Post Job Free

Resume

Sign in

Saudi Aramco Technical Coordinator

Location:
New Delhi, Delhi, India
Posted:
July 29, 2021

Contact this candidate

Resume:

CURRICULAM VITA

SAIBAL CHOWDHURY

ELECTRICAL & MECHANICAL ENGINEERING (Combined Diploma 04 Years Equivalent to Bachelor of Engineering) From W.BENGAL – INDIA in 1980 to 1984 –( 1st Class )

Email – adnx8a@r.postjobfree.com ( Personal )

Phone : + 91 - 990-***-**** / 898*******

Objective

>Leverage my experience and expertise to excel as an Electro – Mechanical Engineer, Project Management Professional ( PMP ) in a reputed company.

Experience at a Glance: 31 years as an Electro – Mechanical Engineer with world class companies in Project Engineering to Commissioning & Maintenance in Tyre Industries, Continuous Casting, Cable Industries, Hydraulic Engineering, Carbon Composite Engineering, Metro Railway, Refinery, Power & steel plant, Primary Substation, Estimation contract dealing & EPC contract Dealing. > Credentials: At present working with “Consultant Professional Associate ( Project Development Business )

> Competency: In the area of Project Engineering, Erection, Commissioning and Maintenance, EPC Contract execution, client dealing, Material management, R.A Measurement &Billing.

Date of Birth: 27th June 1960. Material Status: Married.

Permanent Address – 25 B Anath Nath Deb Lane, Kolkata - 700037 W. Bengal - India .

Passport & Visa Detail : No – N8004682 ( Valid – 11/04/2026 ) Visa I.D .Card No -260******** ( Work Visa ) Canceled : 11/10/2012 ( State of Qatar )

EDUCATIONAL QUALIFICATION : Diploma in Mechanical & Electrical Engineering (Combined- 04 Years ). PROFESSIONAL AFFILATION: West Bengal Engineering Council – India.

Present CTC – 19,50,000.00 INR Per Ann am. Expected CTC : Negotiable in $ or INR.

Major activity during project Engineering, Execution and Start up

# Basic and detail Engineering, preparation of field design and area classification. # Review of specification with respect standard. # Equipment selection and sizing via cable, Transformer, Switch gear, Relay control panel, Battery & Charger, Light fittings. # Selection of different class of protection of equipments. # Planning budgeting and project control. # Bid evolution and procurement processing. # Preparing work instruction, method statement, Job safety analysis, Work progress bar chart. # Documentation of MIS ( Management information system ) # Co ordination with supply chain material handling, inspection at site & spares evaluation/inventory. # Preparation of plant – Substation start up and handing over documents.

Major activity during Plant Maintenance/Shut down

# Preventive, predictive, shut down and routine maintenance. # Follow PTW rules, lock out and tagging procedure. # Plant failure analysis.# Trouble shooting and root cause analysis. # Condition monitoring. # Maintenance budget monitoring & planning through package. #Organization recourses manpower, tools, materials, consumable control. #Maintain ISO – 9001/9002/14000 Documentation. # Spare parts review, Maintain Equipment history card accordingly preparation of PR/PO.

TRAINING ATTENDED

@ Attended completed Zero down time maintenance Hydraulics – L&T/ USA. @ Attended safety leadership training. @ Attended project management training from “EVANS” USA. @ Completed HUET course from NAPT Qatar. @ Completed H2S & BA Course from NAPT Qatar. @ Completed basic first aid course from NAPT. @ Completed H2S & BA Course from Qatar Gas. @ Completed Theories of Constraints – Project management –USA.

