Post Job Free

Resume

Sign in

Instrument Engineer Power Plant

Location:
Lahore, Punjab, Pakistan
Salary:
5000$
Posted:
July 13, 2021

Contact this candidate

Resume:

MUHAMMAD AYYAZ

*adnpod@r.postjobfree.com

)034*-*******, 030*-******* (051-*******

HNear Humayun General Store, Dhok Mistarian, Morgah, Rawalpindi OBJECTIVE

My aim is to obtain a position in an organization as an E&I Engineer where my skills and abilities will be polished and utilized to enhance the productivity of the organization.

CAREER SUMMARY

A highly decorated professional having a degree of Electronics Engineering with on job professional experience of more than 7 years in Oil & Gas refinery, power plant, Chlor Alkali & Oleo Chemicals sector.

I have the ability to work calmly and diligently in challenging situations, excellent interpersonal skills, professional attitude and a firm personality to manage projects independently and as a team member.

SKILLS & EXPERTISE

TECHNICAL SKILLS

MANAGEMENT SKILLS

SOFTWARE SKILLS

DRAWINGS & DOCUMENTS

DCS TDC-3000,

DCS C-200

DCS C-300

Hollisys

TEAM LEADER

EMPOWERMENT

CONTROL BUILDER

QUICK BUILDER

WEBDISPLAY BUILDER

LOGIC DIAGRAM

ILD, P&ID

WIRING SCHEMETICS

PLC FSC HONEYWELL

PLC SIEMENS S7-400

ALEN BRADLEY1769-L30ER

TEAM PLAYER

PLANNING AND ORGANIZING

RS LOGIX 5000

WICC, Simatic Manager.

Studio 5000

GA DRAWINGS

DATASHEETS

C&E CHARTS

FIELD INSTRUMENTATION

PROACTIVE

CONFLICT RESOLUTION

OPER TUNE

SAP System

LEVEL SKETCH

WIRING CONNECTION

SAT

LOOP TEST

FUNCTION TESTING

RESPONSIBLE

DECISION MAKING

MS OFFICE

ONE LINE DIAGRAM

DESIGN SPECS

HOOK-UP

PROFESSIONAL EXPERIENCE (7 years and 7 months)

Instrument Engineer (2 year and 9 months)

Sitara Chemicals Industries Ltd,

Nov 2018 to date

32KM Shekhpura Road, Faisalabad, Pakistan

I&C Engineer

Sitara Chemicals Ltd

I am responsible for managing maintenance as well as in project activities in SCIL. Currently I am working on 144TPD Soap Noodle project which embodies erecting, procurement construction and commissioning of the project. My responsibilities are listed hereunder.

·Provide technical support to supervisors and technicians by monitoring and organizing their working activities and report daily activities of the department.

·BOQ preparation for Instruments & Control Systems.

·Sizing and selection of control valves(Fisher, Samson, Masonelian).

·Sizing and selection of field instrumentation(Emerson, E&H, Krohne, Yokogawa, WIKA, ADCA).

·BOQ preparation for Instrument accessories(Cables, Cable trays, IA pipes and fittings, JB's).

·Selection of DCS(Honeywell, Yokogawa, Hollisys, ABB).

·Installation and commossioning of field instruments and control system

·To manager and maintain availability of materials, spares & tools needed for the routine, preventive and breakdown maintenance jobs.

·Develop the procedure and SOP’s for routine, preventive and breakdown maintenance jobs.

·Prepare project budgets plans and timescale.

·Maintain record and history of Instruments and their spares.

·Perform SAT for the up gradation project.

·Perform Inspection and testing of the newly arrived material/Instruments.

Engineer (E&I) (1 Year 7 months)

Al-Tariq Contractors & Engineers/BORSIG GmbH

May 2017 to Nov 2018

Thermal Power Station GUDDU, Pakistan

I am responsible for all the commissioning activities related to E&I as listed below:

·Leading a team of engineers, supervisors and technicians of subcontractor to perform erection of instrumentation work and carry out SAT of different packages.

