Post Job Free

Resume

Sign in

Survey Engineer B.C

Location:
Pune, Maharashtra, India
Posted:
October 26, 2021

Contact this candidate

Resume:

Abu Saleh

S/o Abu Nasar

Vill+ P.O: Shahpur Baghauni, Distt : Samastipur (Bihar) Pin : 848131

095********,935-***-**** Email- ado53l@r.postjobfree.com ado53l@r.postjobfree.com Apply:

Position:

Suitable Post

Sr Engineer Survey

Name of Firm:

Name of Staff:

Profession:

Current project:

Role:

Date of Birth:

Years with Firm:

Nationality:

Afcons Infrastructural Ltd.

Abu Saleh

Civil Engineering

Mumbai Pune Missing Link Project

Survey Work

05.01.1979

Feb 2013

Indian

Mob:-

095********, 935-***-****

Key Qualifications:

More than having 17 yrs. Of professional experience of planning and survey of road and bridge project works, involved with projects funded by Indian Affair. Highly experienced in Survey, construction of road and remained the in-charge of construction supervision of structural works and road works like Travers, TBM checking, Layout, Centreline checking all layers checking like Emb, Sub grade, GSB, WMM, DBM, BC. And Kerb Major bridges, minor bridges, Culvert’s layout etc. Supervise the work as per approved working drawing in general conditions as well as technical specification of MORTH. Summary of credentials:

• Experienced in Topographical survey and construction of Road, bridge & Ship repair yard &Dry Dock complex projects.

Have done 2 projects in highway construction.

Have done 1 project in highway Tunnel construction.

Have done 1 project ship repair yard & dry dock complex.

Have done more than 20 projects in topographical survey. Relevant project experiences are as follows:

Presently I am working in Afcons Infrastructure.

Sr Engineer Survey: Construction for, Mumbai-Pune Missing Link Project (With Cable Stay Bridge) Km From 32.800 To 38.800 Old Alignment & Viaduct-1 Ch: -000+257 to 1+097 (total length Approx. 840m). and Cable Stay Start Ch: - 2+970 to 3+440 End Total Length (650m approx. Both Side) New Alignment (Khandala & Lonavla Bypass) Total km 8 km Khalapur tool plaza to Lonala (Transfer from Nagpur Metro Project Sep 2018)

Survey Engineer: Construction for, Nagpur Metro (Viaduct project) Km From 7.900 To 18.230 Total km 10.360 Sitabudi Junction to Lokmanya Nagar (Transfer from Kannauj Project Nov 2016

Survey Engineer: Construction for, Agra Lucknow Expressway Six line project Total New Alignment from km 172+500 to km 236+500 Kannauj to Unnao section of Green field Road project in (UP) pkg – 4 Client: UPDA.

(Transfer from Jammu Project Oct 2014)

Abu Saleh

S/o Abu Nasar

Vill+ P.O: Shahpur Baghauni, Distt : Samastipur (Bihar) Pin : 848131 095********,935-***-**** Email- ado53l@r.postjobfree.com,ado53l@r.postjobfree.com

Survey Engineer: Construction for road, tunnel and structure of Widening and strengthening of existing NH 2-lane to 4-lane from km 09+000 to km 65+000 Jammu to Udhampur section of NH-1A in J & K phase- III of NHDP on DBFOT Basis pkg – 1 Client : NHAI . Concessionaire: Shapoorji Pallonji Toll way Pvt. Ltd

(Feb 2013 to Oct 2014)

Survey Engineer: Construction supervision for road and structure of up-gradation to paved. Road in Terai Region of Nepal phase -1 (Contract of package No: 05 Client: Ministry of External Affairs. Consultant: RITES. Employer: Vishwa infrastructures & Services PVT. LTD Hyderabad. (Jun 2012 to Feb 2013)

Survey Engineer: Construction supervision for road and structure of Widening and strengthening of existing NH 2-lane to 4-lane from km 118+700 to km 165+000 Jaipur to Deoli section of NH-12 in Rajsthan phase- III of NHDP on DBFOT Basis pkg – 3 Client : NHAI .

