Post Job Free

Resume

Sign in

Planning Engineer Project Planner

Location:
Lagos, Nigeria
Posted:
August 20, 2021

Contact this candidate

Resume:

OKOH, EMMANUEL O. (FTD, CPCM)

Address: Olowopopo way, Gbetu Street, Lekki-Epe Expressway, Lagos State

Alternate Address: 6 Market Road, Rumuomasi, Port Harcourt, Rivers State. G.S.M: 080********, 080********. E-mail: adoaeb@r.postjobfree.com

BACKGROUND

Meticulous Planning Engineer with 8years experience in applying knowledge of planning, scheduling, monitoring and control to ensure the cost-effective and timely completion of CapEx projects in the Oil & Gas and Construction industry. Committed to determining the optimal sequence of works at site while implementing efficient construction methods with Health and Safety considerations.

PROFESSIONAL EXPERIENCE

Position: Project Planning Engineer/Project Lead Jan. 2019 – Till date

Company: Omiti Engineering FZE Ltd.

Projects: Dangote Oil Refinery & Petrochemicals Project LFTZ (Underground Piping Works, Structural Steel Works and Crude Oil Trading Facilities Composite Project).

Scope: Peripheral Cooling Water and Fire Network Underground Piping (over 10km) with associated Civil works and Structural Steel Works (over 9000mt). Civil and Mechanical Construction for the Crude Oil Trading Facility which includes UG and AG piping works (over 15km), Mechanical & Electrical works.

Job Roles:

Established the project schedule baseline with project team using Primavera P6 software and on a weekly basis prepare Quantitative Work 3weeks Lookahead Schedule.

Designed Progress Measurement Sheet (PMS) using Microsoft Excel with which work carried out is measured as per physical completion, recorded and compared against planned work as a Project control mechanism then on monthly approval from client progress measurement serves as a basis for raising monthly commercial invoice.

Prepared daily, weekly and monthly (S-curve) reports which covers personnel on board, areas of concern, daily activities and next day lookaheads etc.

Managing subcontractors to attain optimal performance by ensuring required information for execution is issued promptly.

Monitor subcontractor performance through their daily reports and regular site visits.

Reconciliation of works, establishing Value of work done (VOWD) and Reconciliation of Free Issue Materials (FIM).

Validation of Subcontractors work claims prior to Management approval of subcontractor’s invoice.

Prepared and maintained Project Master sheets for all projects.

Project: Dangote Oil Refinery & Petrochemicals Project LFTZ (Dangote Heaters Project)

Scope: Erection/Installation of Crude Refining Heaters:

Crude Distillation Units, Continuous Catalytic Reformer, Charge Heaters, Interheaters, Naphtha Hydrotreating Unit, Product Fractionator Reboiler Heater and Combined Feed Heater.

Job Roles:

Established the project schedule baseline with project team using Primavera P6 software and MS Project.

Designed Progress Measurement Sheet (PMS) using Microsoft Excel with which work carried out is measured as per physical completion, recorded and compared against planned work as a Project control mechanism then on monthly approval from client progress measurement serves as a basis for raising monthly commercial invoice.

Prepared daily, weekly and monthly (s-curve) reports which covers personnel on board, areas of concern, daily activities and next day lookaheads etc.

Established Field Change Report system as a means of capturing additional works and raising claims.

Position: Project Planning Engineer Feb. 2017 – Jan. 2019 (2 years)

Company: Deux Projects Ltd.

Project: Dangote Fertilizer Project, LFTZ.

Scope: Equipment Foundations Contract (Over 4000m3 of Reinforced Concrete) for Ammonia, Urea Plants, Bulk storage and Bagging building and Civil Underwound works which includes Manholes, pits, electrical and instrument trenches etc. Buildings Contract (4 Process Buildings, 1 Control Building & 10 Non-process Buildings) with Mechanical. Electrical & Plumbing works.

Job Roles:

Prepared and maintained the EPC project baseline schedule using Primavera P6 and MS Project.

Adequately supported execution team to ensure timely work delivery.

Organizing project coordination meetings with project team and preparing tender programmes/work execution plan as need arises.

Generated daily, weekly and monthly (s-curve) reports which covers personnel on board, material consumption tracking (consumables), areas of concern, daily activities and next day lookaheads etc.

Proactively informed Project team and PMC on schedule slippage using Delay notices and subsequent mitigation and remediation applied.

Managing subcontractors to attain optimal performance by ensuring required information for execution is issued promptly.

Monitor subcontractor performance through their daily reports and regular site visits.

Position: Project Planner/Scheduler Aug., 2015 – Jan. 2017 (1year, 8 months) Company: Cappa & D’Alberto Plc.

