Post Job Free

Resume

Sign in

Solar Generation Metropolitan Water

Location:
Canoga Park, CA
Salary:
80,000
Posted:
August 21, 2021

Contact this candidate

Resume:

Amir Pia Page * of *

***** ********** ****, **** *****, CA 91307

Email Address: adoaxj@r.postjobfree.com

Phone Number: 310-***-****

Proven project support services for over 12 years for private and public works clients. Facilitated coordination among contractors, architects-Engineers, and owners. Expert with the Microsoft Suite of programs and in preparing project schedules using Primavera P6 and MS Projects. Detailed-oriented, quality-focused, possess excellent written and verbal communication skills, and a team player. Well versed in developing partnerships and coordinating with team members, and building positive rapport with clients.

• RFIs, submittals, change orders

• Resolving field issues

• Documenting as-built conditions

• Preparing progress reports

• Monitoring resolution of final punch

list items, closeout activities

• Preparing independent change order

cost estimates

• Negotiation of change orders

• Reviewing and processing pay

applications

• Prevailing wage verification

Kit Builders Construction Inc., Various Projects, Jan 2020 – Current Project Engineer, Various Misc. projects, $1M-$3M

• Prepared monthly invoices

• Site supervision and supervised the field crew

• Coordinated with various vendors and subcontractors

• Prepared Change Order Packages

• Prepared weekly status update reports

• Maintained and updated the Project book

• Coordinated with the designer and multiple agencies in order to resolve the field issues Arcadis, June 2019-December 2019

Assistant Construction Manager, Santa Clarita Valley Sheriff’s Station, $46M This project consists of the construction of an approximate 46,560 square foot Station main building, 4,165 square foot vehicle maintenance building and all associated onsite and offsite improvements. Construction activities will include but are not limited to the following: main station facility, vehicle maintenance building, parking areas, helipad, footings for the installation of a 170' high communications tower, emergency generator (100% load transfer) with fuel. storage for a 72-hour runtime, extension of all utilities from the completed previous Phase to the required onsite points of connection, installation of Edison structures, utility extensions for a future. 4,000 square foot building pad, sidewalk, driveway approach, driveways, fueling station, fuel storage (12,000 gallons), car wash area, clarifier, trash enclosure, outdoor lockers with canopy, oversized vehicle, parking area with canopy, used tire storage area, landscaping, bio filtration systems, perimeter security walls, perimeter security gates, perimeter retaining walls, and onsite retaining walls.

• Reviewed monthly invoices for accuracy

• Reviewed and compared Submittal packages with the specifications for accuracy and completeness

• Site supervision, Prepared daily status update reports and enforcing OSHA standards as needed

• Reviewed and processed RFIs, Submittals, and maintained hardcopies and softcopies for record purposing

• Prepared RFIs, Submittals, Change order logs

• Attended and prepared weekly construction meeting minutes and CM/Owner meeting minutes and other meetings as needed

• Reviewed the construction Change Directives and Instructional bulletins for accuracy EDUCATION

M.S., Geotechnical

Engineering, Azad

University, Iran

B.S., Civil Engineering,

Azad University, Iran

PROFESSIONAL

AFFILIATION

Construction Management

Association of America

SOFTWARE

MS Microsoft Suite (Word,

Excel, Outlook)

PowerPoint

Expedition

Unifier

Primavera P6

MS Projects

Primavera Unifier

Contract Manager

ProLog

AutoCAD

Civil 3-D

Sap 2000

ETABS

ABAQUS

Matlab

Adobe Suite (Photoshop,

InDesign, Illustrator)

Projectwise

AMIR PIA

Amir Pia Page 2 of 3

• Maintained and updated the Project book

• Coordinated with the designer and multiple agencies in order to resolve the field issues. Kit Builders Construction Inc., Various Projects, April 2018 – May 2019 Project Engineer, Various Misc. projects, $1M-$3M

• Prepared monthly invoices

• Site supervision and supervised the field crew

• Coordinated with various vendors and subcontractors

• Prepared Change Order Packages

• Prepared monthly status update reports

• Maintained and updated the Project book

• Coordinated with the designer and multiple agencies in order to resolve the field issues IEM (Integrated Engineering Management), Various Projects, JAN 2013 – FEB 2018 IEM - LAWA – Airside Element Runway 25R-7L RSA, Los Angeles, CA OFFICE ENGINEER II, 3/16 – 2/18, $112M

Federal government requiring US airports to improve the Runway Safety Area (RSA) zone at the end of each runway. Airside Element Runway 24L-6R RSA and 25R-7L RSA were part of this program.

• Coordinated with Contractors and LAWA Inspectors to review and process the contractor’s monthly pay request applications

• Coordinated with the design engineers to secure review comments for shop drawings and submittals

• Coordinated with the design engineers to respond to RFI’s

• Distributed shop drawings, submittals, and RFI’s to the project team members

• Received, reviewed, and input data in Prolog, prepared prolog status reports

• Maintained project files and document / drawing management systems

• Attended progress meetings, prepared meeting minutes, and distributed minutes

• Updated and maintained logs for all RFI’s, Submittals, Change Directives (CD), Contractor Change Request (CCR)

• Updated and maintained logs for all Inspectors Job Memos, Inspectors Notices of Non-Compliance, Safety Notices, and all incoming and outgoing construction correspondences IEM - LAWA – Airside Element Runway 24L-6R RSA, Los Angeles, CA OFFICE ENGINEER II, 8/15 – 2/16, $46M

Federal government requiring US airports to improve the Runway Safety Area (RSA) zone at the end of each runway. Airside Element Runway 24L-6R RSA and 25R-7L RSA were part of this program.

