Project Engineer (October 2020 to Present)
Technology Builders and Management Corporation
JOB DESCRIPTION
Discuss and study the new project with the project team regarding the plan and details of the incoming project.
Coordinate with the draftsman regarding the design or propose plan of the project.
Create Bill of Materials in line with the proposed project plan from the draftsman.
Create in-house estimate based on the proposed plan.
Request for the project leader to PR the project.
Once PR is approved, coordinate with the procurement to invite suppliers to attend a pre-bid meeting for the project.
Preside a pre-bid meeting to discuss the project. (provide drawing or conduct
a site inspection if needed)
Evaluate the quotation of the suppliers to award the project.
Communicate with the owner and the contractor to start the project.
Monitors works in progress and prepares weekly accomplishment report of the project status.
Ensure the quality of work and ensure that the project is delivered on time scheduled.
Assist the project head on the coordination and daily supervision of site.
Assist the project head for testing and commissioning of the project.
Create documents for all testing and other activities
Close the punch-list and turnover the project to the owner.
PROJECT ACCOMPLISHED
Nutri-Asia Cabuyao Plant
Supply and installation of SDI Platform
Supply and installation of 4x Batching Tank
Supply and installation of 3x Holding tank
Supply and installation of Steam Direct Injection (SDI) for line 6
Hauling and final positioning of Horizontal Form Fill and Seal (HFFS) for line 5
Hauling and final positioning of Horizontal Form Fill and Seal (HFFS) for line 6
Supply and installation of Spiral Cooling Tower for Line 5
Supply and installation of Spiral Cooling Tower for Line 6
Supply and installation of Outfeed conveyor from filler to cooling tunnel line 5
Supply and installation of Outfeed conveyor from filler to cooling tunnel line 6
Supply and installation of 4x Chiller for spiral cooling tunnel
Supply and installation of 2x Evaporator for spiral cooling tunnel
Construction of New Engineering office and bundling area
New VMS for Nutri-Asia Cabuyao Plant
Mechanical Project Engineer (November 2018 to March 2020)
Nexperia Philippines Inc (City Service Corporation)
JOB DESCRIPTION
Receive the layout and project memo from the IE and study the upcoming project.
Create Bill of Materials in line with the proposed project plan from IE.
Create in-house estimate based on the proposed plan.
Coordinate with the procurement to invite suppliers to attend a pre-bid meeting for the project.
Preside a pre-bid meeting to discuss the project. (provide drawing or conduct a site inspection if needed)
Call for a clarification meeting regarding the quotation of the contractor if they meet the client’s requirement and standards.
Evaluate the quotation of the suppliers to award the project.
Communicate with the owner and the contractor to start the project.
Monitors works in progress and prepares weekly accomplishment report of the project status.
Monitoring of the contractor’s daily activity and verify if they comply with safety standards.
Ensure the quality of work and ensure that the project is delivered on time scheduled.
Assist the project head on the coordination and daily supervision of site.
Assist the project head for testing and commissioning of the project.
Create documents for all testing and other activities
Inspect the quality and conformance of the actual project based on the plan. List down all the punchlist of the project based on the standard installation.
Closed the punchlist then endorse to the end user.
PROJECT ACCOMPLISHED
Plating Air Scrubber Project
Cooling Tower Replacement and Rehabilitation
Replacement of AHU 12 and AHU 17
10k Conversion of Former Flux Clean Area
New Facilities Workshop Project
HVAC Efficiency Project for Admin
Supply and Installation of 2x Transformer Deluge System @ Energy Building
Supply and Installation of Fire Sprinkler System for Materials Recovery Facilities
Dismantling of Former Sensors Office Project
Materials Pre-assy Relayout
Spareparts Room Relayout
Central Die Processing Merging
Supply and Installation of 2x New AHU for CDP
Supply and Installation of Supply and Return Plenum for CDP
Interconnection of NLFPAK and CDP Return and Supply Plenum
New Exhaust System for CDP
Additional Split type Aircon for Arena
Additional Split type Aircon for Foyer
Supply and Installation of Smardt Chiller and VFD Pumps
Stencil 3s Project
Q4 Firewall Project
Magazine Wash Expansion
LFPAK Wave 19
HVAC Design for Wave 19
LFPAK Ramp Part 1
HVAC Design for LFPAK Ramp Part 1
LFPAK Ramp Part 2
HVAC Design for LFPAK Ramp Part 2
PROFESSIONAL EXPERIENCE
Project Engineer (November 2017 to November 2018)
Technology Builders and Management Corporation
JOB DESCRIPTION
Discuss and study the new project with the project team regarding the plan and details of the incoming project.
Coordinate with the draftsman regarding the design or propose plan of the project.
Create Bill of Materials in line with the proposed project plan from the draftsman.
Create in-house estimate based on the proposed plan.
Request for the project leader to PR the project.
Once PR is approved, coordinate with the procurement to invite suppliers to attend a pre-bid meeting for the project.
Preside a pre-bid meeting to discuss the project. (provide drawing or conduct
a site inspection if needed)
Evaluate the quotation of the suppliers to award the project.
Communicate with the owner and the contractor to start the project.
Monitors works in progress and prepares weekly accomplishment report of the project status.
Ensure the quality of work and ensure that the project is delivered on time scheduled.
Assist the project head on the coordination and daily supervision of site.
Assist the project head for testing and commissioning of the project.
Create documents for all testing and other activities
Close the punch-list and turnover the project to the owner.