KEY EXPERIENCE ( Electrical Projects ) Sub station Project, Refinery & General Process Plant Project – To look after and techno commercial co ordination of new project complete installation and commissioning of 400 KV/220 KV/132KV/66/11KV Substation equipments like Transformer 275MVA to different stage 60/40up to 2MVA, Bus duct, Switch gear, Gas Insulated switch gear( G.I.S ) 220/132/66/11 KV, PCC,MCC,PMCC, Modification of switch gear & Relay control panel, Battery & Battery charger 110/48 V, HT & LT / Control Cabling, Termination, Straight through & End Termination in hot shrink & cold shrink jointing, DCS control wiring, HV/LV motor termination, Ear thing with copper flat & Lead sheathed /Y.G cable, Lightening arrestor, LDB,PDB, High mast, Area lighting, Street lighting, Fabricated structure with complete supply, erection, commissioning, Maintain of all kind of client dealing, Measurement & Billing, Supporting document control of QA/QC/HSE/ISO – 9001/9002/14001/OHSAS – 18001, MIS of ASME & NBBI, Maintain documentation of Method statement, Commissioning & Handing over report, Deal with equipment & spare supplier, Contract management for all scheduling program me set up, implementation, target review, reconciliation and final handing over along with mob/demobing closing out.

KEY EXPERIENCE ( Mechanical Projects & Maintenance ) Supervision of Installation Commissioning & Maintenance of Process Industries. Tyre Plant : Banbary ( Rubber mixing m/c) Duel & Multiple & Tuber Extruder, Fabric dipping unit, Tyre building m/c ( Pneumatic drum collapsing type ) Calendaring, Curing hot press. Continuous Casting Aluminum Sheet plant : 24/20 Ton Melting & Holding Furnace, Continuous casting machine, Cold rolling mill ( Reversible & Non reversible ) Centre Sleeting m/c, E.OT Crane 35/20/10/5 Ton, Air compressor 500/300/100 CFM, D.G Set 1150/500/325/150/100 KVA, Hydraulic Rigs, Centrifugal/Rotary gear/Plunger & Pneumatic pumps, Oil /water Hi pressure pipe line complete with erection commissioning preventive & shut down maintenance & modification. Power Cable & Jelly filling Telephone Cable Plant : Wire drawing cold processing machine( Rod B.D m/c ) Wire drawing and insulation ( Tandem line ) Group twining m/c, Drum twisting m/c, Jelly filling & seething m/c, Armoring m/c, with complete plant and machinery utilities like D.G Set/Air compressor, Air dryer, Chilling plant, Centrally control air blower, Hot & Cold well with cooling tower/ softener plant, Fire fighting pump with necessary pipe line.

Process Machinery’s : Turning Lathe,Milling,Shaping,Drilling Retro feed & auto control, Profile cutting & Welding fixture, Hydraulic Cylinder testing rigs, Hydro mould casting & Slitting, Bonding machinery related Electro/Mechanical maintenance.

MIS : - Familiar with modern mechanized methods of structural fabrication & erection, mechanical erection, piping & commissioning. Expertise in striking cross-functional coordination and achieving operational synergies to achieve project execution within defined time/cost schedules and as per the defined standards. Expertise in Project Planning, Scheduling, Monitoring, Cost Control & adequate knowledge in Resource planning, deployment of materials, Personnel and equipment. Interpersonal skills and expertise in co-ordination between client and contractor for construction activities.

PARTICULER EXPERTISE & PROFESSIONAL EXPERIENCE

01.12.2013 –Consultant Professional Associate ( Project Development Business )

To take sole responsibility in project business development in the field of Refinery/ Power Plant / HT & LT Electrical distribution of Erection, Testing Commissioning / Materials Management / Target monitor/ Job plans / Technical measurement & Invoice processing.

Britannia Industries Ltd ( Perendurai, Tamilnadu) : 280 ft Thermic Fluid Backing oven Erection, Testing, Commissioning along with all Thermic fluid pipe line, Exhaust & all Motor Drives.

RIL Jamnagar. Gujarat ( 3rd Plant) – Power distribution in Refinery area including High mast & Explosion proof lighting.

HAKA Group – Feliz Global Consulting – Saudi Aramco (Kingdom Football Stadium Project) Saudi Arabia – 10 Nos Football Stadium Lighting Distribution Design from incoming power source 11 KV SWG After that 0.433 KV to Input in LDB & Synchronizing in Power failure DG Supply. Job Scope as Below.( As sole Early Contract)

Have worked at a power control center as a dispatching engineer with familiarity with the economic dispatching of generation units.

