Pv Solar System at roof top and ground mounted, project management etc

Location:
Muscat, Oman
Posted:
July 12, 2021

Contact this candidate

Resume:

First /Given Name

:

SREE RAMA CHANDRA MURTHY

Family / Surname

:

CHALLA

Date of Birth

:

**-**-****

Nationality

Address for Communication

:

:

INDIAN

C. SREERAMA CHANDRA MURTHY

UIB/311,

Petroleum Development Oman LLC

P.O.Box81, Muscat

Postal Code 100

Sultanate of Oman.

Tel Off : +968-********

GSM : +968-******** & 91279904

GSM : +91-996**-***** (INDIA) IL : E-mail : adnoq6@r.postjobfree.com

: adnoq6@r.postjobfree.com

Profession

:

CIVIL ENGINEER

Educational Background

:

B.Tech., (CIVIL)-DEGREE IN CIVIL ENGINNERING

Additional Qualifications

Achievements

:

Lead Auditor (IRCA-U.K), HSE - H2S Awareness & Escape, Job Hazard Analysis & Permit to work Signatories, Safety Training Observation Programme (STOP), Scaffolding Certification, Managing risks in Construction Projects (NICMAR-HYDERABAD), Contract Holder ship Certification Scheme (Post Contract) & Anti Bribery and Corruption (ABC)

Winner of Director’s Award 2011 & 2013, Shukran awards Language(s) known

:

ENGLISH, HINDI & TELUGU

Driving License

:

VALID Oman license till 2022

EXPERIENCE SUMMARY

Extensively varied experience of 28 years in various fields of engineering such as Civil Engineering, QA/QC Engineer, Company Site Representative (CSR) & project Management in industrial and infrastructure projects of Oil& Gas, Power and Construction companies in Oman, Qatar and India.

Familiar in PDO specifications, proven track record in handling entire aspect of the project, construction management, Quality control & Assurance, vendor quality and handing over to the project requirement.

Excellent in reporting system to project/construction management i.e., preparing weekly, Monthly reports, preparing MOM

A motivated and diligent team player utilizing communication, high degree of inter personal skills with strong analytical mind to learn quickly, to analyse the situation, identifying requirement and provide solutions

PDO EXPERIENCE DETAILS

Company : Petroleum Development Oman (Secondment)

Duration : 5th August 2007 to 31st March 2017-VELOSI

: 1st April 2017 to July 2018- INTERTEK

: 24th July 2018 to till date –NEXUS GLOBAL UNITED LLC (PDO MANPOWER SUPPLY SERVICE CONTRACT)

Position : UIB311, Company Site Representative (CSR) in Projects - UIB3 TEAM

Responsibilities:

Health Safety & Environment (HSE):

•Verify and monitor the contractor systems performance in accordance with the Contractor’s approved HSE plan.

•Recording of any HSE non-compliance and investigate remedial action by contractor in liaise with site HSE advisor.

•Recommend HSE default on contractor for unauthorized deviation from contract HSE management plan in liaison with CR/CH.

•Coordination of weekly and monthly HSE meetings, workshops along with PDO safety team.

•Participated in management visits, audits and inspections carried out by corporate team.

•Verify the plant and equipment records in accordance with approved inspection and test procedures, codes and standards along with corporate HSE team.

•Promote HSE awareness and best industry practices amongst construction support group and participated in relevant safety audits along with HSE advisor. Encourage safety TBT (Tool Box Talks) and near missing reports.

•Issued STOP (Safety Training & Observation Programme) cards to work force whenever any unsafe acts observed at the work sites and discussed with them about hazards involved and closing of cards after corrective action taken. Appreciated workforce whenever safe act was observed.

•Monitoring the erected scaffolding i.e. firmness for ground, verticality of standards, working platform with minimum no. of boards, security of guard rails & toe boards, means of access, scaff tag etc.

Quality:

•Review and recommendation of MAS (Material Approval Sheet) for materials pertaining to project as per PDO/Contract specs.

•Ensure that all the documents specified in Contract Quality Plan and QCP are implemented in order to achieve satisfactory handing over to PDO

•Witnessing soil investigation, other lab tests etc. as a part of construction supervision confirming compliance to project/PDO specification and inspection test plans for civil/structural works.