• Coordinated with Contractors and LAWA Inspectors to review and process the contractor’ monthly pay request applications

• Coordinated with the design engineers to secure review comments for shop drawings and submittals

• Coordinated with the design engineers to respond to reports

• Maintained project files and document / drawing management system; RFI’s

• Distributed shop drawings, submittals, and RFI’s to the project team members

• Received, reviewed, and inputted correspondences in Prolog and prepare prolog status reports (hard and electronic copies)

• Attended progress meetings, documented, and distributed minutes of these meetings

• Updated and maintainted logs for all RFI’s, Shop Drawings/submittals, change directives (CD), Contractor Change Request

(CCR), Inspectors Job Memos, Inspectors Notices of Non-Compliance, Safety Notices, and all incoming and outgoing construction correspondences

IEM - Port of Long Beach – Middle Harbor Terminal Redevelopment, Marine Ops/Power Shop Project, Long Beach, CA PROJECT ENGINEER, 02/14 – 05/2015, $32M

Focusing on Marine Operation, Power Shop Building, and Slip Fill projects. The Marine Ops & Power Shop Building involves Construction of a 14,000 S.F. 2-story, steel-framed marine operations building and a 50,000 S.F. 2-story, steel maintenance and repair building with automobile parking lot, internal terminal roadway, site improvements, parameter security fence, landscaping, site utilities. The Slip Fill project involved demolition of the existing wharf and bulkhead systems, removal and disposal of treated wood, marine excavation, dredging, placement of rock slope, wave protection, temporary storm drain system, paving, and wick drains installation.

• Evaluated contractor’s change order request for merit

• Reviewed and compared the contractor’s proposed costs and the third-party cost estimates

• Investigated and resolved cost discrepancies

• Prepared independent change order estimates and participated in change order negotiations

• Reviewed and processed submittals and RFIs

Amir Pia Page 3 of 3

• Coordinated outstanding field issues with the design engineer and the contractor

• Prepared as-built drawings

• Verified contractors’ prevailing wage reports

• Assisted in project closeout activities

IEM - LADWP Franklin Reservoir No. 2 Floating Cover PROJECT SCHEDULER, MAR 2015

LADWP Lower Franklin Reservoir No. 2 is a 360-million-gallon reservoir in Beverly Hills, CA which supplies drinking water to about 375,000 people in Beverly Hills and western Los Angeles. This project consisted of demolishing the existing Chafer lining, reservoir floating cover, and associated pipelines and electrical systems and installing new CSPE floating cover & Chafer liner, inlet and outlet structures, concrete vaults, access roadways, and other various site improvements on this 12 –acre site.

• Prepared the construction project schedule, using Primavera P6, at the final design phase. IEM - F. E. Weymouth Water Treatment Plant Solar Generation Facility – Metropolitan Water District, La Verne, CA PROJECT SCHEDULER, MAR 2015

This 3 MW photovoltaic solar generation facility will have a 6.19-acre and 8.55-acre solar panel areas, including ground-mount solar panels on fixed, single, or dual axis tracking platforms, equipment pads, canopies, inverters, weather station, monitoring system, and other appurtenant work.

• Prepared the construction project schedule for this project at the final design phase. IEM - Central Region Los Angeles High School No. 12 (LAUSD), Los Angeles, CA OFFICE ENGINEER, 1/2013-4/2013, $22M

This project involved construction of one 3-story high school building with 19 classrooms over one level of semi-subterranean parking structure for 47 cars, valued at $22 million.

• Assisting in reviewing, processing, and responding to Requests for Information and Submittals

• Maintained project records by using Expedition (LAUSD’s document tracking software), processing change order documents

• Documented field issues

• Attended the weekly progress meetings

• Assisted in capturing Contractor’s daily construction progress, taking project photos, recording unforeseen field conditions, updating as-built drawings and assisting with project closeout tasks Nama Sang Sofeh Construction, Inc., Iran

PROJECT ENGINEER, 2005 – 2012, $5M

• Provided project-engineering services for three complete build-out residential concrete/masonry buildings

• Reviewed the project scope and permit requirements to establish the list of pre-construction activities and ensured completion of these activities in a timely manner

• Managed construction activities for excavation, grading, concrete and masonry structures, site utilities, and building interior and exterior finishes

• Reviewed the proposed and existing grading plan, performed quantity take-off on the net borrow/waste, reviewed as-built drawings for any subsurface utilities, and coordinated with the governing agencies

• Coordinated and resolved field issues with the design engineer

• Created and managed project schedule

• Monitored project budget and expenditures

• Supervised the field crew



Contact this candidate