Concessionaire: IRB Jaipur Deoli Toll way Pvt.Ltd

Independent consultants AARVEE Associates. Employer: Stup Consultants Pvt.Ltd

(PMC). (March 2011 to june-2012)

Surveyor- Construction of Ship repair yard & Dry Dock complex at DUQM Port in Sultanate of

OMAN. Client: Oman Dry-Dock Company Consultant : Daewoo Ship Building & Marine Pvt.Ltd. Employer: Daewoo E & C PVT LTD. (Korea) (Nov 2009 to Nov 2010)

Sr GIS Engineer-Construction and Topographical survey & supervision of Sewerage, Water supply system & water drainage, water treatment plant in Amritsar city. Client PWSSB Employer: RMSI Software & Tokyo Engineer consultants Pvt.Ltd (JV) Nodia. (Aug 2008 - Feb 2009)

(1) Chief Surveyor- Conducting Detailed Topographical survey and Center line fixing of km 108 proposed railway line between Pabli Khas to Tapri Junction. Section-11 in the state of Uttar Pradesh. Client: Rites. Employer: A&M Enterprises.

(2) Chief Surveyor- Monitoring of settlement survey of Delhi Metro. Client: DMRC. Contractor: CEC – Soma (JV) Employer: A&M Enterprises.

(3) Chief Surveyor- Conducting Detailed Topographical survey of PMGSY in the Dist of Samastipur Package I & II State Of Bihar. Client: IL&FS. Employer: A&M Enterprises. (April 2007 to Aug 2008)

Abu Saleh

S/o Abu Nasar

Vill+ P.O : Shahpur Baghauni, Distt : Samastipur (Bihar) Pin : 848131 095********,935-***-**** Email- ado53l@r.postjobfree.com,ado53l@r.postjobfree.com

(1) Surveyor & Site In charge- Conducting Detailed Topographical survey and Center line fixing of km 100 proposed canal connecting Godavari river & various ponds in the state of Andhra Pradesh. Client: Wapcos. Employer: Zoma Engineers.

(2) Surveyor & Site In charge- Conducting Detailed Topographical survey 152 km proposed 4 line Nagour to Pali section NH-65 in the state of Rajasthan. Client: CES. Employer: Zoma Engineers.

(3) Surveyor & Site In charge- Conducting Detailed Topographical survey 72 km for widening Almora to Bagheswer section NH-81-A in the State of Uttaranchal. Client: CES. Employer: Zoma Engineers.

(4) Surveyor & Site In charge- Conducting Detailed Topographical survey 32 km for widening Soyalbari to Nathuwakhan section District road in the State of Uttaranchal. Client: CES. Employer: Zoma Engineers.

(5) Surveyor & Site In charge- Conducting Detailed Topographical survey 155 km for widening Masoori to Maletha section in the State of Uttaranchal. Client: Smec. Employer: Zoma Engineers.

(6) Surveyor & Site In charge- Conducting detailed Topographical survey 43 km for proposed 4 line of Ankhleswer to Surat section NH-8 in the State of Gujrat. Client: Stup. Employer: Zoma Engineers.

(7) Surveyor & Site In charge- Conducting detailed Topographical survey 145 km for proposed 4 line of Barely to Sitapur section NH-24 in the State of Uttarpradesh. Client: Stup. Employer: Zoma Engineers.

(8) Surveyor & Site In charge- Conducting detailed Topographical survey 205 km for proposed Railway Line Section 10 & 11 in the State of Rajasthan. Client: Rites. Employer: Zoma Engineers.

(9) Surveyor & Site In charge- Conducting detailed Topographical survey and Centerline fixing 40 km for proposed 4 line of Dharbhanga to Jhanjharpur section NH-57 in the State of Bihar. Client: Scotwillson. Employer: Zoma Engineers.

(10) Surveyor & Site In charge- Conducting Topographical survey 45 km proposed 4 lines Baruni to Bagusrae section NH-31 in the state of Bihar. Client: Craft. Employer: Zoma Engineers.

(11) Surveyor & Site In charge- Conducting detailed Topographical survey 89 km for proposed 4 line Muzaffarpur to Sonbarsa section NH-77 in the State of Bihar. Client: S.A.S. Infrastructure Employer: Zoma Engineers.