•Issued NCR’s to Contractors on non-compliance according to PDO /contract specifications & closing of NCR’s after corrective action

•Inspect activities according to RFI’s (Request for Inspection) submitted by contractor for different activities like setting out, earth work excavation, blinding, reinforcement, concreting, backfilling, grade and roof slab, roof water proofing, cable trench excavation, laying of HDPE fresh water, irrigation, sewer lines from the first manhole to hook up point, and all finishing activities etc.

•Monitoring concrete pour as per approved mix design and witnessed slump test and cubes strength tests.

•Effectively managing sub-contractors are employing in the project. Monitoring sub-contractors quality management system, their reporting system according to ITP’s auditing regularly for effective functioning of Quality system and ensuring that corrective actions are closed on time.

•Monitor, verify and ensure all associated O&M manuals, as built drawings, test packs, warranties and all related test certificates, technical and financial close out of project prior to hand over the same to maintenance team.

•Work collaboratively with QC and supplier quality on the project to validate material and equipment meets design requirements and project critical safety and parameters, meeting the requirements. Performing vendors & sub- contractors prequalification audits ensuring subcontractors quality management system in line with contractual requirements.

•Monitoring the procurement of long lead items and to verify the Material Track Register (MTR) on regular basis

•Reviewing and approving VDRL, Manufacturing procedures, ITP’s, Quality Control procedures, clarifying vendor queries related to specifications, attending pre inspection meetings, coordination for stage wise vendor inspections as per ITP and issuing final inspection release notes.

•Familiar in conducting of internal Quality Audits, sub-contractors audits, preparing audit finding report and report to the senior management including corrective/preventive action as per schedule and witnessed external audits by Third party

Contractual:

•Company site focal point and in liaison between Company Representative and contractors.

•Maintain up to date register of minutes of meetings and correspondences.

•Responsible in contract administration and claim management.

•Regular meeting with QS and project team to discuss and agree the cost variations.

•Monitor usage of PDO facilities and materials used by contractors and recover the cost as mentioned in the contract document.

•Company site focal point for contractor mobilization and demobilization

•Coordination with client, sub-contractors and consultants to resolve issues related to contract

Financial:

•Monitoring of contract financial controls, schedule commitment and compliance, value of work done reporting and performance checks.

•Reviewing of VTC submitted by contractor and authenticate quantities along with PDO QS and minimize the variations with proper cost control

Planning:

•Monitoring Progress according to S-curve (Actual Vs Planned) and to review the progress as per project schedule (L-4) submitted by contractor.

•Monitoring the Project schedule for the completion of the project with in time, cost, Quality and HSE as per PDO Standards by conducting weekly and monthly progress meeting with the contractor, sub-contractor and other Project Support Team

Challenges:

•Resolved disputes/miscommunication arises between the contractor and other parties as and when required.

•Re-routing of underground facilities if any found during excavation with the approval from the concerned discipline lead

•Provide periodic feedback on contractor overall performance highlighting shortfalls and areas of improvement if any.

•Trained and developed Six (6) Oman engineering graduates

•Recording and implementation of Key learnings

•Maintain quality and delivering the project on time

ON GOING PROJECTS:

1.CONSTRUCTION OF MAF 1MW PV SOLAR TRACKER PROJECT:

The project involves construction of single axis Bi-facial 1MW Tracker (solar PV plant) in Mina Al Fahal which includes grading, levelling & backfilling, pile foundations. Supply of solar panels, trackers, inverters, testing, commissioning and performance testing of complete system by maintaining design criteria, inverter station, cables laying (DC&AC), aesthetics, access to the vehicles and handing over the complete system.

Completed Projects:

1) SOLAR POWER PROJECT AT MAF PRKING LOTS (Ph-1 & 2):

Design, Supply, Installation, Pre-commissioning, Testing and Commissioning of complete 8 MWp capacity solar PV power plant at Mina Al Fahal area by installing PV solar panels at new and existing modified parking lots with structural steel and hooking to the existing grid with related civil/structural foundation works and associated external works like kerb stone installation, interlock paving/asphalt laying with allied traffic signs, parking lane /road markings, inverter station, cables laying (DC & AC) etc...

