Post Job Free

Resume

Sign in

Energy Services Mathematics Teacher

Location:
Lagos, Nigeria
Posted:
October 30, 2021

Contact this candidate

Resume:

NAME : Famuyide Moses Mobolaji

SEX : Male

DATE OF BIRTH : 3rd February, 1989

MARITAL STATUS : Married

CONTACT : +234**********; +234**********; ado7dg@r.postjobfree.com NATIONALITY : Nigerian

EDUCATION:

2011: Olabisi Onabanjo University, Ago-Iwoye Ogun state, Nigeria

(BSc. Physics with Electronics)

2003: Jelly-Las College, Agege Lagos, Nigeria

(West African Secondary School Certificate Examination) 1997: Jelly-Las Nursery and Primary School, Agege Lagos, Nigeria

(First School Leaving Certificate)

PROFESSIONAL CERTIFICATIONS:

NEBOSH IGC

IOSH Managing Safely

HSE Level 3 – ISPON

General Health Safety & Environment – ISPON

COSHH Manager Certificate

Risk Assessor Certification

WORK EXPERIENCE:

DATE : January 2018 –

COMPANY : Hybrid Group Limited

CLIENT : Royal Haskoning DHV (RHDHV)

PROJECT : Building and Construction of International Breweries Plant (ABInBev), Nigeria. POSITION : HSE Supervisor

MILESTONES & ACHIEVEMENTS:

Member of the HSE team that attained a milestone achievement and celebration of 1,000,000 Man-Hours without LTI on Gateway 4.1 Phase 2 from January 2019 – September 2019.

Member of the HSE team that attained another milestone achievement and celebration of 2,000,000 Man-Hours without LTI on Gateway 4.1 Phase 2 from January 2019 – July 2020.

Member of the HSE team that attained another milestone achievement and celebration of 3,000,000 Man-Hours without LTI on Gateway 4.1 Phase 2 from January 2019 – July 2021.

Erection of High Rise Steel Structured Buildings (up to approx. 40mtrs height) including roof works

Erection and Installation of Unitanks, CO2 Tanks, Bright Beer Tanks (BBT) etc.

Ingression & installation of machines and equipment including Boilers, Washers, Pasteurizers, Conveyors, Labellers, Air Handling Units (AHU), Chillers, Air Compressors etc.

Installation and Commissioning of 6Nos of 11,000V Generators

Construction and Commissioning of 4Nos of RGB Packaging Lines (Bottle and Pet Lines) for the production of Beer and Malt

Construction and Commissioning of 1Nos of Keg Line for the production of Beer

Erection of 6Nos of 30mtrs height Grain Storage Silos (involving Confined Space task)

Crane Lifting tasks involving Complex and Tandem lifts tasks using Heavy Duty Mobile Cranes (500tons, 250tons, 100tons), Self-Loaders, Forklift, Manitou, Reach Stacker etc.

Construction and Commissioning of Waste Water Treatment Plant (WWTP)

Construction and Commissioning of LNG Gas Plant for Power Generation

Fabrication of 8Nos of Tank Farm for Fuel Storage (AGO and HFO)

Erection of Steel Pipe Bridges for Convening Liquefied Products and Power/Signal Cables

Installation and commissioning of Minisub Transformers for Electrical Power Distribution and many other related jobs.

RESPONSIBILITIES:

Support and monitor HSE improvement proposals stating the non-conformance, proposed corrective action, required resources for corrective action and plan of implementation.

Investigate the root cause of HSE complaints put forward by staff members, customers, clients and contractors and report the analysis directly to the HSE Manager

Follow up to ensure that corrective actions are implemented where necessary and ensures that any certification requirements are complied with audit work being performed with ‘Safe Work Permit’

Safety supervision of contractors during project phases – Construction and Commissioning

Assist with the implementation of Job Safety Analysis and inspect job site activities during particularly difficult or hazardous work situations

Review and analyze incidents and make corrective actions or recommendations

Ensure compliance to safety management systems

Identify potential hazards before, during and after project execution while proffering short and long term solutions for contractors and the client

Provide professional/technical/competent advise on areas of safety in the work place

Promote zero accidents and injury-free workplace environment

Deliver ToolBox talks to members of the Management team and/or contractors for particularly high risk or critical jobs

DATE : September 2016 – December 2017

COMPANY : Rashy Wabson International Ltd.

CLIENT : Nigerian Bottling Company (NBC Coca-Cola); Nigerian Brewery (NB) PROJECT : Building of Greenfield Zone (Expansion Project) - NBC Asejire, Nigeria. Decommissioning & Evacuation of Beer Packaging Lines 1 & 2 – NB Nigeria. POSITION : HSE Supervisor

MILESTONES & ACHIEVEMENTS:

Proud member of the HSE team that attained a milestone achievement and celebration of 1,000,000 Man-Hours without LTI on Greenfield Project (NBC – Asejire Plant).

Successful installation of Machines and Equipments for Coca-Cola Pet Production including Spiral Conveyors, Labellers, Ozonator, Blow Mold, Air Handling Unit and Chillers etc.