PROJECT ACCOMPLISHED
Pepsi Cola Products Philippines Inc
Bottle Washer Final Rinse Water Recovery System
Back Wash Final Rinse Water Recovery System
CIP Final Rinse Water Recovery System
Mondelez International Philippines
Supply and Installation of Methane Gas Flare System for WWTP
Warehouse Lighting Improvement
Nestle Tanauan
BBPMD Line 1 Project
oSupply and Installation of Packing Platform
oSupply and Installation of Filling Platform
oVarious Mechanical and Civil Works from Dry Tipping to Filling Silo
oSupply and Installation of Filling Silo
oHauling and Final Positioning of Filler Machine
BBPMD Line 6 Project
oSupply and Installation of Filling Silo
oVarious Mechanical and Civil Works from Dry Tipping to Filling Silo
oDirect Filling Project for Line 6
oSupply and Installation of Packing Platform
oSupply and Installation of Filling Platform
oHauling and Final Positioning of Filler Machine
Project Engineer (September 2016 to November 2017)
Palmer Asia Inc.(ISO 9001:2015 Certified)
JOB DESCRIPTION
Received, Discuss and study the new project with the design team regarding the proposed plan and details of the project.
Assists in preparation and implementation of assigned fire protection project.
Monitors works in progress and prepares weekly accomplishment report of the project status.
Ensure all procedures, plans, revisions and reports are submitted to the project manager for
review and approval.
Assist the project head on the coordination and daily supervision of site.
Prepares progress billing of every project.
Monitor quality and ensure smooth work progress.
Coordinate with other engineering disciplines in design aspects of the project.
Request for additional materials necessary for the completion of the project.
Coordinates materials delivery, receiving and checking at construction site.
Monitor compliance to applicable codes, practices and specifications.
Maintains safe and clean working environment by enforcing procedures, rules and regulations.
Contact authorities for the Fire Safety Inspection Certificate (FSIC) requirements and issuance.
PROJECT ACCOMPLISHED
Installation of Fire Hydrant in Republic Cement Iligan Inc.
Installation of AFSS in Republic Cement Iligan Inc.
Installation of FM200 Suppression System for Control room, Electrical
room and computer room Maibarara Geothermal Power Plant
Installation of Automatic Fire Sprinkler System for Control Annex Bldg in
Maibarara Geothermal Power Plant
Installation of Deluge Fire Suppression System for two transformer in
Maibarara Geothermal Power Plant
Installation of Automatic Kitchen Fire Suppression System in Family Mart
Boni Stop Over, BGC Taguig City
Installation of Automatic Kitchen Fire Suppression System in Family Mart
BGC Corporate Bldg, BGC Taguig City
CAD Engineer (January 2016 to September 2016)
TS Tech Business Services Philippines, Inc.
JOB DESCRIPTION
Discuss and study the new project with the team.
Target setting with the team and manager to meet the company’s quota.
Project planning on distributing the project and to set the schedule for each project.
Creation of 3D model and 2D drawing using CATIA V5 part design and generative surface design. The 3D model and 2D drawing is base on client’s standard and specification.
Check the 3D model and 2D drawing if they are correct and on client’s standard and specification.
Create documentation for the projects to manage and verify if the we meet the timing and schedule.
CAD Operator (June 2012 to June 2013)
Planex Technology Inc.
JOB DESCRIPTION
Discuss and study the new project with the team.
Target setting with the team and manager to meet the company’s quota.
Project planning on distributing the project and to set the schedule for each project.
Creation of 3D model and 2D drawing using CATIA V5 part design and generative surface design. The 3D model and 2D drawing is base on client’s standard and specification.
Check the 3D model and 2D drawing if they are correct and on client’s standard and specification.
Create documentation for the projects to manage and verify if the we meet the timing and schedule.
On The Job Training (June 2014 to September 2014)
Sunstar Mall Santa Cruz, Laguna
JOB DESCRIPTION
Assist the Engineer to Maintain a log of operational data and historical list of repairs for all building equipment
Assist the Engineer to Implement a comprehensive conservation program to reduce material and energy cost
Assist the Engineer to Provide technical assistance to mall tenants to ensure continuous business operations
Assist the Engineer to Comply with all local administrative and environmental requirements and laws
Assist the Engineer to Conduct and document regular material and equipment audit and ensure completeness
Assist the Engineer to Ensure that the mall security and safety facilities are properly maintain and fully operational.
CERTIFICATION, SEMINAR AND TRAININGS ATTENDED
ME, Mechanical Engineer Board Passer(September 2015)
License No.: 0090222
Catia V5 Fundamentals
February 16, 17 and 18, 19, 22, 2016 (40 hrs)
MDC Office Alpap II Bldg, Ayala Alabang, Muntinlupa
EDUCATIONAL ATTAINMENT
BS in Mechanical Engineering (2009- 2015)
Laguna State Polytechnic University, SCC
Sta. Cruz, Laguna
CHARACTER REFERENCE
Engr. Vhincent Paul Ylanan, M.E. Riley Libatique
Palmer Asia Inc., Project Supervisor TBMC President
0925- 9115-937 091*-***-****
I, the undersigned applicant, have personally completed this application. I understand that any misrepresentation, falsification or omission of information on this application or on any document used to secure employment shall be grounds for rejection of this application.
Jimuel A. Salvador
Engr. Jimuel A. Salvador
PERSONAL INFO:
Age: 28 years old
Address:
Brgy. Gatid, Santa Cruz, Laguna
Contact No.:
0945 - 5178 – 380
E-mail:
ado6hi@r.postjobfree.com
SKILLS:
-Knowledge in P&ID
-Project Management
-Facilities Operations and Maintenance
-Computer Literate (Microsoft office)
-Basic knowledge in AutoCAD, and Catia v5