duja Tower (50 Storey), Apartment Tower (46 storey), Cresent Hotel, Tecom Twin Towers, Jumeirah Hotel Apartment - Dubai

b. Villas/Palace

• Sheikha Sham shah Residential Palace - Abu Dhabi

• Bawabat Al Sharq Villas Abu Dhabi,

• Akoya Villas, Damac apartments, Motor city uptown - Dubai

Commercial

• Al Habtoor Royal Car Show Room, Al Ain,

• Central mall, Delma Mall expansion, ADDC Filing Stores, etc., - Abu Dhabi

• ADIB Tower, First Gulf Bank - Abu Dhabi

UAE Govt. Projects

• Police Headquarters, Police Training School - Abu Dhabi

• Abu Dhabi Accountability Authority, Abu Dhabi

• Presidential Guard Command - Abu Dhabi

3. Worked for Airmech W.L.L at Bahrain as Mechanical Engineer from March’ 2009 to March' 2012

Major Type of Projects Handled:

Oil & Gas

• Bapco Bsc, Banagas, MTQ Oil field services W.L.L, Belexco Anodizing plant –phase IV, Bahrain

Industrial/infrastructure

• Aluminum Bahrain BSC, Bahrain

Clinic type

• Health Center at Budaiya, Bahrain

Educational

• Bahrain Training Institute, Arab Open university - Bahrain

Villas/Palace

• Sheikh Hamad Palace, Bahrain

4. Worked for GHD Global Pty. at Dubai as Lead. MEP Designer from Dec’ 2008 to March’ 2009

Major Type of Projects Handled:

Industrial/infrastructure

• Ghana Swro, Desalination Plant-Ghana

Commercial

• Centro Hotel, Sharjah International Airport

5. Worked for RamTech at Dubai & Hyderabad as Sr. Engineer MEP from Dec’ 2005 to Dec'2008.

Major Type of Projects Handled:

Industrial/infrastructure

• Jabel Ali Down Town Reticulation Cooling Plant-Dubai

Airports

• Dubai International Airport-Termainal-3, Dubai

• Perth airport, Australia (Offsite project)

Hospital

• Hollywood Hospital, Australia (Offsite project)

Commercial

• Sports City accommodations

• Etihad Tower

6. Worked as Group Leader from Nov’2000 to Dec’2005 at IIC Technologies (P) Ltd., -

Hyderabad

Major Projects:

A. P & ID (Piping and Instrumentation Drawings)

Software: AutoCAD R-14

Description: This Project includes Digitization of various Industries Piping Layouts. This includes digitization of various features like pipes having different thickness, convergent, divergent and placing of so many symbols, which represents Diameter of Pipes.

B. NPCIL (Nuclear Power Corporation of India Ltd.,)

Software: AutoCAD R-14

Description: This project deals with digitalization of various mechanical, constructional drawings of Kaiga Atomic Power plant & Rajasthan Atomic Power Plant. This digitalization process involves detail parts of civil, structural, placement of various mechanical machinery and electrical layouts (Cable tray routing, tubing layout).

C. US - TELECOM (VERZON, US)

Software: Micro station V8

Project in Brief: The main concept of Telecom, creating networking from one place to another from CO (Central office)

Type of features included: Protectors, Manholes, Conduits, Cables, Fiber cables, Poles, Terminals, Devices, Air pressure, Pair gains, Cross connectors and Street centerlines

Work Description:

As a Group Leader my role is as mentioned below:

• Training, Handling of manpower and work distribution

• Check the scrubbed sheets and give proper feed back

• Proper check for all kind of features captured in grids

• Cell completion through final checklist

7. As Project in-charge from Feb’99 to Nov’2000 at Intensive Air Systems Ltd., - Hyderabad.

Work Description:

As a Project In-Charge, at M/s. Intensive Air systems Ltd., My responsibilities were

• Preparing project necessary documents for digitalizing the G.A. drawings

• Monitoring and evaluation of in-house completed G.A (General -arrangement) drawings Like Duct route fixing, locating dust collection and ventilation equipments (Bag filters, Cyclone, Centrifugal fan and Filter Boxes etc.).

• Getting approval of G.A. (General-Arrangement) Drawings from the Client

• Preparation of Bill of Material for the entire Project

• Preparation & developing of production drawings for manufacturing of the equipments ducting (Transition piece, bend etc.,) filter plenum, centrifugal fan, Bag filter, Cyclone and Grills etc.

• Inspection of the manufactured items like Ducting, Equipments and Centrifugal Fans

• Supervision of foundation for equipment at clients works site.

• Supervision for the installation of entire system.

• Developing all the above-mentioned Execution drawings in Auto CAD

Personal Profile

Gender Male

Marital Status Married

Date of Birth 17 June 1977

Nationality Indian

Passport No J4384095

UAE Driving License 2269305

I ensure that all the details furnished above are true to the best of my knowledge and belief.

Date:

Place: (T. SRINIVAS)