Post Job Free
Sign in

Civil Designer

Location:
Houston, TX
Posted:
July 13, 2021

Contact this candidate

Resume:

ROBERT O’DONALD BROOKS

***** ******* ******** **** # **** HOUSTON, TX 77070

PHONE 832-***-**** • E-MAIL ***********@*****.***

OBJECTIVE

To use my 20 years of experience as a civil designer for the development of plans, specifications and estimates for transportation, site development, drainage and subdivision projects.

SUMMARY OF QUALIFICATIONS:

I have 20 years of experience as a civil designer in the preparation of plans, specifications, and estimates for civil development projects. I also have experience in utility coordination and the preparation of utility relocation plans where required. My design experience includes numerous projects whether city, county or state.

I have extensive TxDOT training in all aspects of roadway design including Microstation, Geopak, Urban Storm Sewer, Hec-Ras, and PS&E Package. In addition, I have considerable knowledge of Winstorm, Microsoft Word, Microsoft Excel, AutoCad, and Microsoft Access.

WORK EXPERIENCE:

July 2008 - April 2012 Civil Designer RCM Technologies Houston, Texas

LJA Engineering:

(1) Designed streets, water, sanitary sewer, and storm sewer for subdivisions and boulevards within the City of Missouri City. (2) Redesigned and updated quantities on Sienna Ranch Road due to a conflict with the existing right-of-way. (3) Computed and checked quantities on existing plans.

Othon Engineering:

(1) Designed centerline for Richey Road. (2) Wrote letters and followed up with phone conversations to Harris County Engineering officials. (3) Attended meetings with Othon and Harris County and prepared minutes of the meetings for all attendees to review.

2002 – 2008 Engineering Tech IV & V Texas Dept. of Transportation Tyler, Texas

I.H. 20 Bridge Replacements at Harris Creek:

1.Prepared the Bridge Layouts for the replacement of existing bridges on I.H. 20

2.Prepared the traffic control and phasing plans for this project

Right Turn Lane and Acceleration Lane - Loop 323 at U.S. Hwy 271:

1. Lead designer for this project

2. Prepared plans, determined drainage areas and sized inlets and storm sewer

3. Prepared PS&E package

S.H. 110 between Prairie Creek and F.M. 849:

1.Lead designer for this project

2.Prepared digital terrain model

3.Calculated superelevation, input into Geopak and created Cross-sections

4.Calculated drainage areas and prepared the hydraulic data sheets

5.Cross checked the estimate to the summary sheets and prepared PS&E

F.M. 2661 between S.H. 155 and Big Eddy Road:

1.Designed and prepared the Plan & Profile Sheets

2.Designed and prepared the Culvert Cross Sections

County Road 168 Bridge Class Culvert:

1.Prepared Plan & Profile Sheets and Bridge Layout

2.Sized the multi-box culvert using Hec-Ras

3.Prepared the estimate

S.H. 64 from 2.05 miles west of Smith County Line to F.M. 724:

1.Design the urban storm sewer

2.Prepared the storm sewer Plan & Profile Sheets

3.Coordinated work with the airport entrance roadway engineers

1999 – 2002 Senior Technician III Rust E & I Houston, Texas

FM 1876 (Eldridge Road) between Bellfort Road and U.S. 90:

1.Coordinated with high pressure pipeline companies where potential conflicts with the proposed storm sewer were detected

2.I was the contact person for all utility adjustments

3.Designed plans for sanitary sewer and water line relocations

4.Designed Detention Pond in coordination with environmental agencies

Texas Medical Center – Houston, Texas:

1.Contact person between Rust E&I and Brown & Root’s Construction Manager

2.Resolved construction conflicts and revised Plan & Profile Sheets as required

1994 – 1999 Senior Project Designer Century Engineering Houston, Texas

Pine Hollow Subdivision - Pearland, Texas:

1.Planned and designed subdivision from beginning to end

2.Prepared Plan & Profile Sheets to include designs for storm sewer, water mains and sanitary sewer using AutoCad

3.Prepared FHA Grading Plan

4.Corresponded frequently with the project developer and attend meetings with City and County officials

Ella Boulevard between Pinemont & West Little York (City of Houston)

1.Prepared and wrote the Preliminary Engineering Report including Exhibits

2.Project Designer for the design and preparation of construction plans

3.Prepared the Final Cost Estimate

1990–1994 Engineering Tech IV & V Texas Dept. of Transportation Houston, Texas

I.H. 45 (Gulf Freeway) Airport to Almeda Genoa:

1.Designed exit and entrance ramps

2.Designed storm sewers and detention ponds at Almeda Genoa

Sam Houston Tollway at U.S. 290 Interchange

1.Designed the framing plan and beam seat elevations for 4 direct connectors

2.Prepared the plan and profile sheets for the direct connectors

EDUCATION

1985 – 1990 Attended Texas A&M University ( 100 hrs.) Pre Med, Civil Engineering

1986 – 1987 Stephen F. Austin State University Summer School



Contact this candidate