·Conduct the pre-commissioning and commissioning of the instrumentation and controls systems.

·Loop, Functional & Stoke Testing of all Instruments.

·C&E Test of BORSIG Compressor units.

·Interlock Testing of BORSIG compressor units.

·Responsible for all the field activities (Termination, Cable laying, CTIR, Troubleshooting).

·Motor solo-run test.

·Load-Run test.

·HT, LT distribution, HT, LT Protection, IDMT Relays (Vamp-40, MiCom-P1115, Micro Logic 5.0.E) MCCBs(VCB, ACB), Motor Connections(Star Delta, VFD).

Instrument Engineer (ATOM PROJECT) (2 years)

Hyundai Engineering & Construction Company

Jan 2015 – Dec 2016

Attock Refinery Limited Rawalpindi Pakistan

Lead the team during of engineers, supervisors and technicians the whole below listed commissioning activates:

·Functional Testing of Process Units (HB1, HT/SR, HDS, SRU, SWU, AMU, ISM, LHT).

·Cause & Effect Verification of Heaters (HDS-H-001, HDS-H-002, LHT-H-001, LHT-H-002)&all the process area.

·Stoke testing of all the process Units valves (ON/OFF, Globe Valves, Rising Stem Ball Valves and Butterfly Valves).

·Hands on experience on control system (C200, C300, FSC Honeywell and TDC-3000, Siemens S7-400).

·Responsible for loop testing for all process Units. ISM, DHDS, CWS, FLS and HBI units.

·Checking Control System Hardware as per drawing and preparing readiness for SAT (Site Acceptance Test).

·Responsible for all the field activities (Termination, Cable laying, CTIR, Troubleshooting) on the ISOM/LHT area.

·Initiate tool box meeting with technicians.

·Initiate morning meeting with sub-con management.

·Conducted SAT (LHT compressor control system, ISM compressor control system, Dryer control system (Honeywell C300), IRP panel and CWS sand filter LC panel, S7-400 Control System).

Instrument Engineer Trainee(1 year 2 months)

Attock Refinery Limited

Aug 2013 – Sep 2014

·I was one of the member of the team responsible for all activities related to the Instrumentation and Control Systems in Attock Refinery Up-gradation (ARU) Projects, which embody the commissioning of new Distillation and Reformer Units, revamping of existing distillation/reformer units, Power Plant capacity up-gradation and Utility and Offsite facilities.

· Reviewing of Drawings/Documents like P&ID’s, Loop diagrams, Layout drawings, Wiring diagram, Cable schedule, Hook ups, Installation Details, Field Instrumentation details,

·Review of control philosophy, P&I Diagrams, cause & effect diagrams, instruments list.

·Knowledge on various communication protocols like HART, MODBUS protocol.

·Lead a team of highly skilled and experienced technicians in various projects at plant site.

·Managing plant related routine maintenance activities and also planning and executing plant shutdown maintenance and annual plant shutdown maintenance activities.

EDUCATION

EXAM / DEGREE

YEAR

NAME OF INSTITUTE

UNIVERSITY / BOARD

PERCENTAGE

B.Sc. Electronics Engineering

2012

Muhammad Ali Jinnah University, Islamabad

Muhammad Ali Jinnah University

3.17CGPA)

DAE(Electronics)

2007

Swedish institute of technology, Rawalpindi

PBTE, Lahore

76%

10th Board

2003

F.G Public secondary school, Morgah

Federal board

54%

AWARD AND CERTIFICATES

·Got letter of Appreciation from Hyundai Engineering for my services.

·Dean Roll Honor (Above GPA 3.5) during BE (Electronics).

·1st prize in final year project competition in Industrial Open House held in Muhammad Ali Jinnah University.

·COMSATS Certified PLC & SCADA Associate PSA) (Certificate)



Contact this candidate