COVERING LETTER

To,

The HR Manager,

Sub: Application applying for the post of Human Factors Engineer.

Respected Sir,

I have professionally qualified and with 15+years of EPC, EPMC, Management Experience designated as a Project Management /Construction Pipeline / piping Engineer/ Schedule planner / material controller in Oil & Gas Sectors onshore, Oil Fields, Brown fields Services & FPSO Sectors in a progressive and professionally managed organizations in India, Asia & Middle East, with safe manner HSE standards followed.

I worked with EPC (MNC) Company, with leading MNC Clients. Qualified with a proven track record of achievement in team to successfully deliver projects throughout the local and international Oil & Natural Gas industry. Discipline project management experience exposure to potential risk events including the establishment of risk register and initiation of corrective action when required.

I understand that your organization is looking to close a senior position in Management / construction, and I am keen to take up this position.

Once selected, I would be able to join the new assignment within a month.

Looking forward with keen interest to receive your favorable reply, for which I would avail this opportunity to serve and build my career in the field of oil and gas industry and put my efforts and work to the utmost satisfaction of my superiors.

My updated CV is enclosed.

Thanks, in anticipation of an early feedback and with regards,

B.A.Sunil Kumar,

Visakhapatnam.

CURRUCULAM VITAE

Name: Sunil Kumar Bandhanadam,

Experience: 15 Years in Oil & Gas Sector. B.Tech, MechanicalEngineer.

Mobile:+917*********,

E-mail: adnyfy@r.postjobfree.com

Objective: Team of committed professional delivering customer service my professional & management qualifications with experience. Skills, managing, developing and motivating teams to achieve their objectives with HSE safe manner. Able to handle individual responsibility use own initiative to achieve company’s objectives.

Professional Experience in India, Asia & Middle East > 15 years’.

SLNO

ORGANIZATION

POSITION HELD

Projects Handled

Duration

1

KUWAIT OIL COMPANY (KOC) Kuwait, (Working as a seconded Employee).

PMT as a Construction Professional.

Major EPC Projects Handled in Gathering Centre

Aug 2016 to September2020

2

M/s INTERSERVE TOCO (The Oman Construction company) LLC, OMAN.

Project Engineer.

Flow lines & Major Projects GC’s

Feb 2014 to May2016

3

M/s WOOD GROUP KENNY INDIA PVT, LTD, New Delhi, INDIA.

PMC as a Sr. Engineer.

Projects (Cross country P/L, Steel P/L, CNG, Skids)

Sept 2009 to Jan 2014

4

M/s J.RAY MCDERMOTT INC, DUBAI.

Pipeline Production Engineer

EPCM Contractor Offshore Subsea P/L & Structures

Jan2008 to Dec 2008

5

M/s K.C.C. (KUWAIT CONTROLS COMPANY) LLC., KUWAIT

Const Engineer

EPC Contractor P/L Projects

Jan 2007 to Dec 2007

6

M/s N.B.TC. TRADING & CONTRACTING LLC., KUWAIT

Const Engineer

Refinery Piping & Oil Fields in Tanks Exp

June 2006 to Nov 2006

7

M/s ALPINE ENGG SVCS (A SUBISADARY GROUP OF KEPPEL SHIPYARD LTD) SINGAPORE

Piping Supervisor

EPC Contractor FPSO Projects

June 2005 to March 2006

8

M/s Shiridi steel Fabricatorworks

Visakhapatnam, A.P. INDIA.

Trainee Piping engineer

Ship Building Works for Sub marine Piping, Hull Sections installation

Jun 2004 to May 2005

Membership Details:

Kuwait Society of Engineers, Kuwait approved as a Mechanical Engineer.

No# 35978

Since August 2018 to Valid Till Dec 2022

GCC Driving License: Available

Valid upto Apr-2023.

NDT Level 2 Qualification Certificate Available.

Valid

B.Tech Mechanical Engineer

KSRM College of Engineering, Kadapa

Affliated to Sri Venkateswara University Tirupati,AP.