• Have a strong background in power system dynamics with focus on performing grid studies including short circuit, load flow, motor starting and stability studies.

• Develop, maintain and implement power systems contingency plans addressing Saudi Aramco critical facilities by defining critical load, single line diagrams, and what-if scenarios to restore power in case of a partial or complete loss of power.

• Participate in the investigation and review of power system major disturbances in coordination with the POD Division, Power System Engineering Department and utility company (national grid or SEC distribution).

• Perform grid dynamic simulation prior to outages identifying what-if scenarios.

• Develop black start and grid restoration procedures.

• Participate in special power system reliability studies by identifying single point of failures in power systems, operations obstacles and repetitive failures, and develop monthly reliability reports that include KPIs.

• Dispatch and balance between generation and demand in the areas through an economic dispatch model.

01/11/2012 - 30/11/2013 Bhushan Steel Limited, Orissa - Angool: Assistant General Manager ( Projects ) BFPP - II

To take sole responsibility of 155 MW Power plant related Steam Turbine, Air Blower, 275 Ton Steam Boiler all equipments power supply from Substation complete erection, Pre commissioning handing over of 33/6.6 KV, Protection system, 33 & 6.6 KV SWG, 220/33/ 6.6 KV,275/63/32/40 MVA ONAN/ONAF Transformer, 2.500 KVA Auxelary Transformer, 220 KV G.I.S, 6.6KV Switch gear, Relay control panel 33/6.6 KV, RTCC & Battery & Charger 110/48V, Telecom & GPRS clock fiber optical cabling, LVAC/DCDB/UPS, HT/LT 33 / 6.6 KV & Control cabling & Termination, All scheme & loop checking sequence operation manual & remote, Official co ordination with consultant client & inspection of ABB/SIEMENS/L&T/ L&T Construction for Techno commercial dealing, Supply chain maintain along with site delivery as well as drawing design modification as jointly suggested, Maintain all Running account billing % of progress & Additional work and internal estimation of extra works.

29/11/2006 To 12/10/2012 – Qatar Engineering and Construction Company W.LL Doha – Qatar Engineer ( Electrical Testing ) /Site Manager / Project Manager ( Electrical )

As Project Manager in Rayan Village Substation Project 400/220/66/11 KV(ABB – LLC Qatar ): To take sole responsibility of 05 nos Substation complete/partly erection, Pre commissioning handing over of 400 KV 150 MVAr Shunt reactor,400 KV GIS, Protection system, 220 KV SWG,220 KV 60 MVAr Shunt reactor, 220/66 KV,32/40 MVA ONAN/ONAF Transformer, 1600/1000/500 KVA Earthing Transformer, 66/11 KV G.I.S, 11KV Switch gear, Relay control panel66/11KV, RTCC & Fire protection SERJI panel, Battery & Charger 110/48V, Telecom & GPRS clock fiber optical cabling, LVAC/DCDB/UPS, HT/LT 11KV & Control cabling & Termination, All scheme & loop checking sequence operation manual & remote, Official co ordination with consultant client & inspection of ABB/KHARAMMA for Techno commercial dealing, Supply chain maintain along with site delivery as well as drawing design modification as jointly suggested, Maintain all Running account billing % of progress & Additional work and internal budgeting with profit balancing.

As Site Manager in Lusail City BV – 1&2 – 66/11 KV Primary Substation ( ABB – LLC & AG – Qatar ) : To take sole responsibility of 02 nos 25 Meter underground Primary Sub station complete erection, testing, commissioning handing over of 32/40 MVA ONAN/ONAF Transformer, 500 KVA Earthing Transformer, 66/11 KV G.I.S, 11KV Switch gear, Relay control panel66/11KV, RTCC & Fire protection SERJI panel, Battery & Charger 110/48V, Telecom & GPRS clock fiber optical cabling, LVAC/DCDB/UPS, HT/LT 11KV & Control cabling & Termination, All scheme & loop checking sequence operation manual & remote, Official co ordination with consultant client & inspection of ABB/KHARAMMA for Techno commercial dealing, Supply chain maintain along with site delivery as well as drawing design modification as jointly suggested, Maintain all Running account billing % of progress & Additional work and internal budgeting with profit balancing.

