Post Job Free
Sign in

Electrical Power Engineer

Location:
Chennai, Tamil Nadu, India
Posted:
July 13, 2021

Contact this candidate

Resume:

INFO

ADDRESS

*/** **, ****** ****, Asakalathur

Village, Kallakurichi, Tamilnadu- 606204

India

PHONE

+919*********

EMAIL

adnpb9@r.postjobfree.com

BIRTHDATE

**/**/****

NATIONALITY

INDIA

DRIVING LICENSE

Indian License

PASSPORT DETAILS

Passport Number: V1297580

Date of Issue: 07-07-2021

Date of Expiry: 06-07-2031

LANGUAGES

ENGLISH

HINDI

TAMIL

MALAYALAM

SKILLS

PROJECT MANAGEMENT

SITE MANAGEMENT

MECHANICAL COMPLETION

ELECTRICAL PRIMARY TESTING

PROFILE

Certified engineer with a master’s degree in electrical engineering. Hopeful for an electrical engineering position to help in resolving Quality and development issues. EDUCATION

Master of Technology, SRM University

Chennai 2009 June - 2011

First Class with Distinction - CPGA 8.76/10

Bachelor of Engineering, St. Josephs College of Engineering Chennai 2005 August - 2009 September

EMPLOYMENT HISTORY

QA/QC Engineer, Renaissance Heavy industries

Svobodny, Amur Region, Russia 2019 June - 2020 September

Ensure that Company HSE Policies and Procedures are adhered to in all phases of Work.

Provide guidance and leadership on all subjects related to Mechanical Completion.

Assist Projects in planning and development of System Completion Plans.

Participate in the Process to approve Contractors Completion Management System (CMS) to be used as a tool to plan and report status on mechanical completion, preservation, and pre-commissioning.

Ensure, evaluate, and confirm that the Completion management system (CMS) is used for status tracking, Certification, and Quality Purpose as outlined in the MC Manual.

Work closely with the site engineering and construction team to ensure their understanding of completion requirements to provide the seamless transition from engineering through construction and handover to commissioning.

Monitoring and guiding EPC Contractors mechanical completion organizations concerning mechanical completion planning and execution procedures, process, and deliverables.

Development of mechanical completion management procedures, functional and section checks, (PTW), Handover to commissioning (MCC), Factory Acceptance test (FAT)Plans and Schedules.

RAMESH

RAMAMOORTHY

QA/QC Electrical Engineer

Monitor and report status on mechanical completion activities by Contractors.

Plan and co-ordinate client involvement in mechanical completion activities.

Ensure that mechanical completion is completed in a timely and efficient manner. QA/QC E&I Engineer, Gulf Spic General Trading, and Contracting Company

Kuwait 2018 January - 2018 July

Detail Study of Project quality Requirements, Client Specifications (KNPC).

Coordination with Client for all Inspection Activities.

Ensuring and regular auditing for Implementation of Project Procedures and Specifications from Engineering, Material procurement, Material handling, Utilization, to the end process towards Quality Management system.

Inspection of complete Earthing systems (Equipment & Structural) and Earth rod installation & Earth Plate installation and testing of the earth resistance value.

Reviewing of Electrical Drawings & Documents such as Electrical Equipment Layout, Electrical Cable Schedule, Electrical Wiring diagram, Electrical Circuit Diagram, Single Line Diagram, Lighting Layout, Earthing Layout, Standards / Specifications, Cable Tray Layout, Electrical Equipment Support Drawings, etc.

Reviewing of Instrumentation Drawings & Documents such as Vendor Datasheets, Material Test Certificates, Test Reports, Calibration reports Cable Schedules, Layouts, Piping, and Instrumentation drawing.

Coordination of Material Receiving Inspection with Client on all E&I Materials.

Co-ordination with other discipline Supervisors like Mechanical, Civil, piping to ensure that the E&I works are executing without the obstruction of other disciplines.

Inspection of Electrical Power Cables and Control Drums, transportation, loading, unloading, and testing before installation.