2.CONSTRUCTION OF BMF (BAIT MINA AL FAHAL) BUILDING WITH INTERIOR DECORATION ($ 83mn)

Project Overview: The project involves construction of New Head Quarter building. The building has a built-up area of 35,000 M2 and biggest office building in Oman. It has G+3 floors, 12 no. of Workstation with an area of 900m2 each, 6 passenger lifts & 3 Service Lifts, Substations and service compound, 3 Culverts, 300m long Drain Channel, Roads & 955 nos of shaded Car parking area.

Other Services included:

1.Substation with 2000KVA & 1600KVA transformer 3no.each

2.Building Management System

3.Sound Masking System for Workstations

4.CCTV & Access Control System linked to Main PDO security

5.Fire Alarm System linked to PDO Fire System

6.HVAC system

7.Security System (tele gating, luggage scanner & metal detector)

8.IT system

9.PA system and SMATV system

10.DIGITAL signage system

11.Collaborative Work Environment (CWE)

12.CO2, H2S & Motion Tracking sensors

13.Soft & Hard landscaping

14.100m Underground Tunnel for main electrical Cable

15.Recovery Systems: Fresh water and fire storage tanks, Underground tunnel for main electrical cable, Generator for IT system

16.Saving of Energy: Air Condition, Sensor for meeting rooms lighting system, Using Air Condition condensate water for irrigation.

17.ID works such as open plan offices; break out areas, courtyards, Director Offices, MD, FD & Board rooms, Atrium etc.

3. Construction of NEW AL SHIFAA MOSQUE AT MAF:

To demolish the existing Al Shifaa Mosque and to construct new Mosque for 600 personnel at the existing location with more area and additional facilities as a part of VTC to the PDO new HQ building.

4.PDO Pension Fund Properties ($14 mn):

Demolish 19 no’s of existing villas (19 plots) and construct twin 4 bedrooms, double story villas on each plot resulting in 38 Villas each with a built up area of approximately 400m2 under PDO Pension Fund Property at MSQ (Madinat Sultan Qaboos) area.

5. SHELL DEVELOPMENT OMAN (SDO-$6.5mn):

Construction of 3 story new building with raised plinth level around which includes extensive external works, roads, car parking, guard house, sub-station compound, landscaping and car parking shade structures. A three-story core is at east & west end which provides ancillary accommodation (lift, main staircase, toilets, pantries, meeting rooms, fire escape stair and plant rooms etc.) and the central section of the building is two story’s with staff car parking at ground level and the main office area at first floor level

6. 33 KV MIS & 11KV MIS (Main Intake Station $4.6 mn):

Construction of new 33 KV &11 KV switchgear building for installing the new 11KV Gas Insulated Switchgear and associated equipment like 415V switchboard, 110V DC UPS System, HV& LV Power cables, lighting and small power DB, Control & Automation & HVAC System within the Main Intake Station (MIS) premises in MAF (Mina Al Fahal) area.

7. WELLS LEARNING CENTRE ($ 4mn)

The Wells Learning Centre, a joint venture between PDO and Shell, is a first for the Sultanate and marks a step change in the level of training for well control and certification. A state-of-the-art training facility for experienced wells professionals and newcomers. The building consists of seven classrooms, four simulator rooms, two break-out rooms, a recreational area and a model room and at full capacity will be able to train several thousand students a year. It boasts the latest touch screen technology, digital monitors and gauges to measure reservoir pressure, volumes and flow rates. Instructors can also devise a series of different simulated challenges around well control situations, which fully test the aptitude of trainees in a safe environment

9. CONSTRUCTION OF MAF SKY WALK WAY ($ 4mn)

To construct a structural steel sky walk way (376 mt) at Mina Al Fahal linking the new HQ building to the Existing Green wing Building with exit points for the new Restaurant, new mosque and other emergency exits

10.PDO NEW SECURITY OFFICE ($3mn)

A new security office building was constructed near existing security office at Gate No: 2 with G+1 floor, which include central reception, break out area, central security control room etc. The building will represent the PDO image for outsiders/visitors

11. Bulk Earth works-Ras Al Hamra Development project Phase-1 ($ 2.6mn)

PDO planned as a part of RAH development project to source out the Bulk Earth works for the residential development at RAH area in Muscat Governorate in Oman. The Bulk earthworks includes formation of two haul roads, bulk excavation (Rocks) imported fill and overall site preparation in order to create structural build platforms for residential villas, town houses & apartments, school, golf course and all associated infrastructure.