Project: BUA Office Block Complex, Victoria Island, Lagos.

Scope: Finishes work from carcass to completion of existing high rise building which includes civil works, MEP works and finishing. External works which includes Underground diesel tank and Sewage Treatment Plant.

Project: Mobil House Refurbishment Project (MHRP)

Scope: General refurbishment works as GC with subcontractors in various disciplines on live high-rise building. Subprojects including Waste treatment plant project, Façade repairs project, Tennis court repairs project, Atrium skylight repairs project and Car park resurfacing works.

Job Roles:

Maintained baseline schedule and coordinated work execution ensuring a smooth transition and work flow during activity trade-offs.

Assessed schedule risks, opportunities and planned accordingly.

Updated progress measurement sheet for weekly and monthly close-out reports and s-curve plots.

Advised PMT regularly on measures towards mitigating schedule slippage.

Accurate capture of delays which facilitated extension of time claims and approval.

Prepared tender and detailed programme of works and resolved programme of works issues on other company project sites when required.

Managing subcontractors to attain optimal performance by ensuring required information for execution is issued promptly.

Monitor subcontractor performance through their daily reports and regular site visits.

Position: Project Planning Engineer Jan. 2014 – Aug., 2015 (1year, 8 months)

Company: Citech Engineering Ltd. (City & Guilds of London Institute Approved)

Job Roles:

Prepared construction schedules for tenders, maintained schedules in existing projects and overall cost control using EVM techniques and Advanced Excel.

Position: Project Engineer/Planner Oct, 2013 – Dec.2013 (3 months)

Company: Hyprops Nig. Ltd.

Project: Maintenance of Steel Masts at Shell location PH (Agbada II FLB).

Job Roles:

Developed Project Implementation plan, maintained schedule baseline.

Ensured strict compliance to contract scope of works with all its technicalities.

Position: Project Planning, Monitoring & Control Trainee Feb., 2009 – Dec., 2009 (11 months)

Company: Income Electrix Ltd. (Electrical Solutions Provider)

Project: 2x30MVA, 132/33kV Ukwa West Substation Project, Abia State.

Job Roles:

WBS/Project Scheduling using MS Project and Primavera P3 and daily work progress tracking.

Progress Update and Project documentation.

Prepared shop drawings using AutoCAD.

National Youth Service Corps (NYSC) July, 2012 – June, 2013 (1 year)

FORMAL EDUCATION

Federal University of Oye Ekiti, Ekiti State.

B.Eng in Mechanical Engineering In-progress

Federal Polytechnic Nekede, Owerri

HND in Mechanical Engineering - Automotive (Upper Credit) 2011

ND in Mechanical Engineering (Upper Credit)

Air Force Secondary School, Port Harcourt

WASSCE & NECO 2005

Air Force Primary School, Port Harcourt

FSLC 1999

PROFESSIONAL QUALIFICATION

The City & Guilds of London Institute

Full Technological Diploma (FTD) in Mechanical Engineering 2018

Advanced Technician Diploma (HND Equiv.) in Mechanical Engineering 2015

Technician Diploma (OND Equiv.) in Mechanical Engineering 2014

TRAINING/CERTIFICATION/SEMINAR ATTENDED

Professional Planning Engineer course (PPE) Ongoing

Advance Planning with Primavera 2020

Quantitative Schedule Risk Analysis with Primavera 2020

Certificate Program in Contract Management (CPCM) 2019

Construction Management course 2018

Seminar on Best Practices of Capital Projects Management 2017

by Oracle Primavera Construction & Engineering

Project Management Professionals Training (Using PMBOK) 2017

Technical Project Management 2017

Caterpillar Foundational Technician Training – Level 1 2016

Planning with Primavera P6 Course 2016

Diploma in Project Management 2016

Basic Subsea Course 2015

HYDROGRAPHIC SURVEY: Navigation, Positioning & Bathymetry 2013

General HSE course & HSE Supervision course (Level 3) 2013

AutoCAD General, AutoCAD Mechanical, AutoCAD P&ID 2013

Proficiency Certificate in Management 2012

Project Management Professional (PMP) Training 2012

(Using MS Project & Primavera P6)

Autodesk International Certification 2010

Diploma in Computer Appreciation 2009

PERSONAL DATA

Date of Birth: 4th of November, 1987; Hometown: Issele-Uku;

Sex: Male; L.G.A.: Aniocha North;

Marital Status: Married; State of Origin: Delta State;

Interests: Project Management, Engineering Design, Nationality: Nigerian;

Manufacturing, Oil & Gas, Construction,

Plant Technology etc.

PROJECT WORK

Design and Construction of a Pyrolytic Reduction of 2011

Polyethene Waste Machine (Final year Project)



Contact this candidate