Post Job Free

Resume

Sign in

Civil Engineer Hydro Power

Location:
Dubai, United Arab Emirates
Posted:
October 14, 2021

Contact this candidate

Resume:

ADEEL AHMAD

MOBILE

+966*********

EMAIL

ado1c9@r.postjobfree.com

GENDER

Male

DATE OF BIRTH

**- ***-****

NATIONALITY

Pakistani

Driving licence

Yes

Marital Status

Married

ADRESS

Nowshehrakakayzain p/o same tehsil pasrur Dist. Sialkot Pakistan.

ADEEL AHMAD

MOBILE

+966*********

EMAIL

ado1c9@r.postjobfree.com

CIVIL ENGINEER

CAREER SUMMARY

Seeking the position of civil engineer with an established construction firm where I can explore my knowledge and skills while working towards civil engineering projects. To contribute to the success of projects using my skills in project management, site surveys and structural engineering.

EDUCATION

Bachelor of Science in Civil Technology Engineering

With 2.94 CGPA

(Aug 2010-Mar 2014) The University of Lahore, PAKISTAN

High School Certificate, DAE CIVIL (AUG2006-JUN2009)

(Govt. Polytechnicaly Institute Sialkot)

PUNJAB BOARD OF TECHNICAL EDUCATION

Matriculation,(JUN2006)

(Private of Science Klasswala)

Gujranwala Education Board

SAUDI COUNCIL OF ENGINEERING MEMBERSHIP NO: 343073

PROFESSIONAL EXPERIENCE

AL-HANOUF GROUP CONTRACTING (SAUDI ARABIA)

CIVIL ENGINEER

FROM OCT 2016 TO PRESENT

PROJECT MANAGEMENT:

Royal commission for Jubail and Yanbu

PHC JEDDAH

JABAL AL REHMA HOSPITAL

MUHAMMAD BIN NAIFCARE CENTER DAHBAN JEDDAH

MINA AL-WADI HOSPITA MAKKAH

MAINTENENCE PROJECT

Duties and Responsibilities

Maintenance job and duties fluctuate depending on the size and function of the facility for which they work.

Typically they oversee the installation, repair and upkeep of an employer’s property including machines, mechanical systems, buildings and other structure.”

Responsible for the preparation of the construction schedule depending on his or her position in the project.

Total maintenance the building repair, joints, and new construct room are also including.

Maintenance are also mechanical work, electrical work, and electronic work which the most important of maintaining.

Working on the most innovative technology of the century “Ultra High Performance Concrete”.

Design and Analysis of buildings manufacture with “Ultra High Performance Concrete”.

The engineer needs to firstly prepare the blueprints of the most functional and cost effective design.

Responsible for estimating the entire building project or a part of the building as required.

It is necessary to make the effective communication with the contractors regarding the construction work.

Following the orders of the chief engineer and works under the supervision.

It will be the responsibility to ensure the safety standards of the building and the design is strong and durable.

Responsible for ensuring the government standards in the design, including materials used and structural elements.

It is needed to generate the three-dimensional computer models to test the efficiency.

Responsible for the preparation of the construction schedule depending on his or her position in the project.

It is also needed to visit the construction site timely and may have to shift place of residence during construction phase and other situations.

PROVINCIAL PUNJAB HIGHWAY DEPTARTMENT GUJRANWALA

(PAKISTAN)

(Civil Engineer)

From FEB 2013 To JUNE 2014

Project: Flyover at Aziz Cross G.T Gujranwala

Duties and Responsibilities

The prime responsibility is to do the survey of the site of construction to access the suitability.

It is needed to design the various bridge components by keeping all the factors in the mind such as keeping with expected soil strength.

Design and Analysis of bridge manufacture with “Ultra High Performance Concrete”.

Responsible for estimating the entire bridge project or a part of the bridge as required.

It is necessary to make the effective communication with the contractors regarding the construction work.

Following the orders of the chief engineer and works under the supervision.

It will be the responsibility to ensure the safety standards of the building and the design is strong and durable.

Responsible for ensuring the government standards in the design, including materials used and structural elements.

STATE LIFE INSURANCE EMPLOYEES CO-OPERATIVE HOUSING SOCIETY LTD.(Pakistan)

(Civil Engineer)

From 15 OCT 2011 to 20 DEC 2013

Project: To construct housing residency building a DHA phase 5 Lahore, Pakistan.

Duties and Responsibilities

According to co-operative housing society –here is the list of rule and responsibilites of co-operative housing society managing committee.

Putting the board of displaying name of society full adresswith registered survey no,andresgistration no near the main gate of society which could be seen easily.

To raise funds for the society.

Checking of Layout and levels according to the drawing.

Execution,monitoring and controlling

Preparation and casting of all beam and columns according to the drawing and specified by the consultant.

To make agreement as necessary on behalf of the society.

To take necessary action for keeping the property of the society of order.

To give approval for change in utilization on flat.

To submit society,s record for audit.

Quantity Estimation

Supervise the work of sub-contractors and work closely with other site operations staff to meet the project schedule.

Following all the rules and regulation, requirement of clients and instruction from consultant and architect.

A construction project manager sets up the estimates the budgets and the construction timetable for the clients and develops the construction strategy.

SKB ENGINEERING AND CONSTRUCTION,

(Pakistan)

(Civil Engineer)

From 06 FEB 2010 to 20 AUG 2010

Project: Road work DHA phase 6 Lahore, Pakistan.

Duties and Responsibilities

The site engineer is the person who spends most of his time at the construction site compare with other managers or designers.

Preparation of the existing base course layer. The existing surface is prepared by removing the pot holes.

Quality control of bituminous concrete construction.

Finished surface. Rolling

Performed road side tree planting and removal as necessary.

Provided assistance to road specialist and experts as require.

Position and moved road signs and barriers as needed.

Operated heavy machinery and road work equipment on a regular basis.

Oversaw a variety of road work tasks and operation.

Internship & Projects

1.Final Year Project on Dam

Final Year (Duration 1 Year)

University Of Lahore, Pakistan.

Case Study of NeelumJehlum Hydro Power Project and its conflicts with Kishan Ganga Dam.

COMPUTER SKILLS

Microsoft Office

Microsoft Project

Primavera P6

Proficient with MS Word, Excel, and PowerPoint

LANGUAGES

Read

Write

Speak

English

Excellent

Excellent

Excellent

Urdu/Hindi

Excellent

Excellent

Excellent

SAUDI ARABIA

-

-

GOOD

REFERENCE

Will be provided on demand.



Contact this candidate