12. Construction of EcOman Centre/Museum ($ 2 mn): (GIFT TO THE NATION)

Oman Government and PDO management decided to construct an EcOman Museum for public with built up area of approximately 1400 m2 on behalf of 40th National day.

13.TELECOM BUILDING EXT & UPS BUILDING WITH BACK UP GENERATOR ($3.5mn):

Extension of existing Telecom building which is just inside PDO Gate No: 1 is to accommodate more staff and suit plan office and to provide raised access floor system to existing as well as new Server rooms. Relocation of existing 400KV UPS from computer building to Telecom building including construction of new UPS room.

The above projects were completed with the following facilities:

Site development & protection

New Building with raised access floor system (Server+ Office area)

Car park and internal circulation roads

Soft & hard Landscaping

Allied facilities & all associated furniture

Power supply, LV /LDB/PDB panels installation

Solar panels, Inverters, tracking sensors

Structural steel works (inverter station, car parks & Skywalk)

Fresh water, drainage, irrigation water supply connection & distribution

Fire detection/prevention system

Security and Public Address System

Heat Ventilation Air Conditioning system

Voice & Data Network System

Company : VOLTAGE ENGINEERING

Duration : August 2005 to July 2007

Client : QATAR PETROLEUM (QP)

Position : QA/QC Engineer (Civil)

Project: EPIC of the Power Supply to Ras Laffan Industrial City -Addition to 11 KV Network Project of Qatar Petroleum:

Preparation of Inspection Test plans, QC Procedures, Forms & Check lists & Method Statements for the projects.

Handled the EPC project independently, ensured quality assurance & control requirement starting from Engineering, procurement, Construction, Inspection, fabrication, reinstatement, pre-commissioning and commissioning.

Manage all Civil Engineering Material & In situ Tests conducted by Companies Civil Testing Laboratory & Third-Party Laboratories

Ensure implementation of all the QA/QC Procedures, QC Plans and Work Instructions.

Liaise with the QP Site Representative, Consultant for the conduct of day-to-day Quality related activities.

Ensure Availability of Quality System Documents viz: QA/QC Procedures, QC Plans etc. & relevant codes / Standards & specification are at site for reference.

Verification of testing equipment (Measuring Monitoring Devices) related to the job as per requirements

Verify and review corrective & Preventive actions on NCRs / CARs.

Coordinate with the Corporate QHSE Manager for implementation of Quality System requirements, Internal / External Quality Audits and follow up audits if required.

Evaluate performance of sub-contractors based on reports generated during execution of subcontracted activities. .

Ensure Quality Records are maintained as required by Quality system & contract requirements.

Assist the Contracts Manager in compilation of the punch list management, project dossier preparation, As-built packages, commissioning & handover, project close out reports.

Conducting project quality meetings periodically by involving all supervisors, department heads and construction manager, addressing all quality related issues, training to the specific area (e.g. concreting instruments calibration, various levels of document in project etc)

Responsible for verifying and clearing incoming materials and ensuring storage of those as per the vendors and ITP requirements.

Being the quality in charge at site, responsible for Carrying out trial mix of concrete by following design mix of various grades such as C10/20/35 & 40 concrete. Maintaining all civil records as per QCP. Monitoring civil laboratory for numbering of cubes, curing tank etc.

Verification of designs and drawings prior to finalizing material supplies complying with project specifications and BS standards.

Inspection of site preparation activities of excavation, grading, back filling.

Checking formation levels for blinding concrete and sub structure water proofing.