Erection and Completion of Steel Structured Warehouse for Product Storage

Ingression and Egression of Plants and Machineries for Plant Optimization

Successful Decommissioning, Dismantling and Evacuation of Bottle Lines for Beer Production (Packaging Line 1 & 2) without LTI

RESPONSIBILITIES:

Ensure the implementation of company’s health and safety policies and practices

Advise management on safety issues by providing resource information on health and safety

Lead change in safety culture in the plants and depots

Review and revise safety policies with management team

Safety supervision of workforce during project phases – Construction and Commissioning

Carry out internal accident/incident investigations and audits

Assess, estimate, evaluate, record and control risks related to job activities (JSA)

Develop safe system of work (SSOW) for incoming projects to be executed

Implements risk control(s) to be utilized for incoming projects

Conducting tool box talk in conjunction with supervisors on regular basis.

Internal trainings for company workforce

Preparation of Permit to work.

DATE : October 2014 – June 2016

COMPANY : Torch Energy Services Limited.

POSITION : HSE Officer

PROJECT : Online Leak Repair of 10” Gas Pipeline, UNICEM Plant Calabar Construction of High Pressure CNG Pipeline, Jiali Ceramics, Agbara Igbesa Online Leak Repair of 8” Gas Pipeline, Lafarge Africa Plc., Ewekoro Plant II Online Leak Repair of 30” Gas Pipeline at KP29.236 WAGPCo, Ogun State. RESPONSIBILITIES

Advice the management team on current safety practices by international standards

Update of Safety statistics

Conduct tool box talk in conjunction with team leads on regular basis.

Security & Environmental Awareness

Job Hazard Analysis

House Keeping

Ensure compliance and enforcements of safety management systems

Carry out accident/incident investigations, audits and reporting

Permit to Work System

Provide weekly reports and documentations of activities as required DATE : November 2013 – October 2014 (CONTRACT)

COMPANY : Torch Energy Services Limited.

POSITION : Administrative Officer/Document Control Coordinator CLIENT : NGC (Nigeria Gas Company)

PROJECT : Engineering, Procurement & Construction of 8-inches Pipeline for Gas to Supply Abeokuta Customers

RESPONSIBILITIES

Tender, Prequalification and Bid Preparation

Company representative for conferences, exhibitions, meetings, business development & marketing

Document Control Coordinator

Design of departmental daily work plans, organization and planning

Periodical evaluation, review and amendment of existing and proposed organizational policies and procedures

Development of company profile and website

Company representative as safety officer during site projects

Document Control in all site-related project activities

Personnel and Finance Management

Design of daily work plans and procedures

Information intermediary between project site and base office

Manage time sheets and vacation schedules

Manage expense reports and direct reports

Support duties involving budgets, policies, procedures, organization and planning

Assists in the management of the division by evaluating existing and proposed organizational policies and procedures

Analyzes and evaluates requests from division personnel for changes in budget allocations in areas as systems and equipment; makes recommendations; and obtains final approval for changes

Lias with project superintendent to strategize daily activities for a unit; determines which information requires immediate attention of the executive, and delegates or refers other matters to various staff and departments

Enters and manipulates data and information in word processing, spreadsheet, and database applications by creating word processing and excel templates and form letters, macros and functions, or tables.

WORKS CARRIED OUT:

Inspection and Measurement of the Gas pipeline ROW

River Crossing Gas Pipeline Construction

Gas Pipeline Construction, welding and Installation

Line Flushing, Nitrogen Purging and Cleaning

Pipeline installation under/by federal /state highways and local Barriers.

Installation of long-term Cathodic Protection.

Rock blasting

Hydro-testing/Pressure-testing

Civil and structural Engineering Works

Shrink Sleeves Application (Wrapping)

Hot taping from an existing Gas-line

Civil Works “Valve Pit and PRMS shelter Construction”.

Thrust boring and installation of 4Nos 12” Pipeline at Major express, Minor road and Railway Crossing.

Construction & Installation of 8 PRMS shelters to spec.

Trenching/Backfilling/Ditching

DATE : November 2012 – October 2013 (NYSC)

COMPANY : Federal Government College, Odi. Bayelsa State. POSITION : Electrical Installation Facilitator & Mathematics Teacher DATE : 2011-2012

COMPANY : Unibold Computers

POSITION : Hardware, Software and Maintenance Engineer RESPONSIBILITY

Networking (LAN)

Troubleshooting, detecting and providing solutions/repairs to laptops and desktop PCs.

Software and Hardware Installations

Hardcore Computer Maintenance.

DATE : 2009

COMPANY : Lagos State Electricity Board (Industrial Attachment) POSITION : Assistant Electrical Technician

RESPONSIBILITY

Maintenance of Street-Light-Kiosks along major/minor roads

Repair of Electrical Street Lights

Troubleshooting/Repair of surface and underground cabling systems

Megger Application

RESEARCH PUBLICATION:

Famuyide M. M. (2011): “The effect of geomagnetic storm on interplanetary medium” A project work submitted to the Department of Physics, Olabisi Onabanjo University ABILITIES AND HOBBIES:

Abilities

Ability to exercise independent judgment in evaluating situations and making decisions

Ability to plan, organize supervise and review the work of subordinates performing a variety of functions

Ability to apply and explain rules, regulations, policies and procedures

Ability to establish and maintain effective working relationships

Ability to plan and project future operating needs Hobbies

Travelling, reading, playing football, chess

Surfing the internet

Logical reasoning

Reading science oriented books

REFEREES:

AVAILABLE ON REQUEST



Contact this candidate