(11) Surveyor & Site In charge- Conducting detailed Topographical survey 164 km for proposed Border fencing road (INDO-PAK) Border.Bhuj in the State of Gujrat. Client: N.B.C.C Employer: Zoma Engineers.

Education: Engineering (Civil) from M.H.Saboo Sidik Polytechnic. Training: NIIT training on use of computers for professionals: MS Office, AutoCAD, and MS Projects Employment Record: -

Abu Saleh

S/o Abu Nasar

Vill+ P.O : Shahpur Baghauni, Distt : Samastipur (Bihar) Pin : 848131 095********,935-***-**** Email- ado53l@r.postjobfree.com,ado53l@r.postjobfree.com From Jun 2013: To till date

Employer

Position held

: Afcons Infrastructures Ltd.

: Sr Survey Engineer

Description of Duties: Preparation of detailed project report and construction supervision for road and bridge work.

Construction & survey supervision TBM, Travers and all layer level checking embankment, sub grade, granule sub base, WMM, DBM, BM, Kerb and Layout of culverts and Bridge. Overall duties, supervise of survey team and Survey activities, etc. coordination with other civil administration department as and when required.

From Feb 2013 : To till date

Employer : Afcons Infrastructure Ltd.

Position held : Sr Survey Engineer

Description of Duties: Preparation of survey data and construction supervision for road and bridge work.

Survey supervision TBM, Centerline layout all layer level checking like embankment, sub grade, granule sub base, WMM, DBM, BC and foundation of culverts and Bridge. And co-ordinate with contractor & client. From Dec 2011 : To Feb 2013

Employer : Vishwa Infrastructure & Service Pvt. Ltd. Position held : Survey Engineer

Description of Duties: Preparation of survey data and construction supervision for road and bridge work.

Survey supervision TBM, Centreline layout all layer level checking like embankment, sub grade, granule sub base, WMM, DBM, BC and foundation of culverts and Bridge. And co-ordinate with contractor & client. From March 2011 : To June 2012

Employer : Stup Consultants Pvt. Ltd.

Position held : Survey Engineer

Description of Duties: Preparation of PCC data and construction supervision for road and bridge work.

Survey supervision TBM, Centerline layout all layer level checking like embankment, sub grade, granule sub base, WMM, DBM, BC and foundation of culverts and Bridge. And co-ordinate with contractor & client. From Nov 2009 to Nov 2010.

Employer

:

Daewoo E & C. (OMAN)

Position held

: Surveyor

Description of Duties: Survey work

Travers, TBM, Layout for crane foundation, layout for block fixing layout for utility trench and all survey work. And co-ordinate With contractor & client.

From August 2008 To Feb 2009

Employer : RMSI Software

Position held : Sr GIS Engineer

Abu Saleh

S/o Abu Nasar

Vill+ P.O: Shahpur Baghauni, Distt : Samastipur (Bihar) Pin : 848131 095********,935-***-**** Email- ado53l@r.postjobfree.com,ado53l@r.postjobfree.com Description of Duties: Survey supervision.

Duties included supervision of all works related to survey. Like topographical survey, level, tbm centerline, checking. and co-ordinate with contractor and client. From April 2007 To August 2008

Employer

: A&M Enterprises New Delhi.

Position held

: Chief Surveyors

Description of Duties: Topographical Survey, TMB fixing, centreline fixing counter survey railway highway hydro & thermal power project for Detailed project report and also involved road, foot over bridge, underpass Client: PWD, CPWD, Rites & NHAI. LANGUAGES SPEAKING READING WRITING

English Bigner Excellent Excellent

Hindi Fluent Excellent Excellent

Urdu Fluent Excellent Excellent

Passport Datelied

Passport No Date Of Issue Date Of Expiry Place of Issue

R7809450 20/04/2018 19/04/2028 Nagpur

Notice period – 30 days

Current ctc - 946704 Lac /Annam

Expected ctc - negotiable

UNDERTAKING

I, the undersigned, certify that to the best of my knowledge and belief these data correctly. Abu Saleh

(Signature )

Place :

Date:



Contact this candidate