As Site Manager in Pearl Qatar Island ( EPC - TATA Projects Ltd ) To take sole responsibility of 05 nos Primary Sub station & DCP Power supply complete erection, testing, commissioning handing over of 275MVA/60MVA ONAN/ONAF Transformer, 500 KVA Earthing Transformer, 66/11 KV G.I.S, 11KV Switch gear, Relay control panel66/11KV, RTCC & Fire protection SERJI panel, Battery & Charger 110/48V, Telecom & GPRS clock fiber optical cabling, LVAC/DCDB/UPS, HT/LT 11KV & Control cabling & Termination, All scheme & loop checking sequence operation manual & remote, Official co ordination with consultant client & inspection of KHARAMMA for Techno commercial dealing, Supply chain maintain along with site dale very as well as drawing design modification as jointly suggested, Maintain all Running account billing % of progress & Additional work and internal budgeting with profit balancing.

DCP Plant power supply To take sole responsibility to installation & Commissioning of 60/50MVA – 3 Nos Transformer, 500 KVA Ear thing Transformer along with Relay control and protection panel with control wiring & Termination, 11KV HT Cabling & Termination.

As Technical Coordinator in Qatar General Petroleum ( PS -2 & 3 Off Shore Platform ) Sea water cooling pump modification soft starter for 3.3KV Induction motor 355KW & 600KW, Gem Starter and RMS modification GRP Cable tray & Cable laying, Glanding, Termination all official co ordination with AREVA,ABB & QP regarding materials delivery & shipment arrangement.

As Technical Coordinator in M/S Qatar Liquefied Gas Company Limited – Sea water pump substation Faulty Transformer replacement Project & Modification work :To look after and technical co ordination of S.O.S Basis project complete installation and commissioning of 25 MVA ABB Transformer installation, 33 KV End termination, 6.6 KV Bus duct modification & re fixing. Additional cooling fan arrangement fabrication installation wiring modification of another Transformer. Method statement & Job safety analysis is also in my scope.

15/06/2005 To 15/11/2006 - Reliance Engineering Associates Pvt Ltd,( Refinery Division ) Under– Caliber Services (p) Ltd, Gujarat, India Electrical Engineer ( Construction) # 40 MVA Additional power supply for VMP( Shut Down jobs) >Modification of relay control panel, Change & Reaffixing the supervision relay,BCU,

Rewiring, Electrical Construction, Erection of 2MVA ONAN Transformer – 12 Nos, PCC, MCC, DB old & new one modification of equipments & inside panel, panel wiring, HT & LT Cabling, Control Cabling, Termination, Area lighting, Ear thing system. Construction power supply for surface heating system, Air ducting system, welding machine, Jet water pumping system,

# Value Maximization Project : Co ordination with Contract cell, Field design cell, Quality survey dep't, QA/QC, Field Engineers regarding project mobilization, Material supply chain management, Project Management, Management information system maintaining ( MIS ) Using the package WOMS & General package.SAP Procurement and order follow up.

# Cryogenic Tank Sub station jobs & Township Maintenance : 25 MVA, 2 MVA, ONAN Transformer, HT Switch board 11kv/800A, LT Switch board 415V/2500A, Panel with 1000 kava DG, HT,LT Cabling under ground, Above ground, Battery bank with battery charger, Lighting DBs with lighting fixture, Ear thing system with Treated/Non treated Earth pit cabling & Gi flat, Fabrication of fabricated structure & cable trey complete erection & commissioning.