Experience History Details:

1. Organization: M/s Kuwait Oil Company (KOC), Kuwait, Secondment through M/s Alghanim International Oil & Gas Division, Kuwait. Position Held: Const.Professional

Duration: From Aug 2016 to September2020

Projects: Installation of New Desalter Train Projects S&EK Kuwait, at Four GC’s SS Tanks, Pipeline Projects, Flaoting roof, fixed roof tankconst. installation and Installation of Multipoint Smokeless HP Flare in 14No’s of Gathering Center’s South & East Kuwait GC’s

Roles & Responsibilities:

Working as a Project Management Team role, Planning, Having Shutdown experience Gathering centers., Study, Execute, Monitor, Supervision of works, permits, Quantity surveying parameters, RA billing reviewing HSE compliance to ensure guidance to Company.

Review vendor documentation within the discipline and from other disciplines for compliance with project requirements and discrepancy resolution.

Develop Plans for execution of Construction, manpower mobilization, upto Pre-commissioning, Commissioning and startup of the project.

Able to prepare mobilization of Sub contractor activities, Clients attending meeting, check for DPR reports, plan to execute site activities priority wise and aim to no idle for crew develop methods immediate swap the manpower to other activities.

Prepare and Update Scope of works, material procurementfor over all project as per clause in the contract.

Familiar with “permit to work” systems, isolation procedures with brown filed activities and safety management systems.

Ensure that testing of all mechanical Equipment, pipelines etc, to be completed.

Planning, Execute ensure that Pre-commissioning, hookup & Commissioning and startup in field mechanical completion works performed as per project schedule, budget, with quality and safety requirements.

Coordinate function test, commissioning activities with support from relevant discipline engineers and site personnel.

Manage site generated technical queries with the design authority. Manage commissioning Q&A documentation on site. Manage commissioning drawings on site from inspection to handover. Coordination with the construction teams, planning of detailed Pre-Commissioning & Commissioning execution plan by system/ subsystems/ durations/ Manpower requirements/ vendor services & hand-over from Construction to Commissioning team.

Supervises and coordinates commissioning activities provide input as required ensuring that commissioning activities are completed as per schedule, ensuring that inter-discipline checks are performed by the commissioning team, coordination of all onsite vendors, ensuring that temporary utilities, tools, spare parts and consumables are available during the integration and commissioning execution phases.

2. Organization: M/s Interserve TOCO (The Oman Construction Company LLC), OMAN.

Position Held: Project Engineer, Duration: From Feb 2014 to May 2016

Client: PDO-OXY (Occidental in Corporation) Oil Field SVCS at Safah & Wadilatham Projects –OMAN North Facilities: Projects: Pipeline and Plant Piping Off Plot / on plot Oil Field Service Projects

Role Description:

Pre- approvals of Pricing DWGS receiving from Client, Involved survey, marking, laying installation of new flow lines such as ESP, PCP, DSS, Water / steam injection, Gas Lift, Wet gas, Natural Gas wells Water Source Wells as well as Pipelines for CRW lines.. Material coordination stock, inventory follow up, with materials management.

After receiving of work instruction, site visit / survey and mark the scope of work limits and plan to mobilize the resources.

Review weekly & monthly reports of package assigned, escalate issues and drive corrective actions

Daily / Weekly / Monthly MOM’s conducted with Clients / Construction Team.

3. Organization: M/s Wood Group Kenny India Pvt Ltd, New Delhi

Position Held: Sr. Engineer Construction / Acting RCM

Duration: From May 2009 to Jan2014, Client: M/s GGL, GAIL, MNGL (Maharashtra Natural Gas Limited) – (A joint Venture of GAIL & BPCL) Pune / Kota City.

Project: for Steel Pipeline Laying and Associated works:

Role Description:

Preparation and submit to PMC Pipeline Survey, routing, crossings, new CNG stations construction, downstream laying of steel pipeline 12”, 10”,8”,4” & 2” connectivity to industrial, domestic (MDPE line)operations in City Gas Distribution projects.

As per PNGRB guidelines according to contract Methods and procedures study and approval given to contractor.

Site DPR, material status, 4week look head plan, weekly MOM preparation and submit to client and PMC Project Engineer.

In Site any conflict technically decision make and inform to client proceed further action.

Site progress reports, inspection witness for WQT, WPS verification, material inspection, Hydro testing reports, all pipe line laying inspection activities (trenching, welding, NDT, coating, laying, reports witnessed, CP survey, installation, valve testing inspec

Vendor inspection for rotating equipment CNG station compressor, Dispenser connections (High, Medium, Low SS tubing lines) inlet and outlet verified and executed quantities.