Inspection on Installation of Cable trays, DB & JB Support, and other Support works according to approved drawings and Standards/Specifications. QA/QC Engineer, AL Gihaz Holding Company Limited

Abha, Kingdom of Saudi Arabia 2015 June - 2017 July

Perform Inspections and Tests as required by the discipline of all Electrical & Instrumentation installation activities at the site.

Assist with tracking and logging Non-Conformance Reports, Quality

/Productivity Improvement Reports.

Implementation of Quality Plan for the assigned Project which includes inspection, testing, and Proper documentation.

Ensure that all the works Complied with Client/Contractor issued drawing are in applicable standards and specifications.

Ensure that all related inspections and testing activities concerning Environment, Health & Safety Procedures and maintenance are respected.

Perform proactive surveillance inspection to minimize or avoid discrepancy and non-Conformance rectification cost and time.

Ensure effective coordination with the client related to inspection, testing activities, and documentation.

Control and monitoring of material flow to the site, controlling of drawing as per Contract and client requirement.

Making of internal punch list for incomplete works and to submit to the Site Manager and the Project Manager for a further action plan with routine follow up for closure.

Keep records of all test reports and changes suggested by SEC CSD and Consultants and ensure proper markups approved Signatures.

Preparation of Quality related documents as per clients' requirements such as Quality Control Plan, ITP, Method of Statement and related work Instructions and liaison with the client for the approvals.

Junior Electrical Engineer, Sendan International Company Limited

Al Jubail, Kingdom of Saudi Arabia 2012 August - 2014 August

Preparation of Quality related documents as per clients' requirements such as Quality Control Plan, ITP, Method of Statement and related work Instructions and liaison with the client for the approvals.

Responsible for incoming materials Inspection concerning approved specifications, Datasheets Material approval, and Quality Plan.

Responsible for maintaining IMTE in the Project site, Coordination with the laboratory for witnessing the Calibration of the instruments such as pressure Gauges& Recorders Level Transmitters.

Monitoring the installation and testing of various panels such as 4.16V SWGR Panels,0.48KV Switchgear Panels & LV Switchboards, and HVAC as per the approved procedures.

Monitoring the Installation and Testing of LV Transformers(20MVA), Diesel Power generators as per the Quality Plan.

Carry out Inspections for electrical installation and testing of Motors, Motor Control Center panels, and earthing to confirm that all quality aspects as per QP Standards are met.

Inspection for installation of Instrument junction boxes, Motor operated valves, pressure and temperature transmitters, gauges, and F&G System.

Issuance of NCR, Preparation of look-ahead schedules, and ensuring that all the schedules are met with specifications.

Taking Preventive and predictive actions for the non-conformities observed on site.

Raise (RFI) request for Inspection for electrical and Instrumentation activities whenever these hold points or witness points.

Material quality control to make sure and conforms to the engineering standards, specifications, and codes.

Supervision for the Installation and testing of fire alarm systems as per standard requirements.

Ensure that measuring and testing equipment are calibrated properly before use on test activity.

Submit daily reports, field clarification for any deviation and conflicts of design, and issued for construction drawings.

Supervision on the Installation of conduit pipes, cable pulling, wiring of equipment (lighting, grounding, and feeder line)

Witness testing and Commissioning of equipment inclusive of Insulation resistance Test, Hi-potential test Contact resistance test and loop checking of control connection and others required by the standard's prior start-up of the equipment and handed over to the end-users.

Maintain Log register, discuss discrepancies/violation of standards with a section in charge, and issue a notification to concerned contractors for corrective action as and when necessary.

Follow-up and rectify discrepancies notified, or remedial action including documentation.

COURSES

ISO 9001:2015 Quality Management System Auditor -

Udemy

2021 March

Power System Protection- Primary Equipment, MSME - Government of India

2019 February

PG Diploma in Industrial Automation- Prolific Systems and Technologies

2012 November



Contact this candidate