05/2001-- 06/2005 Nicco Corporation Ltd, Kolkata, W. Bengal, India -Site Engineer ( Construction Division ) # Kolkata Metro Railway : 33KV/11KV Low smoke zero halogen 1c x 185 sqmm cable lying – 28 KM, Cold shrink Sumi tumo straight through jointing, Glanding and Termination work inside the tunnel & sealed duct. Fabricated support work & FRP support work.

# Karnataka State Electricity Board : Sub Station to Sub station 66KV Under ground Cabling, Straight through Jointing & Termination work of HV Cables. #Theri Hydro Electric Development corporation, Uttaranchal, India : Installation and commissioning of MCC,PCC Panel with Lighting DB,HT, LT, Lighting cabling with tubular pole, high mast & fixture complete.

04/1999 – 04/2001 Carbon Composite (India)Ltd. Falta W.Bengal – Maintenance Engineer :To look after the all Electro/Mechanical maintenance activity of composite molding related auto control machineries shut down planning, running break down maintenance.

07/1997 – 04/1999 UT LIMITED ( Formally Usha Telehoist Ltd ) – Maintenance Engineer :To look after the all Electro/Mechanical maintenance activity of Process related auto control machineries, Utility services, Hydraulic testing rigs shut down planning, running break down maintenance.

08/1991-- 07/1997 Nicco Corporation Ltd, Kolkata, W. Bengal, India -Site Engineer ( Cable Division ) # Engineer Maintenance & Projects # PIJF Telecom cable Plant, W.Bengal, India :Erection, Commissioning of Telecom Cable Machinery, Like Wire Drawing, Tandem line, Group Twining, Seething, Armoring, Air Compressor, Air Dryer,PCC,MCC Distribution Sub station, DG sets complete plant & machinery as a “Mechanical Engineer” ( Project/Maintenance ) with DE Angele Italy. After completion of project testing & trail run for final production, as well as day by day Electro- Mechanical break down & shut down maintenance.

1990 - 1991>Usha Beltron Ltd, Ranchi, Bihar, India - Engineer Maintenance/Projects # PIJF Telecom cable Plant : Project co ordination with Nokia Cabmatic & AFA, USA,Erection, Commissioning of Telecom Cable Machinery, Like Wire drawing, Single wire insulation Tandem line, Group Twining, Drum Twisting machine, Cable top Seething and jelly filling, Steel Armoring,500/300 CFM Air Compressor, Air Dryer, 500/340 KVA DG sets, complete plant & machinery set up, After that Electro mechanical Maintenance with Nokia Cabmatic & AFA - USA. After completion of project testing & trail run for final production, as well as day by day Electro- Mechanical break down & shut down maintenance.

1985 -- 1990 Light Metal Industries Ltd, Hoogly, W.Bengal, India "Supervisor" Project/Maintenance"# Project Erection commissioning of Continuous Casting Aluminum Foil Plant with PACHENE France, LOWYE England and WELLMAN India.40 & 20 Ton Melting and Holding oil fired Furnace, Non reversible continuous casting Rolling,Non reversible and reversible cold draw Rolling Mill, Centre Slitting Machine, Annealing Furnace, 500 KVA D G Set with synchronizing, 500 & 300 CFM Air Compressor with air dryer, Fire fighting pump with fire pipe line and fire hydrant port, Hydraulic pump, centrifugal pump, pressure pump with hydraulic pipe line, hydraulic valve stand, oil filter stag unit, Cooling oil pump & pipe line, oil mist spray line. After that all machinery Electro Mechanical Breakdown & Shutdown maintenance. 1984 -- 1985 > J K Industries ltd, Kankroli, Rajasthan, India " Trainee Supervisor " # Tyre & Tubes Manufacturing Plant : Rubber mixing Batch unit Barbary, Double roller mixing mill, Dual / Multiple /Tuber Extruder with cooling conveyor strapping system, Nylon Fabric dipping in latex rubber and fourteen stage drying unit, Tyre building pneumatic drum open close TBM, Band winding & coating, Die type two part curing press steam & hot water, Different Dryer / Pumps Erection Commissioning.

With Regards

SAIBAL CHOWDHURY



Contact this candidate