All railway, Road, river, canal, Nala crossings by HDD or open cut methods & procedure approval and liaising to higher authorities for approval follow-up to contractor.

Execution quantity reports verified, contractor RA bill verification, approval further to submit client.

Preparation of letters to contractor, MOM for project and maintain projects life to active with highly HSE standards.

4. Organization: M/s J. Ray McDermott International LLC, Middle East Company, Dubai.

Position held: Pipeline Production Engineer, Duration: From Dec 2007 to Nov 2008

Qatar Gas 3&4 Pipe lines & cables offshore facilities Project:

PROJECT: CONSTRUCTION / ERECTION OF WH -7, WH-8, WH-9 PIPELINES FOR 38” / 22” RISERS & EXPANSION SPOOL LINES AND PL-9-7 & PL9-8 22” SUB SEA Pipelines VALVE SKID /TIE-INS / PIPELINES AND RELATED OFFSHORE STRUCTURES.: Develop and ensure safety conditions with respect to Project, Trackers, Topsides platform process piping, with brown field activities. Monitor and supervision Pre-commissioning & Commissioning and start up activities at Able to manage time and work under pressure to tight deadlines. Also lead a team and work on own initiative, and within a team environment with Self-motivated and able to motivate others. After completion of works ensuring Ensures safe execution of all Commissioning/ Maintenance activities as per PTW procedures, Hot & Cold work permit, Confined space entry permit are duly applied and job instructions complied with potential hazards addressed immediately, making sure of the Lockout Tagout (LOTO) procedures.

5. Organization: M/s Kuwait Controls LLC, Kuwait, Position Held: Site Engineer Duration: From March 2007 to Dec 2007,Client: Ministry of Energy Kuwait

PROJECT : LAYING of 58 KM for 48” CS PIPE LINE (CROSS COUNTRY):

Role Description: Worked as a Site Engineer. Involved in Fabrication, Laying of pipeline, Arranging Heavy equipment and machinery & man power. Preparation of daily reports, pre-planning of scheduled work, informing subcontractor for excavation work, tie-ins hydro testing etc. Daily Production Report to Project Manager.

6. Organization: M/s NBTC LLC, Kuwait, Position Held: Site Pipeline Field Engineer (For shutdown Projects)

Duration: From May 2006 to November 2006

Client: KOC (Kuwait Oil Company) / PMC Flour International.

PROJECT: ENHANCEMENT OF CRUDE EXPORT FACILITIES.

Responsibilities: Fabrication & Installation of 8 storage tanks. Worked as a Site engineer. Work involved Structural and pipeline activities. Responsibilities include drawing study, MTO Preparation, Structural inspections for tankages follow up, material traceability, welding inspection, NDT, galvanizing inspection, job execution, erection and Installation, shop & site inspection reports on day to day basis prepared and report to Project Manager.

7. Organization: M/s Alpine Engineering SVCS, of sister concern Group of Keppel Shipyard Tuas, Singapore.

Position Held: Piping Supervisor, Duration: From May 2005 to March 2006

Project: FPSO CAPIXABA (Floating Production Storage and Offloading) PROJECT, Client: SBM offshore company Australia.

Role Description:

Conversion of Vessel FSO to FPSO, it’s one of the world’s largest project in Offshore and Marine facilities. Vessel includes 34 pipeline systems required on main deck. Each system having a unique line number, system code, class etc., information mentioned. Follow up RT, MPI of various systems, using SBM (Single Buyer Moorings) standards and procedures

8. Organization: M/s Shri Shiridi steel Fabricator works: Position Held: Trainee QA/QC Engineer

Duration: From May 2004 to April 2005,

Role Description: Review Isometric drawings, QA QC activities involved and follow up offered inspection works, welding, fitup, pipe book summary reports prepared day to day fab status informed to Sr. Engineer.

PERSONAL DETAILS

Language proficiency: English, Hindi, Telugu &Tamil.

Notice Period : 7days.

DECLARATION:

I hereby declare that the information given is true to the best of my knowledge and belief, and that any testimonials, documents and appendices that are submitted with this personal data sheet are true and genuine, given and signed by the persons whose name appear on them.

With Regards,

(B.A.Sunil Kumar)



Contact this candidate