Preparation of weekly, monthly report, project audit reports, NCR status, KPI, Technical queries, vendor deliverables, arranging client meeting regularly, addressing the quality related issues to the project personnel or regular basis Participation in pre and post pour activities and maintenance of concrete batch trace ability records.

Works included switchgear building, pipe supports, cable trenches, drain pits, duct banks, retaining walls, concrete foundations, paving, roads, drainage, landscaping & fencing.

Company : MANTRI DEVELOPERS

Duration : August 2001 to June 2005

Position : Project Engineer

Construction of Residential cum commercial buildings, gated community villas with amphi theatre, landscaping, health club, swimming pool, internal roads, drainage & power etc.

Responsible for coordination and planning of all construction related activities as per approved construction drawings.

Coordination with clients, subcontractors, and consultants.

Monitoring and make follow up with procurement department for proper delivery of materials.

Monitoring the weekly reports, materials approval, inspection requests, and working schedule.

Resolve all technical problems that arise during all stages of the project.

Liaises regularly with various discipline engineers and senior construction engineer to address inter-disciplinary requirements and any overlap for the modifications.

Attend the weekly HSE & progress meeting with client and consultant.

Monitor/Evaluate manpower and equipment availability and its usage.

Perform monthly billings as per contract requirement.

Implementing work progress, Quality activities, and safety activities.

Responsible for delivery of As-Built mark-up documentation for modifications carried out according to site condition and verification of final project document.

Recommended corrective actions and rectification methods for any deficiencies or non-conformances identified.

Company : LEGEND CONSTRUCTIONS

Duration : November 1999 to July 2001

Position : QC Engineer-Civil

Civil/ Structural works for 2 residential blocks with electricity / water distribution including transformers, power lines, drainage and water supply.

Responsibilities:

Initiated quality planning for the project and consulted with the quality manager/project manager concerning preventive and appraisal resources and effectiveness of project quality plan / procedures necessary to achieve the product quality.

Directs, supervises and participates in the activities of the Project Management team to assure product Quality.

Ensured that approved quality control procedures are conformed in the site.

Development and implementation of project quality plan.

Liaise with the certifying Authorities and client representatives.

Inspection of site works, preparation of inspection plans, quality checks as per approved test plans. .

Witnessing laboratory tests for soil, aggregate, concrete, monitoring of concrete mixing and pre pour /post pour inspections.

Inspection of measurements of the layout of building site for excavation and foundations.

Checking of placement of rebar and concrete cover before pouring of concrete in foundations, beams, columns and slabs.

Supervision of erection and commissioning of various utilities like water supply, drainage and roads

Company : NAGARJUNA CONSTRUCTION COMPANY (NCC),

HYDERABAD.

Duration : January 1996 to September 1999

Position : SENIOR CIVIL ENGINEER

CLIENT : IRRIGATION CIRCLE, ANDHRA PRADESH GOVERNMENT, INDIA.

JOB PROFILE :

Srisailam Left Branch Canal works at Kurnool district, A.P. including canal lining with paver blocks.

Overall site in charge for construction of canal lining works.

The primary responsibility is to directly monitor the site engineers on the site and full control over the workforce, plant and equipment.

Preparation of programme and progress review charts.

Ensure that the work is carried out in full compliance with the specification and as per schedule.

Cutting of OGL as per required levels and section.

Preparation of slopes and concreting the slopes by using paver blocks.

Coordinating with client/consultant, ensuring quality standards as per specification and standards.

Assisting the project Manager for claims in respect of monthly payments and variation to contracts.

Company : LANCO CONSTRUCTIONS LIMITED, HYDERABAD

Duration : May 1992 to December 1996

Position : Site Engineer

CLIENT : BHADRACHALAM PAPER BOARD CORPORATION

JOB PROFILE:

Construction, Execution of Civil works for their establishment (BPCL) admin building, machinery foundations, workshop facility, Service bays, staff accommodation, internal roads and landscaping etc.

Supervision of all activities in the site, structural, formworks, concreting, reinforcement, finishing works and installation of underground and MEP activities.

Verify the field quantities and prepare daily field production.

Maintaining workforce reports and day-to-day progress reviews.

Coordinating with Senior Engineers and with the client for smooth flow of the work.